ASX Release 24 July 2015 QUARTERLY ACTIVITIES REPORT For the quarter ended 30 June 2015 Highlights: Mt Marion Lithium Project  Subsequent to the end of the quarter a binding conditional MoU was signed with Jianxgi Ganfeng Lithium Co., Ltd, China’s second largest lithium producer for life of mine offtake and equity acquisition which at completion will trigger final investment decision to construct lithium concentrate operation.  At completion Neometals will receive US$19.5M and dilute from 70% to 45% of RIM.  Transaction excludes downstream lithium processing intellectual property held in JV with Mineral Resources Ltd. Barrambie Titanium Project  Pre-feasibility Study continuing with estimated completion in August 2015 Corporate  Evaluating divestment of nickel portfolio  Cash and restricted access term deposits $7.5 million

PROJECT LOCATIONS

MT MARION LITHIUM PROJECT (Neometals 70%, Mineral Resources Limited 30%) During the quarter, Reed Industrial Minerals Pty Ltd (RIM) continued to advance the Mt Marion Lithium Project (Mt Marion). RIM is owned 70:30 by Neometals Ltd (Neometals) and leading mining services provider Mineral Resources Limited (MRL). MRL fund and operate the project through their subsidiary, Process Minerals International Pty Ltd. Mt Marion is a globally significant lithium deposit, containing total Measured, Indicated and Inferred Mineral Resources of 14.8Mt at 1.3% Li2O and 1.2% Fe2O3, at a cut-off grade of 0.3% Li2O (Appendix B). The project has a granted Mining Proposal and received its Works Approval for plant construction, on the 18th of December 2014. Project Development and Corporate Strategy During the quarter RIM progressed completion of the transaction with Metals X Ltd (ASX: MLX) which was announced to the ASX on 22 January 2015. Under the agreement, RIM has agreed to lease the lithium mining rights over a portion of the Hampton Area Location 53, which adjoins the Mt Marion Lithium Project, and to purchase an adjoining mining lease and associated infrastructure from Metals X (Figure 1). Completion was announced on the 7 July 2015. Subsequent to the end of the quarter the Company has entered into a binding conditional Memorandum of Understanding (“MoU”) with China’s second largest lithium producer Jiangxi Ganfeng Lithium Co., Ltd (“Ganfeng”). The MOU sets out the key commercial terms for: •

Ganfeng to acquire an up-front 25% shareholding in RIM by way of share sale and equity subscription leaving Neometals with 45% of RIM and MIN with 30% of RIM. Neometals will net approximately US$19.5 million from this initial transaction;



PMI and Ganfeng to be granted options by Neometals pursuant to which they can elect to increase their respective shareholdings in RIM to 43.1% by around Q4 of 2016 by way of share purchase from Neometals. If these options are fully exercised, Neometals will be left holding 13.8% of RIM;



MIN building, owning and operating the Mount Marion mining, crushing and beneficiation infrastructure and equipment pursuant to a fixed price mining services contract;



Ganfeng entering into a long-term offtake for 100% of the spodumene produced from the Mt Marion Lithium Project at benchmarked market prices subject to an agreed price floor. Under the agreement, from year 4 onwards RIM reserves the right to take 51% of the total production if greater commercial benefit can be derived from such product; and



prudential corporate governance arrangements for RIM between Ganfeng and RIM’s existing shareholders with equal board representation for all shareholders.

Financial close will trigger a Final Investment Decision for the Mt Marion lithium concentrate operation and commencement of full plant construction and assemblage as all necessary approvals for the project have been secured by RIM. MIN is already well advanced with development planning and procurement, with commissioning and production of lithium concentrate product anticipated by mid-2016.

2

Figure 1. Geology over existing RIM tenure (red) with new lithium rights lease area (blue) and tenements acquired (green).

Downstream Lithium Processing All downstream lithium processing technology and patents are being transferred to a dedicated vehicle, Reed Advanced Materials Pty Ltd (“RAM”) and are not part of the sale assets in the Ganfeng MoU. RAM is beneficially owned 70:30 by the Company and MRL. A partner selection process continues with the aim of developing an appropriate business structure for the commercialisation of RAM’s downstream processing technology. Discussions remain preliminary and there can be no assurance that a binding proposal will emerge. Neometals and MRL will keep the market informed as matters develop further. During the quarter RAM continued the prosecution of new patent applications to cover improvements in its proprietary process to produce high-purity lithium hydroxide (“LiOH”) directly from spodumene (lithium) concentrates. RAM owns a granted Australian patent within its extensive patent family for lithium hydroxide, with other patents filed or under examination in the US, Argentina, Canada, Chile, China, Japan, Malaysia and South Korea. Lithium market Prominent and respected lithium industry researchers continue to forecast a large and sustained increase in the demand for high-purity, battery-grade lithium hydroxide and carbonate at compound rates of approximately 20% pa. The growth is underpinned by continuing use of rechargeable batteries in consumer electronics and increased market penetration of battery electric and hybrid electric vehicles (EV and HEV) in commercial and private applications.

