Site Specific Park Plans Proposed 2016 Alternate Improvements April 11, 2016 Estimated Construction Cost

Park

Improvement

1. Clack’s Corner

Note: Overall site improvements scheduled to be completed and funded under the Revised Proposed 2016 Improvements. Sub-Total 25% Contingency Estimated Total

2. Briarwood Park

3. Blackburn Park

4. *Brookhaven Park

5. *Murphey Candler Park

6. Lynwood Park

A. Parking B. Outdoor Classroom C. Perimeter Trail Sub-Total 25% Contingency Estimated Total

$10,000.00 $19,020.00 $51,700.00 $ 80,720.00 $ 20,200.00 $100,920.00

Sub-Total 25% Contingency Estimated Total

$90,000.00 $90,000.00 $22,500.00 $112,500.00

Sub-Total 25% Contingency Estimated Total

$120,000.00 $120,000.00 $30,000.00 $150,000.00

A. Park Service Area – (Playground/Restroom) Sub-Total 25% Contingency Estimated Total

$182,500.00 $182,500.00 $ 45,700.00 $228,200.00

A. Family Picnic Shelters - (6 Qty.)

A. Restroom - (4 Stall)

A. Concrete Multi-Use Trail Sub-Total 25% Contingency Estimated Total



$0 $0 $0 $0

$25,200.00 $25,200.00 $ 6,300.00 $31,500.00

7. Fernwood Park

8. Georgia Hills Park

9. Skyland Park

10. Ashford Park

11. Parkside Park

12. Osborne Park

A. Rebuild Existing Bridge Sub-Total 25% Contingency Estimated Total

$100,000.00 $100,000.00 $25,000.00 $125,000.00

Sub-Total 25% Contingency Estimated Total

$17,500.00 $17,500.00 $ 4,400.00 $21,900.00

Sub-Total 25% Contingency Estimated Total

$25,200.00 $25,200.00 $ 6,300.00 $31,500.00

Sub-Total 25% Contingency Estimated Total

$5,000.00 $5,000.00 $1,300.00 $6,300.00

Sub-Total 25% Contingency Estimated Total

$5,000.00 $2,400.00 $7,400.00 $1,900.00 $9,300.00

Sub-Total 25% Contingency Estimated Total

$5,000.00 $5,000.00 $1,300.00 $6,300.00

A. Half-Court Basketball Court

A. Concrete Multi-Use Trail

A. TriCycle Track

A. Monumental Park Sign – (1 Qty.) B. Picnic Tables – (2 Qty.)

A. Monumental Park Sign – (1Qty.)

Revised - Proposed 2016 Improvements Total Estimated Cost $823,420.00 NOTE: This “Opinion of Estimated Construction Costs” is not a construction cost estimate. It is an estimate of probable costs made on the basis of our project team’s judgment as qualified professionals experienced with recreation development projects. Cost items and estimated quantities were determined from Park Master Plan Drawings developed for the City of Brookhaven, dated February 9, 2016. Unit costs were based on pricing from RSMeans, manufacturers, product suppliers and previous project experience. Since our project team has no control over the actual cost of contractor labor, materials, equipment, means and methods, or services furnished by others, or over the construction contractor’s methods of determining prices, or over competitive bidding or market conditions, our project team cannot and does not guarantee that proposals, bids, or actual construction cost will not vary from the prepared Opinion of Estimated Construction Costs within any specified accuracy range. Costs for design, permitting, and contract administration during construction are excluded.

*Murphey Candler Park- Supplemental funding sources (ex. Grant funds and donations) will be used to help fund this project.

*Brookhaven Park- This project will move forward once the City of Brookhaven purchases the property from Dekalb County.



Park Master Plan Alternate - April 11, 2016.pdf

Osborne Park A. Monumental Park Sign – (1Qty.) $5,000.00. Sub-Total $5,000.00. 25% Contingency $1,300.00. Estimated Total $6,300.00. Revised - Proposed ...

119KB Sizes 1 Downloads 197 Views

Recommend Documents

Master Plan
The commercial block includes business clubs and space for offices. ... TOLL FREE NUMBER (India): 1800 102 9977 | E-MAIL: salesenquiry@brigadegroup.

Master Plan
or the Developer's Architect and cannot form part of an offer or contract. ... We envision the center to be a training facility that'll allow you to excel in sports.

