PLANNED OUTAGE NOTIFICATION Informational Messages OUTAGE PURPOSE: To accommodate front end electrical equipment installation for the Cougar Substation Project. http://www.uh.edu/facilities-planning-construction/fpc-projects/spotlight/cougar-substation/

IMPACT MESSAGE: Brief interruptions to electrical services for approximately 50% of central campus. There will be two (2) separate interruptions. 1. Wednesday, February 8 2. Saturday, February 11 The interruptions will have durations from a few seconds up to 5 minutes. Please see the building impact list on the following pages for specific buildings that will be impacted and estimated duration outage times. Please make all necessary arrangements to protect interdepartmental equipment (computing, research, office, etc.). After the outage, facilities technicians will verify that the main building systems are operational – operation of interdepartmental equipment will need to be verified by the building occupants and users. Report any related facilities issues to the FIX-IT Customer Service Center. (www.uh.edu/fixit)

Outage Schedule / Building(s) Outage Start Date: Start Time: Building(s) Affected:

Wednesday, February 8, 2017

Outage End Date:

5:00 AM

End Time:

See List of Buildings

Building No:

Saturday, February 11, 2017 5:00 AM See List of Buildings

Type of Outage Electric

Gas

Domestic Cold Water

DI Water

Condensate

Domestic Hot Water

Steam

Compressed Air

Chilled Water

Vacuum

Air Handling Unit

OTHER

Primary Outage Contact Primary Contact: Secondary Contact:

Dean Ruck Patrick Kennedy

Please call the Facilities Service Center, 24/7, at 713-743-4948 (FIXIT) to reach the Primary Outage Contact.

Onsite Contractor Contact Primary Contact: Telephone: Secondary Contact: Telephone:

Tim Adam 281-413-4286 Jack Levy 281-413-4257

Position: Email: Position: Email:

Project Superintendent [email protected] Project Manager [email protected]

P:\Facilities Management\Communications and Programs\Outage Notifications\_Outage Notifications\PLANNED ELECTRIC OUTAGE NOTIFICATION -- MULTIPLE BUILDINGS (8 FEB & 11 FEB 2017).docx Form Updated: 08/27/2015

Outage Review and Approval Process (FS COMMUNICATIONS OFFICE USE ONLY) Outage Requested by: Outage Approved by: Outage Notice Issued by: Building Coordinator(s):

Fire Marshal: EHLS: OEM:

Dean Ruck/Patrick Kennedy Mike Wheeler Jennifer Rea Initial Awareness Email to BC’s Discussion Meetings with BC’s Final Dates/Times Email to BC’s Wendell McCloud Joe Tremont Kelly Boysen

Request Date: Approval Date: Issue Date: Sign Off Date:

Sign Off Date: Sign Off Date: Sign Off Date:

05 January 2017 13 January 2017 revised dates/times 18 January 2017 18 January 2017 06 January 2017, 09 January 2017 10, 12, 13 January 2017 13 January 2017 13 January 2017 13 January 2017 13 January 2017

P:\Facilities Management\Communications and Programs\Outage Notifications\_Outage Notifications\PLANNED ELECTRIC OUTAGE NOTIFICATION -- MULTIPLE BUILDINGS (8 FEB & 11 FEB 2017).docx Form Updated: 08/27/2015

Cougar Sub Expansion Outage Building Impacts Outage Dates

Bldg #

Building Name

Duration of Power Impact

Time of Power Impact Per Day

Present Feeder

Available Feeders

CGR Feeder Out of Service

Wednesday 2/8/2017

487 494 501 502 503 505 506 507 508 509 513 516 517 518 524 525 526 528 531 532 533 534 537 538 539 540 543

STUDENT CENTER SOUTH *Agnes Arnold Auditorium ROY CULLEN OLD SCIENCE *Technology Annex OPTOMETRY *Jack Valenti School of Communications WORTHAM THEATRE College OF TECHNOLOGY M.D. LIBRARY *Visitors Information Booth 2 E. CULLEN CULLEN PERFORMANCE HALL CALHOUN LOFTS STUDENT SERVICE CENTER 1 UH HEALTH CENTER STUDENT SERVICE CENTER 2 LEROY & LUCIE MELCHER HALL HOFHEINZ PAVILION * Susanna Garrison Gym *Melcher Gym/ Charter School HEYNE *Bates Law *Teaching Unit 2 MAX KROST HALL *John M. O' Quinn Law Library GERALD D. HINES College OF ARCHITECTURE

