Updated on : 17/04/2014 1233 hrs DATA MIGRATION COMMAND CENTRE, Chennai 600 002 [email protected]

Preparatory checklist for CBS (I)

Pre Requisites 1. A node with Windows 7 along with SQL2005/ SQL 2008 to be kept ready for uploading data through SFTP server. Latest Antivirus software has to be installed in this node. This node will be used as backup server. 2. Download Filezilla software from the below said link and the install the same in this node. https://drive.google.com/file/d/0B25bTWT2-kXgaU1qcW56VElyM1E 3. Restore post , sign ,sosb, bpro, blog in the backup server (i.e Node mentioned in Slno.1) Check whether the sanchay post software is working with this Sql server connectivity in this node only (Caution : No change is required in the original server in respect of SQL version and the regular server will continue to serve the Sanchaypost network)

(II)

Pre requisites – Data cleansing

1. Scheme-wise, account-wise balance agreement has to be completed and consolidated balances certified by the postmaster & the Divisional head. 2. 100% manual records have to be digitized using Sanchaypost Ver 7.5 and Manual Data Entry tool published in SDC portal. 3. 4 Years history data of NSS-87 should be completed using the Manual Data Entry Tool said in item(2) 4. Manual data relating to KVP, NSC 8 and NSC 9 should be updated in Sanchaypost 7.5 5. On the date of actual migration this manual data should have the updated entries deleting the details of KVP/NSCs discharged and accounts closed. 6. Many post offices are in the habit of discharging the certificates by selecting the option “Issued at other office / Manual” even though these certificates were issued in the same office. 7. This discrepancy could be viewed using, DB Analyzer--> Reports—live account. Post offices are instructed to ensure that the live accounts list so generated should match with the office records. The certificates already discharged are to be cleared using online discharge option.

(III)

Steps to be followed for Go Live (Points 1 to 8 to be performed in the Live Server)

1. Download the Latest DB Analyzer including (DBA+ Tool dt. 14-04-2014) through the link below and execute the same. https://drive.google.com/folderview?id=0B25bTWT2-kXgUmtISzgwdURmUUk 2. Each and every option in Database Discrepancies, CBS Additional Discrepancies and CBS Discrepancies (II) for all schemes in DB Analyzer have to be checked and discrepancies cleared. 3. All agents (ie. MBKBY ,PRSS & SAS Agents) should be linked with PO Savings Account Number and PanNumber. Provision available in the latest DB Analyser – Miscellaneous option to check the Agents linked / Not linked with Saving Accounts. 4. It is also requested to ensure that all the accounts closed under Claim closure status are marked as ‘CLOSED’ in Ledger/Index tables, as the accounts having remarks as ‘Claim closure’ will be migrated as Live accounts in FINACLE. 5. During the Go-live migration, it is requested to change the BO details. Please verify the BO details today if applicable and take necessary corrective actions before Go-live. It is very difficult to accommodate due to stringent timelines. 6. Take backup of Post Database. If any problem faced in the coming process you have to restore the post database. If you fail to take backup dmcc will be not provide any solution thereafter. 7. Download the Premigrationtool _2_31 dt.16-04-2014 and execute the tool from the below said link https://drive.google.com/folderview?id=0B25bTWT2-kXgTWtPQXM5ejVESUk Check for sample data whether it has not effected correct data like name,address.etc. If any there is any major change in correct data restore the database and contact DMCC, Chennai for solution. 8. Execute DPT Tool 2.9 and DB Analyzer consolidation report and ensure that zero discrepancy exists. DPT Tool 2.9 Link : https://drive.google.com/folderview?id=0B25bTWT2-kXgeC01NTFGVF9hSW8 9. Download the SP-Link Aadhaar Number.exe from the below said link and execute the same to create UIDAI related tables. https://drive.google.com/file/d/0B25bTWT2-kXgdnFQdmxDTUtYekU

10. Ensure Agt_act and UIDAI table exists in the Post database.(this will get created when we use option to link adhaar and linking agent with SB account number 11. Check the Database consistency using DB Analyser for Post and Sign database and ensure that there is no error in the database. If error is reported kindly send email to [email protected] for solution. This is a very important step as it is related to data integrity of post and sign.

Preparation of Data for CBS.pdf

Page 1 of 3. Updated on : 17/04/2014 1233 hrs. DATA MIGRATION COMMAND CENTRE,. Chennai 600 002. [email protected]. Preparatory checklist ...