11 April 2017 - SETTRADE.COM
Apr 11, 2017 - Open. Gold. 1257.20. 1247.00. 1253.76. 1254.23. A.M.Fixing. -. -. -. 1253. P.M.Fixing ... Euro. 1.0606. 1.0568. 1.0590. 1.0593. Baht. 34.67. 34.57. 34.61. DollarIndex 101.340 .... Bank Holiday : Good Friday. -. -. 19.30 . (CPI) .

Master Plan - Population.pdf
Page 3 of 21. Development Services. 10 E. Mesquite Blvd. Mesquite NV 89027. (702) 346-2835. Population. Element. Note: This document represents one of ...

April 11 2017.pdf
... Petrie, Superintendent; Mr. Mason, Treasurer; Mr. Mills, High/MS Principal, Mrs. ... Terry Lichtenburg Aide (4 hours per day) Aide Step 0. 3. ... April 11 2017.pdf.

Master Plan - Transportation Plan Map 11x17.pdf
Master Plan - Transportation Plan Map 11x17.pdf. Master Plan - Transportation Plan Map 11x17.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ...

Nora Mitchell April 11, 2017 - GitHub
Apr 11, 2017 - It estimates effective population sizes and past migration rates between populations ... Which model has the highest support? Which would you.

saturday, april 16, 2011, lakeshore park, brandon, ms ...
SATURDAY, APRIL 16, 2011, LAKESHORE PARK, BRANDON, MS ... Phone: ... 6508 Dogwood View Parkway, Suite B, Jackson MS 39213, or E-mail it to ...

April 11 Alert SBI.pdf
Action Five: Social Media. Twitter: Access your member of Congress' twitter handle at http://stuffthought.com/blog/113th-congress-twitter-handles/. Sample ...

April 11, 2018 Board Minutes.pdf
Approve Resignation of Justin Johnson as Teacher and Coach for 2018-19 School. Year. c. Approve Resignation of Shelly Berkowitz as K-8 Art Teacher for ...

PEMBINA GORGE RECREATION MASTER PLAN ...
PEMBINA GORGE RECREATION MASTER PLAN. sPECIFIC AREA CONCEPTS. visitor'S Center ... kETTLE lAKE. SMALL AMPHITHEATER/ outdoor Education.

Downtown Master Plan - City of Langley
Nov 16, 2007 - Objective: Create soil contamination cleanup requirements that are as practical as possible for ...... Relax building code and zoning. • West of ...

Form - Planning - Zone Change Master Plan Amendment.pdf ...
Phone No Email Fax No. Applicant (if different than Owner). Mailing Address. Phone No Email Fax No. Contact Person/Representative (if different than Owner).

Treeline Master Plan Appendices.pdf
Community-Wide Meeting. Stakeholder Focus Group Meeting(s). CM#2. (2/16). TAC#1. TAC#2. TAC#3. TAC#4. TAC#5. TAC#6 CAC#4. (4/19). TAC#7. TAC#8. CAC#5. (7/19) CAC#6. (9/13). CM#3. (10/4). Page 3 of 564. Treeline Master Plan Appendices.pdf. Treeline Ma

Transportation Master Plan - City of Alexandria
Jul 1, 2002 - -City Strategic Plan 2004-2015. Transportation Vision .... It is a blueprint for creating a safe and convenient bicycle network that will increase the number of ...... also outlined how social marketing campaigns can be used to ...

Transportation Master Plan - City of Alexandria
Jul 1, 2002 - Alexandria will increase the use of communications technology in transportation systems. ..... Extensive use of wireless technology for personal.

Medford Square Master Plan - Existing Conditions Memorandum ...
Medford Square Master Plan - Existing Conditions Memorandum - 10-25-16-web.pdf. Medford Square Master Plan - Existing Conditions Memorandum ...

mise en plan piece 11
Page 1. 8. 18. 1. 45°. 0,50. 45°. 3. 3. 8. M. 10. Ch.1 X 45°. PIECE : 11.

Plan 2_Digital Citizen_Gr 11.pdf
... my social media accounts. The Exploration (30 Minutes):. ○ Read the article, “5 Facebook Rulings that can affect what Canadians can do. online" - Within the ...

11 SAMPLE LESSON PLAN. PREPARING THE CONVERSATION.pdf
tandards: p. d ideals: giv. pictures peo. mena and e. ntal concer. and present. ares: pictur. ent: picture. le phone, m. ons: pictures. al issues: pi. furniture, ta. G. Gr ... rds for the. group, per. e the same. w.google.co. Ask the stu. f students

Sunset Park BOA RFP final7-13-11.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Sunset Park ...