BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City

NOTICE OF POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

DATE

TIME

FEEDER

EQUIP'T REF. OF DE-ENERGIZED AREA

Oct 23 Mon

9AM to 5PM

FEEDER 4

BC06416 Trans Cut-out

FEEDER 11

BC00711 SECTIONALIZER

Oct 24 Tue

9AM to 5PM

DALICNO VIRAC LINE

AREAS AFFECTED

PURPOSE

EST. NO. OF CONS. AFFECTED

Baguio City: Parts of Maria Pucay - Pinsao Proper

Relocation of Secondary Pole

18

Baguio City: Delos Reyes St. - Outlook Drive

Replacement of Rotten Poles

194

B003249 Trans Cut-out

Itogon: Camanggaan and Acupan - Virac

Secondary Line Reconductoring

56

B000106 Trans Cut-out

Baguio City: Parts of Pacdal (along Ambuklao Road)

Uprating of Secondary Lines

79

Baguio City: Pucsusan, parts of Lucnab Oct 25 Wed

Oct 26 Thu

9AM to 5PM

9AM to 5PM

9AM to 5PM

FEEDER 11

TOWNHOUSE RECLOSER

FEEDER 4

BC09306 SECTIONALIZER

FEEDER 9

BALLUAY Sectionalizer

FEEDER 8

JUSTICE HALL LOAD BREAK SWITCH

Oct 27 Fri

-Right-of-Way Clearing -Re-sagging of Primary Lines -Restructuring of Primary Structure

1,367

Baguio City: Parts of Fairview (near Mothers, BWD), and Quezon Hill Proper (First Road Quezon Hill, ABS CBN and Phases Right-of-Way Clearing area)

98

Sablan: Balluay, Bagong, Yabyabuan, Botot, Bayuga, Banengbeng

Relocation of Primary poles affected by Road Widening

72

-Relocation of Primary Poles Affected by Road Widening -Right-of-Way Clearing -Installation of Intermediate Primary Pole Installation of Distribution Transformer -Correction of Leaning Primary Poles

13657

NGCP POWER INTERRUPTION: Activities are as follows: -Maintenance at DS50BU9 -Installation of OHGW between Str. WHOLE OF ATOK, KAPANGAN, KIBUNGAN, BOKOD, 129-130 of Mankayan-Sagada 69kV KABAYAN and parts of TUBLAY Line Segment WHOLE OF BUGUIAS, MANKAYAN and BAKUN except Kayapa -To facilitate reconnection of conductor Proper loop at Str. No. 131 of the MankayanSagada 69kV Line in connection with the tapping/energization of Hedcor Sabangan SS facility

27,929

Baguio City: Justice Hall, City Hall, City Jail, Abanao St., Chanum St., Abanao Square, Sunshine Supermart, Ganza Reastaurant, Labsan St., Carino St., Otek St., Palma-Urbano, MRR-Queen of Peace Road, City Camp, Quarry, Dr. Carino St., Q.M., Legarda Road, Kisad Road, General Lim St., Baguio General Hospital, Baguio Medical Center, UP Baguio, BCNHS, BGH Compound, PHIL-AM Compound, Upper Balsigan, Campo Sioco, Sto. Rosario, Green Summerville Subdivision, Richview Square, Old Site Bakakeng, Bakakeng Norte, Justice Village, Pucay Road, Kitma, Chapis Village, Sta. Catalina, Crystal Dale Subdivision, Crystal Cave, San Lorenzo, PNB Ville Subdivision, Bengao, Teacher's Village, Atab, Suello Village, Balacbac, Lexberville Subdivision, Dontogan, BPI-Dairy Farm, Stone Hill, Foggy Hill, Green Valley Country Club, Adiwang Road, Tuba: Apugan, Sto. Tomas, Pula to Digdigwayan, Cabuyao, PAGASA, Relay Station, Poblacion Tuba, Badiwan, Poyopoy, Bejajeng, Taloy Norte/Sur

11AM to 2PM

NOTES:

Itogon: Tuding (Monterrazas, Naiba, Alphaville, Binanga, Baguio Gold, Antamok Trail), Ucab (Garrison, Malasin, Docut, Baayan, Jungle Town, Minac, Bua, Alumit), and parts of Gumatdang

CIRCUIT CIRCUIT CIRCUIT CIRCUIT CIRCUIT

1 2 3 4 5

CIRCUIT 1 CIRCUIT 2 CIRCUIT 3 CIRCUIT 4 CIRCUIT 5 RECLOSERS

1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607/09088657202/09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

Scheduled Power Interruption: Oct. 23-27, 2017.pdf

Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Reconductoring 56. FEEDER 11.

66KB Sizes 3 Downloads 252 Views

Recommend Documents

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N