REQUEST FOR QUALIFICATIONS Executive Architect, Morgan Hall Elevator – DSA Upgrade The Berkeley Campus of the University of California requests that interested firms submit written proposals to provide design services for the following proposed project: Morgan Hall Elevator – DSA Upgrade Project No. 17288A Estimated Construction Cost: $1,000,000 The proposed elevator extension project is located in Morgan Hall situated in western part of the central Berkeley campus. The project will provide new elevator machine room, new 1-hr rated corridor to connect the two existing staircases together (staircase within the fourth floor structure to the staircase adjacent to the elevator) and extend the existing elevator from the 3rd floor to the 4th floor (roof). The attached sketch documents the design approach approved by Fire Marshal. SCOPE OF SERVICES • Bid Documents for Informal and Formal bid process •

Work with University stake holder team including General Assignment Classroom Manger and Interior Design Consultant to assess program requirements, existing conditions, access issues, etc.



Full design services, through Construction Administration, including all sub-consultants.



Cost studies at relevant phases of design.



Provide a phasing plan/strategy to complete all improvements.

PROPOSAL CONTENT Proposal must not exceed 10 pages (excludes the Berkeley Consultant Experience Form) and shall provide sufficient information to allow the University to evaluate the Consultant’s approach, experience, staff and availability. Proposals shall include the following information: •

Discussion of Consultant’s approach to projects



Description of completed elevator projects, including a client contact and phone number for at least (3) projects ranging from $500K to $1M in construction value.



Resumes of staff to be assigned to the projects and a statement regarding availability of staff to begin the projects. The respondent must submit three (3) copies of the proposal, each signed by an authorized representative of the Consultant. Proposal must be submitted to arrive no later than 2:00 p.m. on July 25, 2017 to: Contracts Administration University of California, Berkeley 1936 University Avenue, 2nd Floor Berkeley, CA 94704 Email: [email protected]

SELECTION PROCESS The University will review all proposals then select and rank the three most qualified Consultants. The selection and ranking shall be based on the criteria listed below. The order in which the criterial appear does not indicate the importance, ranking or weighing that will be used in the evaluation. 1. Proposed approach to the project 2. Past experience of the firm in performing similar projects. 3. Experience of staff to perform the services required by the Projects.

The University shall negotiate with the highest ranked Consultant of tasks, staffing, schedule and a maximum notto exceed fee. Negotiations may be formally terminated if they fail to result in a contract within a reasonable amount of time. Negotiations will then ensue with the second ranked Consultant, and if necessary, the third ranked Consultant. For services prior to the beginning of Schematic Design the successful firm will be required to sign the University’s Professional Services Agreement which is posted for review at http://www.cp.berkeley.edu/CP/ContractAdmin/SampleDocs/Agreements/PSA.pdf. The successful firm will be required to sign the Executive Design Professional Agreement, Version B, posted for review at http://www.cp.berkeley.edu/ContractsAgreemnts.html#agreementsThe successful firm will be required to sign the University’s Professional Services Agreement, which is posted for review at The University of California is an Equal Opportunity Employer – Minorities and women are encouraged to apply. Every effort will be made to ensure that all persons regardless of race, religion, sex, color and national origin have equal access to contracts and other business opportunities with the University. Each candidate firm will be required to show evidence of its equal employment opportunity policy. University of California, Berkeley Consultant Experience Form Disclose all work performed on any University project in the previous five years including current projects and whether or not any disputes, claims or litigation arose from such work on the Consultant Experience Form. The Office of the President and/or the project manager of the project on which such claims or litigation arose will be contacted to discuss the underlying facts and circumstances.

UNIVERSITY OF CALIFORNIA, BERKELEY SUMMARY STATEMENT OF QUALIFICATIONS Morgan Hall Elevator PROJECT NUMBER 17288A Company Information Firm Name Primary (Street) Address Firm Established (Year) Type of Organization: (check one)

Phone Corporation Limited Partnership

Email

Limited Liability Company Individual/Sole Proprietorship

General Partnership

If Corporation, incorporated in the State of Principal (P) and Associates (A): Check “P” or “A” for each Name

P

Degree or Certificate

A

Issuing Institution

Relevant Project Experience Project No. 1 Summary Description:

Delivery Method:

Building Size (sq. ft.):

Proposed Budget:

Client/Stakeholder:

$

Email/Contact:

Note: Indicate your firm’s role in project No 1. Identify team members who worked on Project No. 1 that are also proposed to work on this project. Check attributes that apply for Project No. 1: Was project built?

