Orr Modernization Project Update – 7/14/2017 Prepared on: July 14, 2017 Location: 2200 Minnesota Ave SE Ward: 8 Project Budget: $46.9M Design Builder/Architects: cox graae + spack architects Project Manager(s): Matt Flocca Project Status: Construction Construction Start Date: February 15, 2017 Project Completion Date: Summer 2019 General Project Updates ● 100% new construction which, when completed, will replace the outdated open space school. This project will be the first major renovation/construction that Orr has had for several decades. There is a long history of project delays that have caused contention and distrust of D.C. government. This project mobilized on 2/15/2017. ● The building design is complete, we have achieved an estimated GMP (guaranteed maximum price to build the building), and conducted value engineering to get the plans within budget. Project Status ● Summary of Work Completed From 6/30/2017 to 7/14/2017 date. o Continuation with excavating site and hauling off of excess soil. o Proceed with Cast-in-Place Foundations. ▪ Cast-in-Place Foundations - Concrete that is deposited in the place where it is required to harden as part of the structure of a building. ●
Work Scheduled From 7/14/2017 to 7/28/2017 o Foundation placement in progress across the the entire site o Continuation of underground plumbing o Continuation of underground electrical work o Placement of concrete walls (near Minnesota Ave.) o Foundation to grade waterproofing o Begin demolition of sidewalk and level temporary parking lot with new stone o Begin waterproofing
Community Outreach Update ● Community Meeting at the beginning of the academic year
Orr Modernization Project Update – 7/14/2017 Project Contacts ● Toussaint Webster – DCPS Coordinator of Facility Planning & Design (SIT Coordinator) Check out our LIVE CONSTRUCTION CAM!!!
11/28. ⢠Next steps from December 11 to December 22. o DCPS will continue to work with school leadership and the DCPS. Community Actiion Team to finalize SIT members. o DC Department of General Services aims to select a design firm for. the feasibi
Jan 19, 2018 - o Planning to release mechanical, electrical, plumbing, sprinkler, utilities,. earthwork, deep foundations, concrete & steel subcontracts following the final. GMP. o Awaiting from pricing from MCN on redesign of southern façade, libra
Jul 14, 2017 - We have already conducted a priced concept drawing of a new school, to see if it was. possible to modernize with the current $17M budget. The results of the study proved. that we needed $34M more to do the work. Currently DGS's (DC Dep
2/2âPriscilla Jackson. 2/4âJennifer Gallegos. 2/10âMs. Hernandez. 2/14âJan Long. 2/24âKristi Corey. 2/28âDebra Tompkins. Cumpleaños de febrero. ¡Es muy importante asistir a la escuela todos los dÃas! Por favor, asegúrense de que su es
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. AHC Biweekly ...
Apr 2, 2018 - Key Points. â Slides can be found ... Update: Proposed process for using assemblies to develop High Confidence BED Files. â Only 355 extra ...
Aug 19, 2016 - Company Update | TKN. Krungsri Securities ... Income tax on company & subsidiaries. (56). (98). (175) ..... SOLAR SORKON. SPA. SPC. SPCG.
Aug 23, 2017 - Asian city resort Building 2nd Floor 1468/126-128. Karnchanavanit Rd. Hat yai, Amphoe Hat. YaiSongkhla90110. Tel. (074)559-200, (074)559- ...