3

The current median prices for battery-grade lithium hydroxide and lithium carbonate are US$8,250 and US$6,400 per tonne, respectively, on a CIF basis to Europe and US respectively (source: Industrial Minerals 16 July 2015). The price of chemical grade lithium concentrates (6% Li2O) are illustrated in Figure 2 below and gleaned from Official Chinese Import Volumes and Prices and independent marketing consultants, conversion to Australian currency is done at simple arithmetic average of daily rates reported by the Reserve Bank of Australia.

Figure 2. Chinese SC6 Grade Spodumene Prices

BARRAMBIE TITANIUM PROJECT (Neometals 100%) During the quarter the Company continued to advance its Barrambie Titanium Project with the further optimisation of its mini-pilot plant testwork programme in Canada. The Company continued its Pre-feasibility study (“PFS”) to assess the development of an open-pit mining and processing operation using a licensed proprietary technology to produce high purity titanium, vanadium and iron compounds. The PFS is being managed by Mr Michael Spratt, an experienced process/construction engineer and former COO of Minproc, and is expected to be completed in August 2015. Barrambie is one of the world’s highest grade titanium deposits, containing total Indicated and Inferred Mineral Resources of 47.2Mt at 22.2% TiO2, 0.63% V2O5 and 46.7% Fe2O3, at a cut-off grade of 15% TiO2 (Appendix B). 4

The currently preferred development strategy is to demonstrate the technical feasibility and economic viability of the project to attract a joint venture partner to fund and operate the development of the Barrambie project. Titanium and Vanadium market The majority of titanium feedstocks (US$17 Billion or 85% by value) are used to produce titanium dioxide pigment which is then used as an additive in paints, plastics, paper and ink with the balance (15%) used to produce titanium metal products. The current median price for high quality titanium dioxide pigment is US$2,900 per tonne on a CIF basis to USA (source: Industrial Minerals 16 July 2015).

LAKE JOHNSTON NICKEL PROJECT (Neometals 80%, Hannans Reward 20% free carried to DTM) No activity undertaken in the quarter.

MT FINNERTY PROJECT Green Dam Prospect (Barranco 100%, Neometals option to acquire 100%) No activity undertaken in the quarter.

NON-CORE ASSET DIVESTMENT PROGRAM With Neometals focus being on the Mt Marion Lithium and Barrambie Titanium Projects, the Company has committed to divesting non-core assets from its portfolio. In line with this strategy The Company is evaluating options to divest its nickel portfolio.

CORPORATE Finances (unaudited) Cash and term deposits on hand as of 30 June 2015 totalled $7.5 million, including $6.1 million in restricted use term deposits supporting performance bonds and other contractual obligations. Issued Capital The total number of shares on issue at 30 June 2015 was 502,212,757. ENDS 5

APPENDIX A: TENEMENT INTERESTS As at 30 June 2015 the Company has an interest in the following projects and tenements in Western Australia. PROJECT NAME

LICENCE NAME

BENEFICIAL INTEREST

STATUS

Barrambie

E57/769

100%

Live

Barrambie

E57/770

100%

Live

Barrambie

E58/471

100%

Pending

Barrambie

L57/30

100%

Live

Barrambie

L20/55

100%

Live

Barrambie

M57/173

100%

Live

Mount Marion

E15/1190

70% (*)

Live

Mount Marion

L15/315

70% (*)

Live

Mount Marion

L15/316

70% (*)

Live

Mount Marion

L15/317

70% (*)

Live

Mount Marion

L15/321

70% (*)

Live

Mount Marion

M15/999

70% (*)

Live

Mount Marion

M15/1000

70% (*)

Live

Mount Finnerty

E15/1408

100%

Live

Mount Finnerty

E15/1416

100%

Live

Mount Finnerty

E15/1430

100%

Pending

Mount Finnerty

E16/305

0% (**)

Live

Mount Finnerty

E16/330

0% (**)

Live

6

Mount Finnerty

E16/341

100%

Live

Mount Finnerty

M15/978

100%

Live

Mount Finnerty

P16/2824

100%

Live

Lake Johnston

E63/1363

80%

Live

Forrestania

E77/2207

100%

Live

Forrestania

E77/2219

100%

Live

Forrestania

E77/2220

100%

Live

Forrestania

E77/2239

100%

Live

Forrestania

E77/2303

100%

Pending

Forrestania

P77/4290

100%

Pending

Forrestania

P77/4291

100%

Pending

* **

- registered holder is Reed Industrial Minerals Pty Ltd (Neometals Ltd 70%, Mineral Resources Ltd 30%). - registered holder is Barranco Resources NL, Neometals Ltd has option to purchase 100%