Yes

No

Similar project elements to proposed project?

Yes

Did the project involve renovation of an occupied building?

No Yes

No

Project No. 2 Summary Description:

Delivery Method:

Building Size (sq. ft.):

Proposed Budget:

Client/Stakeholder:

$

Email/Contact:

Note: Indicate your firm’s role in project No. 2. Identify team members who worked on Project No. 2 that are also proposed to work on this project. Check attributes that apply for Project No. 2: Was project built?

Yes

No

Similar project elements to proposed project?

Yes

No

Did the project involve renovation of an occupied building?

Yes

No

Project No. 3 Summary Description:

Delivery Method:

Building Size (sq. ft.):

Proposed Budget:

Client/Stakeholder:

$

Email/Contact:

Note: Indicate your firm’s role in project No. 3. Identify team members who worked on Project No. 3 that are also proposed to work on this project. Check attributes that apply for Project No. 3: Was project built?

Yes

No

Similar project elements to proposed project?

Yes

Did the project involve renovation of an occupied building?

No Yes

No

References (3 minimum) Name

Client Company or Agency

Phone

1. 2. 3.

(Completed By)

(Date)

Note: Please attach this form to the other information identified in the section titled “Qualification content”. The forms will supplement the seven (7) page maximum Submittal.

Privacy Information The State of California Information Practices Act of 1977 requires the University to provide the following information to individuals who are asked to supply information about themselves: The principal purpose for requesting the information on this form is for use in the selection process for Professionals commissioned by the University. University Policy authorizes maintenance of this information. Furnishing all information requested on this form is mandatory - failure to provide such information will delay or may even prevent completion of the action for which the forms is being filled out. Information furnished on this form will be used by the University of California Berkeley campus in the consideration of commissions to Professionals. Individuals have the right to access to this record as it pertains to themselves. The official responsible for maintaining the information contained on this form is the Assistant Vice Chancellor & Campus Architect, Design and Construction Management, University of California, Berkeley, California.

University of California, Berkeley Consultant Experience Form Project: Morgan Hall Elevator (17288A)

Note which is Prime Consultant

Active UC Projects Campus/Project Consultant/Firm Name

(list all for each firm)

All UC Projects within Last 5 Years Campus/Project (list all for each firm)

Claims* or Litigation? (Yes** or No)

(include information for all specialties and consultants on proposed design team)

Claims* or Litigation? (Yes** or No)

Specialty

All Other Projects with Any Claims* Active and Past 5 Years (list all for each firm)

Architectural(Prime)

Other Consultants (list all)

The information provided on this experience form was prepared by my office of the prime consultant listed above, who verifies under penalty of perjury that all information set forth on this form, to the best of my knowledge, is complete and accurate as of the date of submission of the Statement of Qualifications.

(Signature)

(Name)

(Title)

(Date)

Attach additional pages if necessary for any category *Claims shall include all claims including all pending, unresolved claims of professional negligence or breach of contract for professional services against your firm or any owner or principal of your firm. **If yes, explain:

RFQ for Morgan Hall Elevator Upgrade_17288A.pdf

Page 1 of 5. REQUEST FOR QUALIFICATIONS. Executive Architect, Morgan Hall Elevator – DSA Upgrade. The Berkeley Campus of the University of California ...

52KB Sizes 1 Downloads 173 Views

Recommend Documents

RFQ Invitation.pdf
Page 1 of 2. Invitation. City of Turner, Oregon. Request for Qualifications. CLOSING DATE:January 16, 2018. CLOSING TIME: 4:00P.M. (Pacific Time). To Provide: CONSULTANT SERVICES FOR DATA COLLECTION AND MODELING. DEVELOPMENT FOR THE MILL CREEK DRAINA

RFQ for Geotechnical Engineering Services_12629A.pdf
Page 3 of 5. RFQ for Geotechnical Engineering Services_12629A.pdf. RFQ for Geotechnical Engineering Services_12629A.pdf. Open. Extract. Open with.