2-3 seconds 2-3 seconds 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

7 * 2 8 * 11 * 9 9 11 * 2 * 4& 6 2 * * 7 13 * * 2 * * 6 * 6

5 -(7) * 1 - (2) (3)-8 * * (9) - 10 10 - (9) 12 - (11) * 1 - (2) * no pref 1 - (2) * * 5 - (7) (13) - 14 * * 1 - (2) * * 4 - (6) * 10 - (6)

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

544 547 549 552 562 563 565 568

*Cemo Hall PHILLIP GUTHRIE HOFFMAN HALL *Graduate School of Social Work *Burdette Keeland Jr. Design & Expl Center A.D. BRUCE RELIGION CENTER COUGAR VILLAGE I *STUDENT CENTER NORTH JUSTIN DART JR CENTER FOR STUDENTS WITH DISABILITIES AGNES ARNOLD *Cougar Baseball Field *Cougar Field Ticket Booth STEPHEN POWER FARISH HALL *Charles F. McElhinney Hall FINE ARTS BUILDING HILTON HOTEL NORTH ATHLETIC/ALUMNI CENTER

2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

* 8 * * * 2 * *

* 3 -(8) * * * 2 * *

2 2 2 2 2 2 2 2

2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

8 * * 2 * 6 7 13

3 - (8) * * 1 - (2) * 10 - (6) 5 -(7) (13) - 14

2 2 2 2 2 2 2 2

578 582 583 587 588 589 590 574/573

Cougar Sub Expansion Outage Building Impacts Outage Dates

Bldg #

Building Name

Duration of Power Impact

Time of Power Impact Per Day

Present Feeder

Available Feeders

CGR Feeder Out of Service

Saturday 2/11/2017

487 494 501 502 503 505 506 507 508 509 513 516 517 518 524 525 526 528 529

STUDENT CENTER SOUTH *Agnes Arnold Auditorium ROY CULLEN OLD SCIENCE *Technology Annex OPTOMETRY *Jack Valenti School of Communications WORTHAM THEATRE College OF TECHNOLOGY M.D. LIBRARY *Visitors Information Booth 2 E. CULLEN CULLEN PERFORMANCE HALL CALHOUN LOFTS STUDENT SERVICE CENTER 1 UH HEALTH CENTER STUDENT SERVICE CENTER 2 LEROY & LUCIE MELCHER HALL SCIENCE & ENGINEERING CLASSROOM BLD.

2-3 seconds 2-3 seconds 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

7 * 2 8 * 11 * 9 9 11 * 2 * 6 2 * * 7 *

5 -(7) * 1 - (2) (3)-8 * * (9) - 10 10 - (9) 12 - (11) * 1 - (2) * no pref 1 - (2) * * 5 - (7) *

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1

531 532 533 534 537 538 539 540 543

2-3 seconds HOFHEINZ PAVILION 2-3 seconds * Susanna Garrison Gym 2-3 seconds *Melcher Gym/ Charter School 3-5 minutes HEYNE 2-3 seconds *Bates Law 2-3 seconds *Teaching Unit 2 2-3 seconds MAX KROST HALL 2-3 seconds *John M. O' Quinn Law Library GERALD D. HINES College OF ARCHITECTURE 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

13 * * 2 * * 6 * 6

(13) - 14 * * 1 - (2) * * 4 - (6) * 10 - (6)

2 2 2 2 2 2 2 2 2

544 545

*Cemo Hall SCIENCE & ENGINEERING RESEARCH CNT.

2-3 seconds 2-3 seconds

5:00am 5:00am

* 15

* (15)-16

2 1

547 549 552 562 563 565 568

PHILLIP GUTHRIE HOFFMAN HALL *Graduate School of Social Work *Burdette Keeland Jr. Design & Expl Center A.D. BRUCE RELIGION CENTER COUGAR VILLAGE I *STUDENT CENTER NORTH JUSTIN DART JR CENTER FOR STUDENTS WITH DISABILITIES AGNES ARNOLD *Cougar Baseball Field *Cougar Field Ticket Booth STEPHEN POWER FARISH HALL *Charles F. McElhinney Hall FINE ARTS BUILDING HILTON HOTEL NORTH ATHLETIC/ALUMNI CENTER

2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

8 * * * 2 * *

3 -(8) * * * 2 * *

2 2 2 2 2 2 2

2-3 seconds 2-3 seconds 2-3 seconds 3-5 minutes 3-5 minutes 2-3 seconds 2-3 seconds 2-3 seconds

5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am 5:00am

8 * * 2 * 6 7 13

3 - (8) * * 1 - (2) * 10 - (6) 5 -(7) (13) - 14

2 2 2 2 2 2 2 2

578 582 583 587 588 589 590 574/573

PLANNED ELECTRIC OUTAGE NOTIFICATION -- MULTIPLE ...

