Invitation for Bids Date:

28 June 2017

Loan No. and Title:

3430-IND: Visakhapatnam-Chennai Program - Project 1

Contract No. and Title:

VCICDP/APTransco/01/2017 Augmenting power distribution capacity for meeting industry demand at Kapuluppada, Atchutapuram & Chandanada locations in Visakhapatnam (GIS substation, Substation, Underground cable, Transmission lines and associated civil works) district of Andhra Pradesh

Deadline for Submission of Bids:

10 August 2017, 14.00 hrs. (local time)

Industrial

Corridor

Development

1. The Government of Andhra Pradesh (GoAP) through the Government of India (GoI) has received financing from the Asian Development Bank (ADB) toward the cost of Visakhapatnam-Chennai Industrial Corridor Development Program - Project 1. Part of this financing will be used for payments under the contract named above. Bidding is open to all Bidders from eligible source countries of the ADB. 2. The Transmission Corporation of AP Limited (APTRANSCO), GoAP, (the Employer) invites sealed bids from eligible Bidders for the construction and completion of Augmenting power distribution capacity for meeting industry demand at Kapuluppada, Atchutapuram & Chandanada locations in Visakhapatnam district of Andhra Pradesh (the “facilities”). “Supply, erection, testing & commissioning of (1) Erection of 220/132/33kV GIS at Atchuthapuram and 220kV DC Line from 220/132/33kV Brandix SS to the proposed 220/132/33kV GIS at Achutapuram (3.6kM approx) (2) Erection of 132/33kV GIS at Kapuluppada and erection of 132kV DC with XLPE UG cable from 220/132/33kV Dairy farm SS to the proposed 132/33kV GIS at Kapuluppada (14.35kM) (3) 132 KV Bay Extension works for proposed 132 KV Kapuluppada feeders at 220/132/33kV Dairy farm SS & (4) Erection of 220/132/33kV SS at Chandanada village in Nakkapalli mandal in Visakhapatnam District by making LILO of 220kV VSS-Kakinada SC line and 220kV Anrak – Samalkota SC line (20kM) on total turnkey basis in the state of AP”. The time for completion of the facilities is 24 months. 3. International competitive bidding will be conducted in accordance with ADB’s SingleStage: Two-Envelope bidding procedure and is open to all Bidders from eligible countries as described in the bidding document. 4. Interested eligible Bidders may obtain further information from and inspect the Bidding Documents at the Employer’s address given below on any working day between 10.30 hrs. and 17.00 hrs.

5.

To purchase the bidding documents in English language eligible bidders should: 

Pay a non-refundable fee by crossed Demand Draft drawn on any Scheduled /Nationalized Bank/Foreign Bank having correspondence Bank in India drawn in favour of the “Pay Officer, Transmission Corporation of Andhra Pradesh Limited, Vidyut Soudha”, payable at Vijayawada, noting the Bid Identification number VCICDP/APTRANSCO/01 and sending the receipt to Chief Engineer / Construction /APTRANSCO/ Ground Floor, Vidyut Soudha, Vijayawada. Ph: 866-2429231. INDIA, with a requisition furnishing the complete postal address, who shall authorize sale of document on all working days from 10.30 A.M to 5.00 P.M during the period of sale mentioned below.



Cost of Bidding Document: Firms within India

Firms outside India

IN PERSON

Rs. 20,500/-( incl of APVAT@5%)

Rs.20000/- or US$ 400

BY POST

Rs. 20,800/-( incl of APVAT@5%)

Rs.22500/- or US$ 450

6. The bidding document is also available http://www.aptransco.gov.in but cannot be downloaded.

in

the

APTRANSCO

website

7. The Employer will not be responsible for any costs or expenses incurred by bidders in connection with the preparation or delivery of bids including the costs and expenses invested to site visits. 8.

Deliver bid: 

To the address below: Chief Engineer, Construction, APTRANSCO, Ground Floor, Vidyut Soudha,Gunadala, Vijayawada, India - 520004 TELEPHONE No. - (+91 866-2429231).

 

On or before 10 August 2017, 14.00 hrs. (local time) Together with a Bid Security in the amount and form as described in the bidding document. Electronic Submission is not allowed.



Bids will be opened after the deadline for bid submission in the presence of Bidder’s representatives who choose to attend on 15.00 hrs. (10 August 2017). 9. The APTRANSCO will not be responsible for any cost or expenses incurred by Bidders in connection with the preparation or delivery of Bids. 10. A pre-bid meeting will be held on 11 July 2017 at 12.00 hrs. at the address provided below to clarify the issues and to answer questions on any matter that may be raised at that stage as stated in ITB 7.4 of ‘Instructions to Bidders’ of the bidding document.