RFQ - Economic and Housing Development - Request for ...
Page 1 of 9. City of Newark EHD - RFQ for Contractors/Developers. 1 of 9. Department of Economic and Housing Development. Division of Property Management. 920 Broad Street, Room 421. Newark, New Jersey 07102. REQUEST FOR QUALIFICATIONS (RFQ). For Co

request for qualifications (rfq) - City of Mobile
May 11, 2015 - 1. Environmental Review and Analysis. 2. Development of Design Scopes of Work Support. 3. Architect/Engineer Selection Support ...

request for qualifications (rfq) - City of Mobile
May 11, 2015 - a 3 Year Capital Budget for the City's public facilities, including roads, ..... subconsultants' key personnel who would perform work for on-call program ... Management Ordinance, Building Codes, Right of Way Ordinance and.

UC Berkeley – Tolman Hall RFQ-RFP process-brm 21715.pdf ...
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. UC Berkeley – Tolman Hall RFQ-RFP process-brm

Morgan-Rego
the products and services of more than 200 Fortune. 500 companies (in ... sumer evaluations of their product/service consump- ... Complaints (proportion). 0190.

RFQ for Architects SVUSD 09-2016.pdf
Page 1 of 7. Request for Qualifications – Architectural Services. - 1 -. Sonoma Valley Unified School District. 17850 Railroad Ave. Sonoma, CA 95476. October ...

The Elevator Problem.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. The Elevator ...

Elevator Reports Dahlgren.pdf
Sign in. Page. 1. /. 10. Loading… Page 1 of 10. Page 1 of 10. Page 2 of 10. Page 2 of 10. Page 3 of 10. Page 3 of 10. Elevator Reports Dahlgren.pdf. Elevator ...

elevator problems worksheet
Elevator Problems. 1. A 15-kg dog ... (a) The elevator is at rest. (b) The elevator .... Galleries from. [08.04.2016 01:47] Manual:....e-1mg-cheap.pdf#volume">buy.

Elevator gallows 1080p
Game over pdf. ... Php for delphi.1080p officer ... Should AmericainvadeIraq, then the government placed in control ofIraq could ... Astronomy 2015 pdf.933288648. ... out thee-total ofanyE on a 10 x 9 grid We have nowfound out that which.

RFQ for VLSB Chiller Replacement 12901A.pdf
Whoops! There was a problem loading this page. RFQ for VLSB Chiller Replacement 12901A.pdf. RFQ for VLSB Chiller Replacement 12901A.pdf. Open. Extract.

elevator 2011 brrip.pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Retrying... elevator 2011 brrip.pdf. elevator 2011 brrip.pdf. Open. Extract. Open with.

RFQ: Server High Availability Project.pdf
RFQ: Server High Availability Project.pdf. RFQ: Server High Availability Project.pdf. Open. Extract. Open with. Sign In. Main menu.

RFQ Courthouse Construction Management.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Q17-004 RFQ Packet.pdf
Page 1 of 31. Request for Qualifications. Q17-004. Consulting Services for. IT Infrastructure Standards and Specifications. Date Event. June 28, 2016 ...

Historic Registry Magnolia Mills Innes Elevator Warrensburg ...
Page 1 of 46. (Oc? 1990) 10~ 9°° °MB N. United States Department of the Interior. National Park Service. National Register of Historic Places. Registration Form.

RFQ Cal Perf MP final.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. RFQ Cal Perf ...

RFQ TDPS MP .pdf
University of California, Berkeley Page 1 of 7. Theater ... In 2012, Backstage Magazine ranked UC Berkeley as one of the top five dance .... RFQ TDPS MP .pdf.

2.) RFQ-SEQUEST 1st Qrtr.pdf
Note: Amount stated is for posting requirement only, please give us your best price quotation. Item. No. Quantity Unit Price Total Price. 1 18 Universal Drinking Water Treatment Additive. Chemical Family: Blend of Inorganic Phosphate. Quantity: 25kg/

12690A_Morgan Hall Lab Casework & Equipment_AD FOR BID.pdf ...
... is a public work as that term is defined in section 1771 of the California Labor ... unless registered with the Department of Industrial Relations pursuant to ...