BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City

NOTICE OF SCHEDULE POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time: DATE

Jan 22 Mon

Jan 23 Tue

Jan 24 Wed

TIME

9AM to 5PM

9AM to 5PM

9AM to 5PM

FEEDER

EQUIP'T REF. OF DE-ENERGIZED AREA

FEEDER 13

DZWT SECTIONALIZER

FEEDER 10

PURPOSE

EST. NO. OF CONS. AFFECTED

La Trinidad: Whole of Lamut, RPN-9 Ambiong LT and parts Guitley Lubas

-Improvement of Primary Line Clearance -Right of Way Clearing

65

LT01335 Trans Cut-out

La Trinidad: Parts of Puguis

Replacement of Rotten of Secondary Poles

38

FEEDER 9

LT01001 Trans Cut-out

La Trinidad: Lower Kesbeng - Poblacion LT

Replacement of Rotten of Secondary Pole

15

FEEDER 3

B010908 Trans Cut-out

Tuba: Nangalisan (near Hydro/Plant 3)

Extension of Primary Line

22

FEEDER 11

IT00476 Trans Cut-out

Itogon: Sitio Baayan - Ucab

Secondary Line Reconductoring

31

FEEDER 3

TB01498 SECTIONALIZER

Tuba: parts of Nangalisan (near Nangalisan Elementary School)

Extension of Primary Line

35

FEEDER 10

B029444 SECTIONALIZER

La Trinidad: Parts of Wangal, Buyagan (near Coffee Trading Center)

Relocation of Pole

43

FEEDER 9

B0029923 Trans Cut-out

Tublay: Sitio Kilo, Caponga

Rehabilitation of Secondary Line

22

FEEDER 4

TALINGGUROY SECTIONALIZER

La Trinidad: Talingguroy, Puguis

Conversion from 1-phase to 3-phase Primary Line

78

FEEDER 7

BC00766 Trans Cut-out

Baguio City: Parts of Dominican-Mirador

Correction of Secondary Line Clearance

67

FEEDER 11

BC00977 Trans Cut-out

Baguio City: Purok 4, East Gibraltar

Correction of Secondary Line Clearance

41

B029536 Trans Cut-out

La Trinidad: Central Ambiong

Replacement of Rotten Secondary Poles

31

- Relocation of Primary Poles Affected by Road Widening -Right-of-Way Clearing

109

Jan 25 Thu

9AM to 5PM

FEEDER 5

Jan 27 Sat

9AM to 5PM

CIRCUIT 4

NOTES:

AREAS AFFECTED

TANEG RECLOSER Mankayan: Taneg – Suyoc

1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607/09088657202/09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

Scheduled Power Interruption: Jan. 22-27, 2018.pdf

Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

43KB Sizes 2 Downloads 216 Views

Recommend Documents

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N