BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City

NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

DATE

Mar 5 Mon

Mar 6 Tue

Mar 7 Wed

TIME

9AM to 5PM

9AM to 5PM

9AM to 5PM

FEEDER

EQUIP'T REF. OF DE-ENERGIZED AREA

Feeder 11

B013110/B031829 Sectionalizer/Trans

Feeder 05

Mar 9 Fri

9AM to 5PM

9AM to 5PM

PURPOSE

EST. NO. OF CONS. AFFECTED

Baguio City: Bareng Drive - Bakakeng Norte/Sur

- Installation of intermediate primary pole. - Retirement of rental 3-25 kVA distribution transformers. - Installation of 3-50 kVA distribution transformers. - Right of Way (ROW) clearing.

BC04076 Trans Cut-out

Baguio City: Parts of Lower Brookside and parts of Honeymoon Holyghost

- Replacement of G.I. poles (rehabilitation) - Right of Way (ROW) clearing.

Feeder 09

B004468 Trans Cut-out

Tublay: Parts of Tuel

- Reconductoring of secondary lines. - Right of Way (ROW) clearing.

20

Feeder 04

B032838 Trans Cut-out

Baguio City: Upper Km. 3 – Asin

- Relocation of secondary pole. - Right of Way (ROW) clearing.

75

Baguio City: Parts of Pinsao Proper (Tam-awan) La Trinidad: Parts of Puguis (Longlong Road, BatoLonglong to Talingguroy)

- Conversion of line from 1-phase to 3-phase. - Extension of primary line - Installation of sole use distribution transformers - Right of Way (ROW) clearing.

1,265

- Retirement 3-25 kVA distribution transformers. - Installation of 3-50 kVA distribution transformers. - Right-of-Way (ROW) clearing.

30

Feeder 04

Feeder 08

B002730 Long-long Recloser

TB02665 Tuba: Parts of Poblacion TB (Sto. Tomas, Relay Cabuyao Sectionalizer Station, Cabuyao)

85

154

Feeder 04

B011190 Trans Cut-out

Baguio City: Sadanga Village – Pinsao Proper

- Installation of intermediate secondary pole - Right-of-Way (ROW) clearing.

Circuit 01

KP00098 Sectionalizer

Kapangan: Taba-ao, Cuba, Boklaoan, Balacbac and Beling-Belis Kibungan: Sagpat, Lubo and Poblacion KB

- Relocation of primary line. - Replacement of rotten primary poles. - Right-of-Way (ROW) clearing.

Feeder 11

BC10935/B004823 Trans Cut-outs

Baguio City: Acapulco and El Gobernador – Lucnab

- Conversion of kWh meters from 3-wire to 2-wire - Reconductoring of secondary lines. - Right of Way (ROW) clearing.

Feeder 09

TY00084 Trans Cut-out

Tublay: Parts Acop – Caponga

- Correction of low sagging secondary lines. - Right-of-Way (ROW) clearing.

192

Baguio City: Parts of Upper and Middle Quezon Hill

- Reconfiguration of primary assembly - Relocation of communal transformer. - Right of Way (ROW) clearing.

367

- Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing.

144

Feeder 04 Mar 8 Thu

AREAS AFFECTED

B032122 Zarate Sectionalizer

LT01667 Feeder 04 Talinguroy Sectionalizer La Trinidad: Talinguroy - Puguis

103 1,336 24

Feeder 11

IT03556 Trans Cut-out

Itogon: Bagto – Ucab

- Correction of secondary line clearance - Right-of-Way (ROW) clearing.

93

Feeder 03

BC05322 Trans Cut-out

Baguio City: Cypress – Irisan

- Rerouting of secondary lines. - Right-of-Way (ROW) clearing.

90

- Tree cutting. - Right-of-Way (ROW) clearing.

1,803 152

Feeder 08

B000619 Bakakeng Recloser

Baguio City: Green Summerville Subdivision, Richview Square, Old Site Bakakeng, parts of Bakakeng Norte/Sur,

Feeder 08

BC01201 Trans Cut-out

Baguio City: Parts of Sto. Nino Subdivision – Bakakeng Central

- Relocation of secondary pole. - Right-of-Way (ROW) clearing.

Feeder 11

IT00606 Trans Cut-out

Itogon: Carayan and Baayan – Ucab

- Reconductoring of secondary lines - Right of Way (ROW) clearing

9AM Mar 10 LT01667 - Conversion of line from 1-phase to 3-phase. to Feeder 04 Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Right of Way (ROW) clearing. Sat 5PM NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

54 144

Scheduled Power Interruption: March 5-10, 2018.pdf

Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March 5-10, 2018.pdf. Scheduled Power Interruption: March 5-10, 2018.pdf.

97KB Sizes 1 Downloads 205 Views

Recommend Documents

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

l 510 608
projection tool includes an illumination source and an illu minator aperture. The illuminator aperture has a .... tion relates to an illuminator layout of a projection tool which enables both dense and isolated patterns on ..... a two-dimensional era

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N