BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City

NOTICE OF POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption On the following date/s and time:

DATE

Oct 9 Mon

Oct 10 Tue

Oct 11 Wed

Oct 12 Thu

TIME

9AM to 5PM

9AM to 5PM

9AM to 5PM

9AM to 5PM

EST. NO. OF CONS. AFFECTED

FEEDER

EQUIP'T REF. OF DE-ENERGIZED AREA

FEEDER 13

B000430 Trans Cut-out

Baguio City: Parts of Amparo Heights, Camp 7

Relocation of Secondary Pole

21

FEEDER 8

B000092 Trans Cut-out

Baguio City: Parts of Crystal Cave, Central Bakakeng

Rerouting of Secondary Lines

76

FEEDER 10

B023376 SECTIONALIZER

La Trinidad: Guadayan, Puguis and parts of Puguis National Road

Reconfiguration of Primary Structure

FEEDER 5

BC04509 Trans Cut-out

Baguio City: Parts of HolyGhost Extension

Installation of Intermediate Secondary Pole

34

FEEDER 4

TALINGGUROY SECTIONALIZER

La Trinidad: Talingguroy, Puguis

-Conversion from 1-phase to 3-phase Primary Line -Installation of Distribution Transformers

78

CIRCUIT 2

HALF-TUNNEL SECTIONALIZER

Atok: Sayangan, Paoay, Englandad Kabayan: Batan Kibungan: Madaymen Buguias: Natubleng and parts of Sinipsip

Correction of Leaning Primary Pole

FEEDER 13

BC12306 Trans Cut-out

Baguio City: Parts of Zarate Compound, Pinsao Proper

Relocation of Secondary Pole

45

FEEDER 11

B027907 Trans Cut-out

Baguio City: Duclas Cario Compound, Tiptop, Pacdal

Installation of Intermediate Secondary Pole

27

FEEDER 13

B000054 Trans Cut-out

Baguio City: Binay-an Compound, Upper East, Camp 7

Restructuring of Secondary Structure

12

FEEDER 5

B015626 SECTIONALIZER

La Trinidad: Gulon – Ambiong, La Trinidad

Installation of Intermediate Primary Pole

41

FEEDER 3

BC08736 SECTIONALIZER

Baguio City: Purok 12, Irisan

-Extension of Primary Line -Installation of Distribution Transformer

193

FEEDER 4

B032115 Trans Cut-out

Baguio City: Parts of Middle Quezon Hill (near Quezon Elementary School)

Restructuring of Secondary Structure

AREAS AFFECTED

PURPOSE

156

986

48

CIRCUIT 4

9AM to 5PM FEEDER 13 Oct 13 Fri

BEKES SECTIONALIZER

Bakun: Sinipsip Kibungan: Madaymen Atok: parts of Atok

Replacement of Rotten Poles

Baguio City: BENECO Headquarters, parts of South Drive, DPS Compound, Military Cut-off, parts of Upper Session Road, DepEd Office, Greenwater, parts of Loakan Road, Hillside, Scout Barrio, Balsigan, Diego Silang, Woodsgate Subdivision, BWD Dedicated Line, Puliwes, San Vicente, Lower Balsigan, Agpaoa Drive, Milo Subdivision, Woodsville Subdivision, Sarok, Kennon road, Kalinga Pelota Court, Petersville, Amparo Heights, Lexber ATING TAHANAN - Relocation of Primary Poles Affected by Road Heights Phase I, Amistad, Montecello, Richgate Square Phase II, DISCONNECTING Widening Crest Wood, Eagle Crest Phase I & II, Ciudad Grande Phase I & SWITCH -Right-of-Way Clearing II, Lexber Heights Phase II, Gumamela, Bakakeng road, New Site SLU-SVP, Forest Gold, Ramsey Pumping, Sto. Nino Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower Liwanag, Loakan Proper, Bubon, Kudirao, Mangga, Pongian, Soyuc, Ongasan

1342

8560

Tuba: Lion's Head, BWD Stage 1, Camp 6 to Camp 1 to Dungon

9AM to 9:15AM

NOTES:

FEEDER 13

FEEDER 13 RECLOSER

Baguio City: Tavera St., Kneedler St., Poblete Extension, Johnhay, BCC, Country Club Village, Happy Hallow Lamut, Marlboro Country, DZWT, GMA, RPN, DZBS, Lualhati, Felipe, Moran, Apostol, De Los Reyes, Europa, Modesta, Good Shepperd, Cuneta, Mines View Park areas, Gibraltar, Romulo Drive, Tuding road, Outlook Drive, Mary Hurst, Lucnab, Teachers Camp to Forbes Park DS, Balangabang, DENR Compound, Villamor St., Portion of Outlook Drive, Innsbruck, parts of South Drive (after Ating Tahanan coming from Military Cut-Off), Portion of Paterno St.

Isolation of Ating Tahanan Disconnecting Switch along South Drive

1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607/09088657202/09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

10046

Scheduled Power Interruption: Oct. 9-13, 2017.pdf

BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

74KB Sizes 1 Downloads 192 Views

Recommend Documents

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N