SCHEDULE FOR RECEIPT AND OPENING OF BID: i) ii) iii) iv) v)

Date of commencement of sale Date and Time of Closing of sale Date and time of pre-bid meeting Due date and time of receipt of bids Date & Time of Opening of bids

15.00 hrs. on 27 June 2017 12.00 hrs. on 10 August 2017 12.00 hrs. on 11 July 2017 up to 14.00 hrs. on 10 August 2017 15.00 hrs. on 10 August 2017

N.B: If any of the above dates happen to be a holiday, the next working day will be the due date Address for Communication: Chief Engineer, Construction, APTRANSCO, Ground Floor, Vidyut Soudha,Gunadala, Vijayawada India - 520004 TELEPHONE No. - 91-8662429231 e-mail: [email protected]

Visakhapatnam-Chennai Industrial Corridor Development Program

Jun 28, 2017 - Atchuthapuram and 220kV DC Line from 220/132/33kV Brandix SS to the proposed. 220/132/33kV GIS at Achutapuram ... TELEPHONE No.

179KB Sizes 0 Downloads 299 Views

Recommend Documents

Delhi Mumbai Industrial Corridor Development Corporation Limited ...
Delhi Mumbai Industrial Corridor Development Corporat ... For Finance Executive Post Application Form 2016.pdf. Delhi Mumbai Industrial Corridor ...

North-South Road Corridor Investment Program - Asian Development ...
Sep 30, 2015 - Works on the support layers will be carried out in the same time with carriageway repairing ... Standard Chartered Bank, New York, USA, Addr:.

North-South Road Corridor Investment Program - Asian Development ...
Sep 30, 2015 - Part of this financing will be used for payments under the Contract ... repairing of carriageway layer structure, treatment of support surface layers ...

pattullo corridor study pattullo corridor study - CBC.ca
development of the key technical findings for inclusion in the long term ... Implementation costs have also been developed for each of the options under ...

pattullo corridor study pattullo corridor study - CBC.ca
development of the key technical findings for inclusion in the long term ... Implementation costs have also been developed for each of the options under ...

Osgood Corridor Plan.pdf
LANDUSE MAP. PREPARED FOR. RGPL 591A. BY: Ivette Banoub, Kirsten Bryan,. Jonathan Cooper, Tara Gehring,. Anita Lockesmith, Jennifer Stromsten.

OA-Industrial Development Corporation.pdf
www.keralapsctips.blogspot.in. Page 2 of 2. OA-Industrial Development Corporation.pdf. OA-Industrial Development Corporation.pdf. Open. Extract. Open with.

Dholera Industrial City Development Limited.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more ...

leadership & development and mentoring program
The SD Principal Leadership & Development (PLD) and. Mentoring programs are designed to provide professional development, resources, and a network of ...

Native Student Professional Development Program
(TWS) is increasingly concerned about the lack of ethnic and cultural diversity within the ... in a career fair and attend a host of student activities including a ...

Bridger Canyon Corridor Planning Study
Apr 2, 2015 - View the full list of corridor needs and objecves online ... Alternave accessible formats of this informaon will be provided upon request. For more ...

Bridger Canyon Corridor Planning Study
Apr 2, 2015 - interfere with a person's parcipaon in any service, program or acvity of the department. Alternave accessible formats of this informaon will be ...

A corridor linking protected forests
sustainability is afforded less attention in the PRSPs than the achievement of other MDGs. This is of ..... maximum score that a group could award was set at six.

44; denver - Welton Corridor Denver, Colorado
Jul 1, 2015 - Email: Zip:80002 meagre liviofliiimrlou (tr ivor ... Email:[email protected] pri80202 . 71112015 ... the Denver Zoning Code or. Former Chapter 5.

Integrale visie Groene Corridor Eindhoven.pdf
Whoops! There was a problem loading more pages. Retrying... Integrale visie Groene Corridor Eindhoven.pdf. Integrale visie Groene Corridor Eindhoven.pdf.

pdf-67\national-industrial-security-program-operating-manual ...
Try one of the apps below to open or edit this item. pdf-67\national-industrial-security-program-operating-manual-nispom-by-department-of-defense.pdf.

pdf-1456\national-industrial-security-program-nisp-operating ...
... the apps below to open or edit this item. pdf-1456\national-industrial-security-program-nisp-oper ... g-unauthorized-disclosure-of-classified-information.pdf.

44; denver - Welton Corridor Denver, Colorado
Jul 1, 2015 - ReqUESt _ ChECk all that Adding/removing/changlng windows l-llllll apply Changes to .... BIKE PARKING: 39 BIKE SPACES [ALL COVERED}.

program development life cycle pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Mahaweli Water Security Investment Program - Asian Development ...
Dec 8, 2015 - Part of this loan will be used for payments under the Contract named above ... Interested bidders can also visit the site on 22 ... person signing the bid. 8. Late bids shall be rejected and electronic bidding shall not be permitted.

CRIPT Automotive Vehicle Development Program ... -
SUPPLY CHAIN MANAGEMENT. MANUFACTURING ENGINEERING. PROJECT MANAGEMENT. KINDLY MENTION YOUR PREFERRED DATE AND TIME FOR ASSESMENT IN OUR CENTRE IN BANGALORE. IT'S A ONE HOUR SLOT, YOU CAN CHOOSE THE DATE AND MENTION ANY HOUR SLOT BETWEEN 11.00 ...