PLANNED ELECTRIC OUTAGE NOTIFICATION -- MULTIPLE BUILDINGS (8 FEB & 11 FEB 2017) W LIST.pdf. PLANNED ELECTRIC OUTAGE NOTIFICATION ...

152KB Sizes 0 Downloads 286 Views

Recommend Documents

PLANNED PARKING LOT AREA OUTAGE NOTIFICATION -- MOODY ...
Nov 21, 2016 - PLANNED PARKING LOT AREA OUTAGE NOTIFICATI ... DY (21 NOV THRU 30 DEC 2016) W DIAGRAM.pdf. PLANNED PARKING LOT AREA ...

PLANNED ADA RAMP AND ENTRANCE CLOSURE OUTAGE ...
Outage Notice Issued by: Jacquie Vargas Issue Date: 10 March 2016. Building Coordinator: Nancy Nguyen Sign Off Date: 09 March 2016. Fire Marshal: Chris McDonald Sign Off Date: 09 March 2016. Page 1 of ... ATION -- E CULLEN (BEGINS 9 MAR 2016).pdf. PL

PLANNED ROAD CLOSURE NOTIFICATION -- WELCOME ...
Secondary Contact: Pat Kennedy. Onsite Contractor Contact. Primary Contact: Shawn Adams Position: Civil Superintendent. Telephone: 281-381-7931 Email: ...

Cognitive Multiple-Antenna Network with Outage and Rate Margins at ...
Content may change prior to final publication. Citation information: DOI. 10.1109/TVT.2014.2345588, IEEE Transactions on Vehicular Technology. 1. Cognitive Multiple-Antenna Network with Outage and Rate Margins at the Primary System. Behrouz Maham, Me

Electric Field from Multiple Charges Notes Blank.pdf
Electric Field from Multiple Charges Notes Blank.pdf. Electric Field from Multiple Charges Notes Blank.pdf. Open. Extract. Open with. Sign In. Main menu.

Electric Field from Multiple Charges Notes Blank.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Electric Field ...

Baghaichari arson pre-planned
May 6, 2008 - and journalists raised questions yesterday at a news conference ... was to drive away the indigenous people from the area to make way for new.

Pre-Planned Absence.pdf
make-up work and that certain activities and lessons may be impossible to make-up, such as field trips, labs,. guest speakers, class discussions, etc. Date.

Planned Parenthood Missouri Bill Summary
Parenthood. HB 2010 is the budget bill for the Dept. of Health and Senior Services, ..... Similar to SB 604. Requires certain establishments to hang a poster providing information regarding the National Human Trafficking Resource. Center Hotline. ...

Planned Absence Form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Planned ...

Notification
Jul 25, 2012 - served by frequent bus services from all sides. ..... Park” means an area developed exclusively for locating software ...... Revenue Accounting.

Notification
Jul 25, 2012 - Year Number of Persons Growth Rate (percentage) ... 1. Kundli- Manesar-Palwal (KMP) Expressway passing by the southern side of ..... Around High School, village Garhi Bazidpur declared vide Haryana ..... Wholesale Trade.

Diversity–Multiplexing Tradeoff and Outage ...
ence, Korea Advanced Institute of Science and Technology (KAIST), Daejeon. 305-701 ..... in a fading environment when using multiple antennas,” Wireless Per-.

Ergodic Capacity and Outage Capacity
Jul 8, 2008 - Radio spectrum is a precious and limited resource for wireless communication ...... Cambridge, UK: Cambridge University Press, 2004.

Outage Performance of Multi-Antenna Cooperative Incremental ...
Email: [email protected] ... the link from source to destination while the other locates near ... as an incremental link, and this system is referred to as.

SCE Power Outage Notification.pdf
SCE Power Outage Notification.pdf. SCE Power Outage Notification.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying SCE Power Outage ...

PLANNED PARENTHOOD ABORTION FACILITIES ...
million African Americans in the US, fourteen million unborn black American ... abortion since 1973 than the total number of African American deaths from AIDS, .... includes work in data analysis and research for the National Highway Traffic ...

160912 Outage Reporting Reply Comments.pdf
The Proposed Extension of Part 4 of the Commission's. Rules Regarding Outage Reporting to Interconnected. Voice Over Internet Protocol Service Providers ...

Planned Parenthood Federation of America (PPFA) is the nation's ...
Feb 5, 2016 - Planned Parenthood Federation of America (PPFA) is the nation's leading women's health care provider, educator, and advocate. For nearly ...