BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City

NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

DATE TIME FEEDER

Feb 19 Mon

Feb 20 Tue

9AM to 5PM

9AM to 5PM

Feb 22 Thu

9AM to 5PM

9AM to 5PM

Feb 23 Fri

NOTES:

Baguio City: Quirino Hill, Dizon Subdivision, Upper and Lower Pinget La Trinidad: Parts of Pico (Dreamland Subdivision area)

PURPOSE

Feeder 05

B000007 Sectionalizer

Baguio City: Parts of North Sanitary Camp (Purok 6 - Relocation of primary pole and adjacent areas) - Right of Way (ROW) clearing

125

Feeder 05

B003990 Sectionalizer

Baguio City: Parts of North Sanitary Camp (Shenet - Relocation of primary pole and adjacent areas) - Right of Way (ROW) clearing

202

Feeder 09

B025764 Trans Cut-out

La Trinidad: Shilan (Shontog)

- Rehabilitation of secondary line - Right of Way (ROW) clearing

Feeder 11

IT01952 Trans Cut-out

Itogon: Parts of Tuding (Lower Sitio Mangga)

- Extension of secondary line - Right of Way (ROW) clearing

Feeder 05

B026050 Sectionalizer Serving Ambiong

Baguio City: Ambiong BC, Paltingan to Ambiong Road La Trinidad: Ambion LT, Gulon to LTWD Pumping Station, San Marco Subdivision, SLU Subdivision, PAG-IBIG Subdivision, Parts of Balili LT (Mamaga Km. 3)

- Relocation of 2 primary poles due to road widening - Replacement of secondary pole - Right-of-Way (ROW) clearing

1994

Feeder 13

TB02363 Trans Cut-out

Tuba: Parts of Camp 3 (Antamok)

- Installation of intermediate secondary pole - Right of Way (ROW) clearing

29

- Relocation of 2 primary poles due to road widening - Retirement of poles - Tree cutting - Right-of-Way (ROW) clearing

2403

Baguio City: Naguillian Rd. (from St. Vincent towards Cooyesan), San Roque Village, Lourdes B007591/B028410 Subdivision, Lower Lourdes Subdivision (Hamada LBS/DS Rd. and adjacent areas), Dominican-Mirador, Parts Near St. Vincent of San Luis Village (Shangrila Village and adjacent areas)

- Retirement of CCTV antenna - Right of Way (ROW) clearing

EST. NO. OF CONS. AFFECTED

BC05413 Recloser Dizon

3996

157 35

Feeder 03

TB01500 Trans Cut-out

Tuba: Parts of Nangalisan (near Nangalisan Elementary School)

- Reconductoring of secondary lines - Right-of-Way (ROW) clearing

54

Feeder 11

B024281 Trans Cut-out

Itogon: Parts of Tuding (Abeo Duclos)

- Extension of primary line - Installation of continuous neutral

25

Feeder 08

BC03445 Trans Cut-out

- Installation of intermediate secondary pole Baguio City: Parts of Sto. Tomas Proper (Balacbac) - Reconductoring of secondary lines - Right of Way (ROW) clearing

Dalicno

B035879 Trans Cut-out

Baguio City: Parts of Kias (Purok 7)

Feeder 10

9AM to 5PM

AREAS AFFECTED

Feeder 07

Feeder 07

Feb 21 Wed

EQUIP'T REF. OF DE-ENERGIZED AREA

B029265/B029273 B029273 La Trinidad: Parts of Pico (Toyong St., Laoyan St. DT/DT Pico Road) and Parts of Betag (adjacent Pico) Hot Line Clamp

147

- Correction of secondary line clearances - Right-of-Way (ROW) clearing

213

- Upgrading of communal Transformer - Upgrading of secondary lines - Retirement of primary line & Transformer

172

Dalicno

IT02951 Trans Cut-out

Itogon: Parts of Ampucao (Lower Dalicno near NGCP-Itogon Substation)

- Reconductoring of secondary lines - Right-of-Way (ROW) clearing

48

Feeder 10

LT04201 Sectionalizer

La Trinidad: Balili LT (Pines Park, Lubas, Guitley, Km. 4, BSU), Parts of Tawang

- Correction of Primary line clearance - Right-of-Way (ROW) clearing

1265

Feeder 03

BC08553 Trans Cut-out

Baguio City: Parts of Irisan (Purok 16)

- Correction of leaning secondary pole - Reconductoring of secondary lines - Right-of-Way (ROW) clearing

112

Feeder 13

BC01262 Trans Cut-out

Baguio City: Parts of Lualhati Village (along Villamor - Extension of 3-phase line St) - Installation of sole use 3-75 kVA DTs

1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

36

Scheduled Power Interruption: Feb. 19-23, 2018.pdf

Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary poles due to road. widening. - Replacement of secondary pole.

113KB Sizes 4 Downloads 227 Views

Recommend Documents

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 9-14, 2018.pdf
4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

Feb. 13, 1923.
energy on radio-electro-sensitive'means, and causing ... sources of electric energy,'for example, a. , and the .... "lIlg an alternative repeating arrangement,. 115.

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...