77KB Sizes 3 Downloads 289 Views

Recommend Documents

Process for the preparation of oligonucleotides
Feb 16, 1990 - Attorney, Agent, or Firm-Hamilton, Brook, Smith &. Reynolds ...... Patent Application No. ... II: design and synthetic strategy to the synthesis of 22.

instructions for preparation of manuscripts -
The authors wish to express their acknowledgement to the Basque Government and the Provincial Council of. Gipuzkoa. This work has been funded by them as ...

Process for the preparation of oligonucleotides
Feb 16, 1990 - of attachment, compare Liebigs Ann. Chem. 1974, 959. (c) Oxidation of the carrier-bond nucleotide-nucleoside, of the general formula VI, ...

instructions for preparation of papers
sources (RESs) could be part of the solution [1,2,3]. A HPS is ... PV-HPSs are one of the solutions to the ..... PV Technology to Energy Solutions Conference and.

Preparation of Papers for Journal of Computing
note that use of IEEE Computer Society templates is meant to assist authors in correctly formatting manuscripts for final submission and does not guarantee ... The quality and accuracy of the content of the electronic material ..... "Integrating Data

Engagement for the Preparation of Accounting Manual for The CCI ...
Engagement for the Preparation of Accounting Manual for The CCI Limited..pdf. Engagement for the Preparation of Accounting Manual for The CCI Limited..pdf.

instructions for preparation of full papers
combination of bus, subway, and train routes is not an easy job even for local ..... transportation data management and analysis and fully integrates GIS with .... TransCAD Software (2003) TransCAD, Caliper Corporation, Newton MA, USA.

format for preparation of btech project report
The name of the author/authors should be immediately followed by the year and other details. .... Kerala in partial fulfillment for the award of Degree of Bachelor of Technology in. Mechanical ..... very attractive for automotive applications.

instructions for preparation of extended abstract - PhD Seminar 2006
May 25, 2005 - [5] Ana N. Mladenović: “Toroidal shaped permanent magnet with two air gaps”, International PhD-Seminar “Numerical. Field Computation and Optimization in Electrical Engineer- ing”, Proceedings of Full Papers, Ohrid, Macedonia,

A Manual for Preparation of Thesis -
Items 1 - 8 - textual matter is typed to the extent possible in the same format as may be ... Bonafide Certificate – Using double spacing for typing the Bonafide ...

instructions to authors for the preparation of manuscripts
All these capabilities make airships an attractive solutions for the civilian and military ..... transmit video, remote control, and other data exchange tasks. Camera based ... Sensors, Sensor. Networks and Information Processing Conference, 2004.

Instractions for the Preparation of Camera-Ready ...
*Laser Processing Research Centre, School of Mechanical, Aerospace and Civil Engineering, ... Keywords: Laser nanopatterning, optical near-field effect, large area processing. .... ages of line-shape patterns fabricated by the proposed tech-.

instructions for preparation of full papers
simplify the data structure and make it very direct to be accessed so that the ... enterprise and road companies should be used as much as possible to .... transportation data management and analysis and fully integrates GIS with .... Nicholas Koncz,

Appointed on retainer ship basis for preparation of Annual Accounts ...
Appointed on retainer ship basis for preparation of An ... and other related Financial Statements for KSSIDC.pdf. Appointed on retainer ship basis for preparation ...

instructions for preparation of a camera ready manuscript
acoustic field performed in the frequency or the time domain. .... measurement ( s(t) ) in a noise free environment at a range of 5 km and depth of 100 m is.

Preparation of Papers for AIAA Technical Conferences
Ioffe Physical Technical Institute of the Russian Academy of Sciences,. St.Petersburg, Russia. E-mail: [email protected]. I. Introduction. In the work a ...

Sample Preparation of Energy Materials for Xray ...
Mar 25, 2014 - phy sample preparation using FIB milling and lift-out. ... out. The resulting high-quality 3D volume data can be used to extract critical 3D morphological parameters such as volume fractions, feature size distribution, surface ..... [1

Instructions for the Preparation of a
Last great milestone in this environment was made by introducing Internet and .... {Class/Individual2} are two dynamic text placeholders which are in process of ...

eBook NC Foundations of Reading: Preparation for the ...
... extensive reporting, and a glossary of domain-specific terms work together to ... [Full] Free ,NC Foundations of Reading: Preparation for the North Carolina ...