Ref. Ares(2016)6904326 - 12/12/2016

European Commission Directorate-General Communications Networks, Content and Technology Directorate H Digital Society, Trust, and Cyber Security Unit H3 : E-health, Well -being and Ageing

Brussels, 26 of November, 2016 Dr. Apuzzo Gian Matteo (Project Coordinator Smartcare) AZIENDA PER L' ASSISTENZA SANITARIAN 1 TRIESTINA Via Sai, 1-3 Trieste 34128 (ITALY) [email protected]

Subject:

Result of the final review of your CIP/ICT-PSP project N°325158 SMARTCARE

Dear Mr Apuzzo, Following the final review of your project held in Brussels on 25 October 2016 and based on the attached Review report of the experts, the Commission considers: ƒ

The project the progress of the project, as completed, as acceptable. All the deliverables submitted for this Final Review have been accepted and the project is considered as successfully complete.

ƒ

The project should however take the following recommendations into account:

Recommendation 1/ Even if there is no financing from the EC to support the further development of activities after the project termination, it is strongly recommended to proceed with the follow-up steps, not only in the sense of maintaining the services already developed but to work hard on the support of local and regional stakeholders. Recommendation 2/ The data gained during the process with regards to the delay in deployment and in recruiting patients haven´t been fully explored. Thus it is recommended to continue exploring available and new data, which could be easily done using the research capacities of PhD students in Recommendation in relevant branches – not neglecting the economic aspects of the data-set to be evaluated. This database should serve as an open source of information to be exploited in the future by anyone interested in some research. Moreover, this database will be hopefully extended by new data coming from the two other synergy projects. Synergies with more recent but very related ECfunded projects such as CareWell and Beyond Silos should also be fostered to this aim.

Likewise this data base is expected to support the utilisation of MAFEIP tool (for description of technicalities, please refer to the article of the BMC/ link below)1, a specific IT tool specifically developed by the EC Joint Research Centre-IPTS 2, in line with the EC services recommendations on that matter and EIP-AHA policy orientations. For further information on MAFEIP utilization, please contact Mr Francisco LupiáñezVillanueva3 from Open Evidence our consortium lead in charge of MAFEIP support. Recommendation 3/ In order to foster the uptake of Integrated Care in other regions, the Deployment guides are a useful tool but may include some concrete results or lessons learned, both a multi-scale and local scale level, both regarding benefits and constraints, and both at patient and at service organisation level. Moreover, the EC Commission would like also to be informed (copies of documents or related links) of all current and future commitments from new adopting regions or countries, especially letters/documents signed off by the representatives or authorities and/or legal / regulatory documents related to the adoption of Smart Care. Lastly, and owing to the importance of Change Management for other EU level projects, the EU Commission would like to be informed of the further work regarding the final design of the Change Management Tool Box (see remark in the Annex 1 / Remark on deliverable D.7.6. ). EC services expect your feedback on the recommendations mentioned above by 31 December 2016. The Commission approval of deliverables is set out in the enclosed Annex 1. Please note that the assessment of the use of the resources made by the experts in point 3 of the report does not imply the acceptance of the corresponding costs by the Commission. The eligibility of the costs claimed will be assessed by the Commission on the basis of the financial statements submitted by each beneficiary. You will be soon informed about the amount of the final payment of the financial contribution of the European Union according to Article II.5.8 of the grant agreement. All costs declared by a beneficiary can be subject to a financial audit pursuant to Article II.28 of the grant agreement. According to Article II.29.5 of the grant agreement, you may make observations on the result of the review of your project within one month of reception of this letter. Yours sincerely,

Miguel GONZALEZ-SANCHO Head of Unit Enclosure: Annex 1: Commission approval of deliverables Annex 2: Review report 1

http://bmcmedinformdecismak.biomedcentral.com/articles/10.1186/1472-6947-15-S3-S4

2

http://is.jrc.ec.europa.eu/pages/TFS/MAFEIP.html

3

[email protected] Phone: +34 934505339 – Mobile +34 696213679 22@ Rambla Poblenou, 156 08018 Barcelona SPAIN - www.open-evidence.com 2

Annex 1 Commission approval of deliverables

STATUS OF DELIVERABLES – Y4 No. D6.2 D7.1 D7.2 D7.3 D7.4 D7.5 D7.6 D7.7 D7.8 D7.9 D8.4 D8.5 D9.3 D9.4 D9.4 A D9.4 B D9.4C + Annexes D9.4 D D10.8 + Annexes D10.9

* Status:

Title

Status

Report on Operation of Deployment sites Approved MAST 1.0 Validation Workshop Approved Report on the predictive model application Approved to the first deployment site MAST 2.0 Validation Workshop Approved Report on the collaboration with Approved BeyondSilos and CareWell Report on the collaboration with the EIP Approved AHA 83 Action Group Change Management Tool Box Approved Report on the predictive model application Approved to the second deployment site MAST 2.0 manuals Approved Cross-projects data comparison Approved SmartCare Pilot outcomes Approved Report on Users' Advisory Board visits Approved to the deployment sites Guidelines for deployment Approved Deployment plans for SmartCare Approved Pathways and Integration Infrastructure SmartCare Final report on dissemination Approved activities SmartCare Final report on exploitation Approved activities and deployment plans SmartCare Report on Advisory Board Approved activities SmartCare Final Conference Approved Project final report incl. PR for RP3 and Approved report on the distribution of the financial contribution Project final report

Remarks

Version 1,0 submitted on October 15, 2016 remarks made for SmartCare should be integrated in these projects as well

A generic framework has been designed but it requires more validation work

no impact evaluation of the service included

2nd version issued on 14th October 2016 Good detail has been provided in response to the 3rd year review recommendations

Approved

Approved Approved in part Approved subject to the conditions listed under remarks Rejected

3

Annex 2 Review report

4 Electronically signed on 09/12/2016 16:46 (UTC+01) in accordance with article 4.2 (Validity of electronic documents) of Commission Decision 2004/563

Result of the final review of your CIP/ICT-PSP project ... -

Dec 12, 2016 - open source of information to be exploited in the future by anyone ... All costs declared by a beneficiary can be subject to a financial audit ...