Changes in interests in mining tenements Interests in mining tenements acquired or increased PROJECT NAME

LICENCE NAME

ACQUIRED OR INCREASED

Forrestania

E77/2303

Applied for 12/06/2015

7

Interests in mining tenements relinquished, reduced or lapsed PROJECT NAME

LICENCE NAME

RELINQUISHED, REDUCED OR LAPSED

Mount Finnerty

E15/836

Surrendered 9/06/2015

Mount Finnerty

M15/506

Surrendered 24/06/2015

Mount Finnerty

M15/507

Surrendered 24/06/2015

Mount Finnerty

M15/511

Surrendered 24/06/2015

Mount Finnerty

M15/522

Surrendered 24/06/2015

Mount Finnerty

E16/260

Surrendered 1/04/2015

Mount Finnerty

E16/272

Surrendered 9/06/2015

Mount Finnerty

E16/308

Surrendered 9/06/2015

Mount Finnerty

E16/375

Surrendered 1/04/2015

Mount Finnerty

E16/455

Surrendered 24/06/2015

Mount Finnerty

P16/2823

Surrendered 24/06/2015

Mount Finnerty

R16/1

Surrendered 24/06/2015

Mount Finnerty

R16/2

Surrendered 24/06/2015

Lake Johnston

E63/1701

Surrendered 12/06/2015

Lake Johnston

P63/1961

Surrendered 12/06/2015

Lake Johnston

P63/1964

Surrendered 12/06/2015

Lake Johnston

P63/1965

Surrendered 12/06/2015

Lake Johnston

P63/1966

Surrendered 12/06/2015

Lake Johnston

P63/1967

Surrendered 12/06/2015

8

APPENDIX B: MINERAL RESOURCE ESTIMATES Mt Marion Resource Table for 0.3% Li2O cut-off Category

Tonnage

Li2O

Fe2O3

(Mt)

(%)

(%)

Measured

2.0

1.45

0.93

Indicated

4.8

1.39

1.22

Inferred

8.0

1.3

1.3

Total

14.8

1.3

1.2

(JORC, 2012)

All tonnage and grade figures have been rounded down to two or three significant figures, respectively; slight errors may occur due to rounding of values.

Barrambie Mineral Resource Estimate for 15% TiO2 cut-off Category

Tonnage (Mt)

TiO2

V2O5

Fe2O3

Al2O3

SiO2

(%)

(%)

(%)

(%)

(%)

Indicated

34.7

22.25

0.64

46.77

9.48

14.95

Inferred

12.5

21.99

0.58

46.51

9.32

15.40

Total

47.2

22.18

0.63

46.70

9.44

15.07

(JORC, 2012)

All tonnage and grade figures have been rounded down to two or three significant figures, respectively; slight errors may occur due to rounding of values.

Compliance Statement The information in this report that relates to Mineral Resource Estimates at the Mt Marion Lithium Project and Barrambie Titanium Project are extracted from the ASX Announcements entitled “ Mt Marion – JORC 2012 Mineral Resource Estimate” lodged 9 December 2013, and “Barrambie Amended JORC 2012 Mineral Resource Estimate” lodged 6 December 2013. The Company confirms that it is not aware of any new information or data that materially affects the information included on the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified form the original market announcement.

9

Quarterly Activities Report - Neometals

Jul 24, 2015 - Subsequent to the end of the quarter the Company has entered into a .... in the relevant market announcement continue to apply and have not.

787KB Sizes 3 Downloads 325 Views

Recommend Documents

Quarterly Activities Report - Neometals
Oct 29, 2015 - Figure 2. Mineral Resource Estimate and Exploration Target outlines ... penetration of renewable energy storage, and electric/ hybrid electric ...

Quarterly Activities Report - Neometals
Jul 24, 2015 - Marion Lithium Project, and to purchase an adjoining mining lease and .... that it is not aware of any new information or data that materially ...

Quarterly Activities Report - Neometals
Oct 29, 2015 - Figure 3. Resource Grade - Tonnage Curve at varying cut-off grades (0.0 ... penetration of renewable energy storage, and electric/ hybrid ...

Quarterly Activities Report - Neometals Ltd.
Apr 22, 2015 - The project has a granted Mining Proposal and received its Works .... it is not aware of any new information or data that materially affects the.

