PSA does not follow PDUFA or BsUFA meeting timelines. Preparatory time to initiate process is 2-3 months; schedule below is an estimate. **Scheduled meetings correspond to Scientific Advice Working Party (SAWP)meeting schedule**
EMA Timeline
FDA Timeline
90 days from start of procedure to finalization of FDA meeting record FDA Pre-meeting* FDA sends preliminary response to EMA/EMA does the same for FDA**
Day -20 to -45 FDA Agrees to PSA Request
Day -5
EMA agrees to PSA request; Sponsor submits Letter of Intent/Draft Meeting Package
Day - 20 to -45 15 - 40 days
EMA validates PSA request; approves final meeting package
Day 30
Day 0
EMA starts PSA procedure (SAWP1)
Day -5
5 days
FDA/EMA-SAWP Premeeting (SAWP2)
Day 0
30 days
Day 90
Day 60 FDA/EMASAWP/Sponsor Meeting (SAWP3)
FDA/EMA-SAWP Premeeting (SAWP 2)
FDA Starts PSA procedure
FDA Receives Final Meeting Package
30 days
FDA/EMA-SAWP/Sponsor Meeting (SAWP3)
Day 30
30 days
FDA finalizes meeting record and sends to EMA- SAWP and sponsor
Final advice letter to sponsor
Day 60
10 days
70 days from start of procedure to adoption of final advice letter
*FDA pre-meeting at least 8 business days before FDA/EMA SAWP2 meeting **FDA sends preliminary response to EMA/SAWP 2-3 days before FDA/EMA SAWP2 meeting
Day 70
PSA Timeline Chart* Day
FDA
Anytime
Sponsor submits informal request for Parallel Scientific Advice to FDA and EMA
Day -20 to -45
FDA agrees to informal PSA request; Sponsor submits formal PSA request to FDA.
Day 0 to -24
EMA
EMA agrees to informal PSA request; Sponsor submits letter of intent (formal PSA request) and draft package EMA reviews draft package; appoints coordinator
Day -5
FDA receives final meeting package
EMA validates PSA request; approves final meeting package
Day 0
FDA PSA process starts
EMA PSA process starts (SAWP1)
Day 15-20
FDA pre-meeting
Day 25-28
FDA sends preliminary responses to EMA
EMA sends preliminary responses to FDA
Day 30
Joint FDA/EMA meeting (SAWP2)**
Joint FDA/EMA meeting (SAWP2)
Day 60
Sponsor/FDA/EMA meeting (SAWP3)
Sponsor/FDA/EMA meeting (SAWP3)
Day 70 to 90
FDA issues final meeting record (day 90 for FDA)
EMA issues final advice letter (day 70 for EMA)
*PSA does not follow PDUFA or BSuFA meeting timelines. Preparatory time to initiate process is 2-3 months; schedule above is an estimate. Scheduled meetings correspond to Scientific Advice Working Party (SAWP) meeting schedule. timelines. **Best Practice: FDA and EMA develop a list of common issues/answers to questions. Both agencies send to sponsor preliminary common issues (EMA)/answers to questions (FDA). Sponsor sends in a revised proposal and meeting package prior to SAWP3.
Apr 25, 2017 - Parallel regulatory HTA advice; R and D platform meeting. 3. 0. 5. 10 ... European network for Health Technology Assessment | JA3 2016-2020 ...
Nov 15, 2013 - parallel scientific advice from FDA and EMA on issues related to the development phase of a new product. ... License Application (BLA) in the US, or (c) a potential marketing authorization applicant. (MAA) under ... differences, meetin
15 Dec 2016 - application. Furthermore, the Scientific Advice Working Party will bring forward scientific advice to facilitate proactive pharmacovigilance planning, and integrated advice on safety, quality and efficacy .... The SAWP shall pay special
European Medicines Agency, 2017. Reproduction is authorised provided the source is acknowledged. 7 December 2017. EMA/CVMP/SAWP/574285/2017. Committee for Medicinal Products for Veterinary Use (CVMP). Work plan for the CVMP Scientific Advice Working
E-mail [email protected] Website www.ema.europa.eu .... Can an applicant apply for small and medium-sized enterprise (SME) status? ..... recommended to ensure the adequacy and the readability of the design and content of the package.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc.
Mar 27, 2015 - This position may also collect monitoring data on hydraulic project .... What best describes your level of proficiency using ArcMap software?
Mar 27, 2015 - Organize and enter data into the Fish Passage Diversion Screening Inventory ... Use GIS software (ArcMap) to analyze data and create maps of ...
views. Shown here: Context-aware activity for finite state machine analysis. .... are big misses that can escape IP and subsystem .... External Data ... Plan. Figure 6: The vManager platform's advanced verification methodology control cycle ...
The Sloan Digital Sky Survey has found âM/M as small as 1% on the scale R ~ 1025m and cosmic mi- ..... up until the point when she answers the question. âââIndeed, the standard mental picture of what the physical ..... structure would not cor
Jul 25, 2011 - July 25, 2011. CScADS'11. 3. Brief History of HDF. 1987 At NCSA (University of Illinois), a task force formed to create an architecture-independent format and library: AEHOO (All Encompassing Hierarchical Object Oriented format). Becam
CREDIT ALFRED T. KAMAJIAN ( background. ); CORNELIA BLIK ( top inset. ); SARA CHEN ( ..... game Tetris while in college. ..... serversâthe frog perspective.
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Parallel ...
parallel/synchronization automata table. ... changing conditions, by just changing the automata table. 2. ..... condition is reached (according to a reference-table.
4. (a) Write short notes on the following : 10. (i) Spin lock mechanism for ... 71. 5 j. MCSE-011 3. Page 3 of 3. Main menu. Displaying Parallel Computing.pdf.