51KB Sizes 3 Downloads 186 Views

Recommend Documents

Result Review: SIRI
Aug 16, 2016 - ตลาด SET ที่ 2.0 เท่า เราคาดว่า SIRI จะให้อัตราเงินปันผลตอบแทนสูงถึง 6.7% ..... PTT. PTTEP PTTGC QTC. RATCH ROBINS SAMART. SAMTEL SAT

Result Review -
Downloaded by in-adfactor from 203.115.115.2 at 2011-07-25 01:03:14 EDT. ..... Canada, or Japan or distributed, directly or indirectly, in the United States or ...

result review -
YoY, +1.4% QoQ), led by a surge in regasification volumes to 92tbtu (~1.7mmt,. +22% YoY). Long-term contract volumes were at 125tbtu (+16.3% YoY, -6.7%.

IISER-ADMISSION-SEAT-ALLOTMENT-RESULT-FINAL-ROUND ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu.

PG FINAL RESULT 2012.pdf
Page 1 of 5. 1. ST. JOHN'S NATIONAL ACADEMY OF HEALTH SCIENCES. BANGALORE 560 034. ST. JOHN'S MEDICAL COLLEGE. POST GRADUATE ADMISSION 2012-2013. The following candidates have been provisionally selected to the Post Graduate Courses beginning. 16th A

Final Result -Entry 2018.pdf
22 382 Khai Rullah Nouman. 23 404 Muhammad Naseer Pehlwan Ali Jamali. 24 416 Ahmed Haseeb Tariq Javed. 25 431 Maaz Butt Mujahid Islam Butt. 26 432 Zakir Hussain Abdul Ghafoor (Late). 27 541 Noman Ullah Khan Mohib Ullah Khan. 28 551 Safdar Hassain Muh

final project requirements - GitHub
In the course of the project, we expect you to complete the following tasks: 1) Gather ... The presentations should target a non-technical audience and serve the ...

Final Year Project Report “Online Measurement of ... - Semantic Scholar
Mar 24, 2006 - The website was implemented using PHP, CSS, and XHTML, which is a ... to be embedded in HTML, and it is possible to switch between PHP ...

Final Year Project Report “Online Measurement of ... - Semantic Scholar
Mar 24, 2006 - theory of quantum entanglement. This report summarises the development of a website that provides a fast and simple way of calculating ...

Final list of BE Project Groups.pdf
41 Security structure for Cloud. computing. 4502 Nrupen Abnave. 4505 Akshat Goal. 4549 Niki Parmar. Page 3 of 4. Final list of BE Project Groups.pdf. Final list ...

Does Relational Aggression Result in Physical ... - The Ophelia Project
stomachaches, fatigue, trouble sleeping, loss of appetite and unexplained crying. The reporting of these different physical symptoms varied based on gender and the participants' status as target or aggressor. Targets. As targets of relational aggress

COWRIE FINAL PROJECT IMPLEMENTATION REPORT_WebReport ...
Retrying... COWRIE FINAL PROJECT IMPLEMENTATION REPORT_WebReport.pdf. COWRIE FINAL PROJECT IMPLEMENTATION REPORT_WebReport.pdf.

Alcohol Final Project
hope that you have learned at least something new from this paper because I do believe I am an expert on alcohol and its effects along with many statistics.

DECLARATION OF RESULT OF POLL Election of ... - Cotswold Lakes
May 5, 2011 - Water Park ... BENNETT, Clive Edward ... And I do hereby declare that, Clive Edward Bennett, Esmond Geoffrey John Jenkins, Juliet Mary ...

final year project
School of Computing Sciences. FINAL YEAR PROJECT. Simulating Human Behaviour in a Zoo Environment. Emma Cotgrove. Year 2005/2006. Supervisor: Prof AR Forrest .... For collision avoidance to work to its full potential; a certain amount of artificial i

final year project
behind the project is to develop an autonomous vehicle which will be ...... Precision Target Tracking – To track and follow a moving object through area or a terrain. ...... Systems that control the navigation of a mobile robot are based on several

Project Final Report
Dec 27, 2007 - It is a good idea to divide a FIR into two parts and implement its multipliers with hardware ..... http://www.mathworks.com/access/helpdesk/help/pdf_doc/hdlfilter/hdlfilter.pdf ...... feel free to send your comments and questions to ..

Project Final Report
Dec 27, 2007 - Appendix F. A Tutorial of Using the Read-Only Zip File. System of ALTERA in NIOS II ..... Tutorial of how to use the flash device and build a read-only file system in NIOS II. IDE is in the ...... Local Functions. -- Type Definitions.

Syndicate Bank 500 PO Final Result [email protected] ...
55 1241003979 MONICA GAMIDI M/s MaGE, Bengaluru. 56 1241005038 DASARI PAMULU M/s MaGE, Bengaluru. 57 1241005064 POLISETTI NAGESWARA ...

Player Result-CIMB NJC-Final Leg.pdf
Player Result-CIMB NJC-Final Leg.pdf. Player Result-CIMB NJC-Final Leg.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Player Result-CIMB ...

2013 Laskeys Cycles Final result (1).pdf
Page 1 of 4. Pos. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. No. 117. 28. 30. 128. 180. 189. 185. 111. 110. 198. 120. 122. 38. 125. 112. 159. 160. 131. 157. 24. 129.