ASX Release 22 April 2015 QUARTERLY ACTIVITIES REPORT For ...
Apr 22, 2015 - patents to a dedicated vehicle, Reed Advanced Materials Pty Ltd (“RAM”) ... The PFS is being managed by Mr D.Michael Spratt, an experienced.

quarterly report - Forager Funds
Sep 30, 2015 - 3. Too Late to Panic About China's Economy. 3. AustrAliAn shAres fund. 6 ... of global GDP, were muddling their way through the worst recession since the ..... That has proved to be a good call, and the unit price ..... ANDROID.

Annual Report to Shareholders 2015 - Neometals
Dec 13, 2012 - 3. Importantly, the successful completion of offtake and equity ... Annual Report 2015 Neometals 3 ...... Galaxy Resources Limited (ASX: GXY).

quarterly report - Forager Funds
Sep 30, 2015 - YouTube and Android) from the company's more speculative endeavours. The two will operate and report separately, further suggesting that ...

Annual Report to Shareholders 2015 - Neometals
Dec 13, 2012 - Operating and Capital costs are both valid as at July 2015 with an indicative accuracy ..... Calculation of potential entitlement to performance rights ...... Application of AASB 9 (December 2009) and AASB 9 (December 2010)'.

ASX Release 28 January 2016 QUARTERLY ... - Neometals Ltd.
Jan 28, 2016 - reverse circulation (RC) holes and 30 diamond holes will be drilled. The drill program is expected to be completed in the June quarter 2016, with an upgraded Mineral Resource Estimate and Ore. Reserve planned to be completed in the Jun

Quarterly Progress Report - cuts citee
2. Activities carried out by CUTS in the month of December, 2014. 2.1 The Diagnostic study ..... http://www.sdpi.org/policy_outreach/event_details448-2014.html.

Quarterly Progress Report - cuts citee
Inputs Trade with Farm and Non-farm incomes and Resource Use Efficiency” to ... II. Sustainable Energy for All (SE4ALL). III. Food Security Session I: Food ...

ASX Release 28 January 2016 QUARTERLY ... - Neometals Ltd.
Jan 28, 2016 - The DFS is supported by an Engineering Cost Study (“ECS”) to give capex and opex ... Market growth is underpinned by the increasing market.

Quarterly Report-January-March2014.pdf
Whoops! There was a problem loading this page. Retrying... Quarterly Report-January-March2014.pdf. Quarterly Report-January-March2014.pdf. Open. Extract.

QUARTERLY FINANCIAL REPORT OF OPERATIONS -2NDQ 2013 ...
R & M - Electrification, Power & Energy Structure 8,565.37. ## R & M - Office Building ... R & M - Motor Vehicle 69,880.00. ## Extraordinary Expense ... QUARTERLY FINANCIAL REPORT OF OPERATIONS -2NDQ 2013.pdf. QUARTERLY ...

Quarterly Report-April-June2014.pdf
SCHOOL OF PUBLIC HEALTH. UNIVERSITY OF ALBERTA. Page 3 of 3. Quarterly Re ... June2014.pdf. Quarterly Re ... June2014.pdf. Open. Extract. Open with.

Quarterly Report Apr-June16-FINAL.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Quarterly Report ...

Quarterly Report-Jan-Mar2017.pdf
Quarterly Report-Jan-Mar2017.pdf. Quarterly Report-Jan-Mar2017.pdf. Open. Extract. Open with. Sign In. Main menu. Whoops! There was a problem previewing ...

Quarterly Report-July-Sept2013.pdf
... THE%DEAN%|%January&6,&2014 2. in January&this&year,&the&transition&is&proceeding&. slowly&but&surely.&There&may&still&be&emotional&.

Quarterly Report-Oct-Dec2013.pdf
Whoops! There was a problem loading this page. Retrying... Quarterly Report-Oct-Dec2013.pdf. Quarterly Report-Oct-Dec2013.pdf. Open. Extract. Open with.

Bitcoin.org Quarterly Report (March 2015) - GitHub
made over 1,000 commits during the past two years, has announced he no ... for all the translations contributed by volunteers and paid translators on our Transifex project page as well as the many reviews made by Saïvann Carignan. 2 ... updated base

QUARTERLY AQUATIC ANIMAL DISEASE REPORT
Containment measures- closed aquarium system (three 1800 L tanks), emptied ..... Names of infected areas: Central Java (Jepara); East Java (Gresik, Tuban);.

Quarterly Report 4 Propinsi Maluku.pdf
Page 3 of 24. “Quarterly Report 4” – Juni 2015. Smallholder Livelihood Depelopment in Eastren Indonesia (SOLID) Maluku Page iii. Kata Pengantar.

QUARTERLY AQUATIC ANIMAL DISEASE REPORT
is more inclined or intended for fulfilling international certification system for exported aquaculture .... information available this period in the Australian Capital Territory. 5. Infection ...... Manager Director of Aquatic Animal Diseases Depart