BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City
NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:
DATE TIME
Nov 13 Mon
9AM to 5PM
9PM to 6AM
Nov 14 Tue
Nov 15 Wed
Nov 16 Thu
9AM to 5PM
9AM to 5PM
9AM to 5PM
EQUIP'T REF. OF DE-ENERGIZED AREA
FEEDER 9
B005148 Trans Cut-out
La Trinidad: Sitio Dapiting - Alapang
Correction of dilapidated Service Poles
31
FEEDER 13
BC02232 Sectionalizer
Baguio City: Whole of Pias - Camp 7
Correction of Primary Line Clearance
64
FEEDER 13
B000054 Trans Cut-out
Baguio City: Binay-an Compound, Upper East - Camp 7 Installation of Intermediate Pole
12
DALICNO VIRAC LINE
B003249 Trans Cut-out
Itogon: Camanggaan, Acupan - Virac
Secondary Line Reconductoring
56
Baguio City: Parts of New Lucban, parts of Sto. Nino Slaughter, Teodora Alonzo, Kagitingan, Malcolm Square, Upper Magsaysay Avenue, CenterMall, Dagohoy and Lakandula St., City Market, Maharlika Building, Tiongsan Harrison, Carantes, Lower Mabini, Diego Silang St., Calderon St., Harrizon Road, SSS, Right Side of Session Road going up
-Installation of Load Break Switch -Replacement of Distribution Transformers -Tapping of Primary Line supplying 7-11 of Dangwa Station
Nov 18 Sat
NOTES:
9AM to 5PM
PURPOSE
FEEDER 5
FEEDER 11
B030662 Sectionalizer
Itogon: Yanggacan - Tuding
Replacement of Rotten Primary Poles
22
FEEDER 13
BC12963 Trans Cut-out
Baguio City: Upper and Lower East - Camp 7
Relocation of Secondary Pole
27
DALICNO VIRAC LINE
B003229 Trans Cut-out
Itogon: Skyview, Acupan - Virac
Secondary Line Reconductoring
43
FEEDER 5
BC12650 SECTIONALIZER
Baguio City: Parts of Upper Cabinet Hill, Marcoville, Engineers Hill, DPWH Regional Office, Victory Liner, Microtel, BWD, DPS Compound
-Installation of Intermediate Pole -Reconductoring of Primary Line -ROW Clearing
FEEDER 7
B001504 Trans Cut-out
Baguio City: Parts of Padre Zamora
Correction of Leaning Secondary Pole
45
FEEDER 7
B033868 Trans Cut-out
La Trinidad: Parts of Dreamland Subdivision - Pico
Relocation of Secondary Pole
12
DALICNO VIRAC LINE
IT02951 Trans Cut-out
Itogon: Parts of Dalicno and parts of Batuang - Virac
Secondary Line Reconductoring
76
CIRCUIT 5
CIRCUIT 5 RECLOSER
Whole of Mankayan
Relocation of Primary poles affected by Road Widening
Baguio City: Celestial Village - Asin Road
Replacement of Rotten Pole
POOTEN Trans Cut-out
Tuba: Pooten Resort - Nangalisan
Replacement of undersize Primary Pole
TALINGGUROY SECTIONALIZER
La Trinidad: Talingguroy - Puguis
-Conversion from 1-phase to 3-phase Primary Line -Installation of Distribution Transformers
Baguio City: Minesview Park, Moran, Torres Street, Modesta, Good Shepperd, Cuneta Compound, Gibraltar
Relocation of Primary poles affected by Road Widening
FEEDER 4
9AM to 5PM
AREAS AFFECTED
BALINGIT RECLOSER
FEEDER 3
Nov 17 Fri
EST. NO. OF CONS. AFFECTED
FEEDER
FEEDER 11
BC11701 SECTIONALIZER
MORAN SECTIONALIZER AND ARELLANO SECTIONALIZER
Relocation of Primary Poles
2,539
573
4634 41 1 78 184
FEEDER 3
BATUAN SECTIONALIZER
Tuba: Batuan - Nangalisan
ITOGON POBLACION LINE
B026705 SECTIONALIZER
Itogon: Jurungan, Binunga-an, Saybuan, Palawa, Bitnong, Salishet, Baloy, Riverside, Marian, Binga Tinongdan
Relocation of Pole
105
CIRCUIT 4
SAWMILL SECTIONALIZER
Bakun: Sawmill, Ampusongan, Poblacion BN
Conversion of Primary Line from 13.2 to23kV
122
1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607/09088657202/09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:
MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP
32