BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City

NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

DATE

TIME

FEEDER Dalicno Feeder 05 Feeder 09

Mar 19 Mon

9AM to 5PM

Dalicno Feeder 11 Feeder 07 Feeder 10 Feeder 08 Feeder 11 Feeder 08 Feeder 09

Mar 20 Tue

9AM to 5PM

Feeder 07 Circuit 04

9AM to 5PM

TB00635 Sectionalizer

Feeder 13

BC01393 Sectionalizer

Feeder 13 Feeder 08 Circuit 04 Feeder 05

Mar 22 Thu

Mar 23 Fri

9AM to 5PM

7AM to 5PM

Feeder 13 Feeder 11

Feeder 03 Feeder 04 Feeder 05 Feeder 06 Feeder 07 Feeder 08 Feeder 09 Feeder 10 Circuit 01 Circuit 02 Circuit 03 Circuit 04 Circuit 05

AREAS AFFECTED

B034376 Itogon: Parts of Ampucao (Long Distance, PLDT) Trans Cut-out B012203 Baguio City: Parts of St. Joseph Village (Navy Base) Disconnect Switch La Trinidad: Parts of Alapang, Alno LT01080 Tublay: Parts of Tuel Sablan: Banengbeng, Balluay, Bagong B003116 Baguio City: Parts of Loakan Proper (Sadjo, Loakan Trans Cut-out Magsaysay) B004823 Baguio City: Parts of Lucnab (El Gobernador) Trans Cut-out BC06208 Baguio City: Parts of Guisad Central (Easter College Trans Cut-out Compound) BC04932 La Trinidad: Parts of Poblacion LT (Central Buyagan) Trans Cut-out B039622 Baguio City: Parts of Bakakeng Central (Crystal Dale Trans Cut-out Subdivision) IT00092 Itogon: Parts of Tuding (Gardenia St. Monterazas) Trans Cut-out BC02802/BC08162 Baguio City: Parts of Bakakeng Central (Sto. Nino Trans Cut-outs Subdivision) and parts of SLU-SVP Housing LT00118 La Trinidad: Parts of Betag (Swamp area) Sectionalizer BC06292 Baguio City: Parts of Lower Pinget Trans Cut-out BS00112 Kibungan: Natubleng Proper, Madaymen, Lower and Natubleng Upper Patkiaw including Nabalikong. Sectionalizer

Feeder 08

Feeder 04 Mar 21 Wed

EQUIP'T REF. OF DE-ENERGIZED AREA

BC11056 BC13284 Trans Cut-out BC02881 Trans Cut-out B013591 Lengaoan Sectionalizer BC03845 Trans Cut-out BC02049 Trans Cut-out IT00606 Trans Cut-out

PURPOSE - Installation of intermediate secondary pole. - Right of Way (ROW) clearing. - Installation of intermediate primary pole. - Right-of-Way (ROW) clearing. - Relocation of primary pole. - Right of Way (ROW) clearing.

Baguio City: Parts of Camp 7 (Amparo Heights) Itogon: Parts of Ucab (Carayan and Baayan)

Whole of Baguio City (Except the following areas Lualhati, Felipe, Moran, Apostol, De Los Reyes, Europa, Modesta, Good Shepperd, Cuneta, Mines View Park areas, Gibraltar, Romulo Drive, Tuding road, Outlook Drive, Mary Hurst, Lucnab, Teachers Camp to Forbes Park DS, DENR Compound, Villamor St., Portion of Outlook Drive, Innsbruck, South Drive, Portion of Paterno St., DPS Compound, Lower Cabinet Hill, Green Water, Wagner Road, Military Cut-off, Sta. Scholastica Village, Dagsian, Hillside, Gabriela Silang, Woodsgate, Camp 8, BWD Dedicated Line, Puliwes, San Vicente, Lower Balsigan, Agpaoa Drive, Milo Subdivision, Woodsville Subdivision, Sarok, Kennon road, Kalinga Pelota Court, Petersville, Amparo Heights, Lexber Heights Phase I, Amistad, Montecello, Richgate Square Phase II, Crest Wood, Eagle Crest Phase I & II, Ciudad Grande Phase I & II, Lexber Heights Phase II, Gumamela, Bakakeng road, New Site SLU-SVP, Forest Gold, Ramsey Pumping, Sto. Nino Subdivision, Camp 7, Kennon road, North Sanitary Camp Pias, Youngland, Mangga, Pongian, Soyuc, Ongasan, Lion's Head, and Irisan Substations BWD Stage 1. Tavera St., Kneedler St., Poblete Extension, Atok and Mankayan Johnhay, BCC, Country Club Village, Happy Hallow. Upper Ambiong, Ambuklao Road portion, APTS, Sim-sim Compound, Substations Regidor Street, Maria Basa, Liteng, Pacdal Circle, Sispno Road, Botanical Garden, Kias, Lower Liwanag, Loakan Proper, Bubon, EPZA, Pinesville, PMA, Atok Trail, Magsaysay, Apugan, Spring Hills, Loakan, Woodlane Court, Kadaclan Village, VOA, DENR) Whole of La Trinidad (Except the following areas Lamut, Marlboro Country, DZWT, GMA, RPN, DZBS). Whole of Tuba (Except Camp 6, Camp 4, Kennon Road, Camp 3, Mangga, Twin Peaks, Tabaan Sur).

301

- Replacement of rotten primary poles. - Right-of-Way (ROW) clearing.

899

- Replacement of rotten primary poles. - Right-of-Way (ROW) clearing. - Relocation of secondary pole. - Right of Way (ROW) clearing - Relocation of secondary pole. - Right-of-Way (ROW) clearing. - Reconductoring of secondary lines - Right of Way (ROW) clearing

MELCHOR S. LICOBEN Manager, Network Services Department

8 6 145 45 65 113 400

88 78 38 133 66 6,016 107 96 54

NGCP POWER INTERRUPTION: - Restoration of 69 kV Bus 1 @ La Trinidad Substation affected by the lightning incident last November 14, 2017. - Line Maintenance works along the La TrinidadSablan 69 kV Line which will include the following activities. a) Replacement of wood poles to steel poles. b) Correction of hotspot at North Sanitary Camp disconnect switch. c) Commissioning / Energization of 69 kV Breaker and associated power equipment at Hedcor Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works at La Trinidad Substation

1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

1,002

- Correction of secondary line clearance.

Whole of Makayan, Buguias, Kabayan, Atok, Tublay, Kapangan & Sablan. Whole of Bokod (Except Sombrero, Adunot, Banao, Minac, Lebeng, Hilltop, Ambuklao Proper, Ambangol of Barangay Ambuklao). Whole of Kibungan (Except Tacadang Barangay) Whole of Bakun (Except Kayapa Barangay) NOTES:

655

300

- Conversion of lines from V-phase to 3-phase. - Installation of sole use Transformers. - Right of Way (ROW) clearing. - Extension of 1-phase primary line. Baguio City: Parts of Green Water (Wagner Road) - Installation of Distribution Transformers. - Right-of-Way (ROW) clearing. - Relocation of secondary pole. La Trinidad: Parts of Puguis (Atol and adjacent areas) - Right-of-Way (ROW) clearing. - Uprating of Distribution Transformer from 50 kVA Baguio City: Parts of Camp 7 (Pias) to 75 kVA - Relocation of secondary poles. Baguio City: Parts of Bakakeng Central (Upper Kitma) - Right-of-Way (ROW) clearing.

Baguio City: Parts of West Modern Site (Bugallion and adjacent areas)

18

- Rerouting of secondary lines. - Right-of-Way (ROW) clearing. - Conversion of kWh meters from 3-wire to 2-wire - Reconductoring of secondary lines. - Replacement & relocation of rotten poles - Right of Way (ROW) clearing. - Correction of secondary line clearance. - Right of Way (ROW) clearing. - Relocation secondary pole. - Right of Way (ROW) clearing. - Installation of intermediate secondary pole. - Right of Way (ROW) clearing. - Relocation of secondary pole. - Right-of-Way (ROW) clearing. - Correction or primary/secondary line clerances. - Right-of-Way (ROW) clearing.

Tuba: Parts of Poblacion TB (Badiwan and adjacent areas)

Buguias: Amgaleygey, Central Buguias and Amlimay

EST. NO. OF CONS. AFFECTED

118,008

Scheduled Power Interruption: March 19-23, 2018.pdf

2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La Trinidad (Except the following areas Lamut, Marlboro.

154KB Sizes 12 Downloads 243 Views

Recommend Documents

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Feb. 13, 1923.
energy on radio-electro-sensitive'means, and causing ... sources of electric energy,'for example, a. , and the .... "lIlg an alternative repeating arrangement,. 115.

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N