Orr Modernization Project Update – 7/14/2017 Prepared on: ​July 14, 2017 Location:​ 2200 Minnesota Ave SE Ward:​ 8 Project Budget:​ $46.9M Design Builder/Architects: ​cox graae + spack architects Project Manager(s): ​Matt Flocca Project Status:​ Construction Construction Start Date:​ February 15, 2017 Project Completion Date:​ Summer 2019 General Project Updates ● 100% new construction which, when completed, will replace the outdated open space school.​ ​This project will be the first major renovation/construction that Orr has had for several decades. There is a long history of project delays that have caused contention and distrust of D.C. government. This project mobilized on 2/15/2017. ● The building design is complete, we have achieved an estimated GMP (guaranteed maximum price to build the building), and conducted value engineering to get the plans within budget. Project Status ● Summary of Work Completed From 6/30/2017 to 7/14/2017 date. o Continuation with excavating site and hauling off of excess soil. o Proceed with Cast-in-Place Foundations. ▪ Cast-in-Place Foundations​ - ​ ​Concrete that is deposited in the place where it is required to harden as part of the structure of a building. ●

Work Scheduled From 7/14/2017 to 7/28/2017 o Foundation placement in progress across the the entire site o Continuation of underground plumbing o Continuation of underground electrical work o Placement of concrete walls (near Minnesota Ave.) o Foundation to grade waterproofing o Begin demolition of sidewalk and level temporary parking lot with new stone o Begin waterproofing

Community Outreach Update ● Community Meeting at the beginning of the academic year

Orr Modernization Project Update – 7/14/2017 Project Contacts ● Toussaint Webster​ – DCPS Coordinator of Facility Planning & Design (SIT Coordinator) Check out our LIVE CONSTRUCTION CAM!!!

Preparation for Concrete Foundations

Orr Modernization Project Update – 7/14/2017

Underground Plumbing Risers

Orr Modernization Project Update – 7/14/2017

Concrete Formwork for future Concrete Pour

Orr Biweekly Update 7.14.17.pdf

Orr Biweekly Update 7.14.17.pdf. Orr Biweekly Update 7.14.17.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Orr Biweekly Update 7.14.17.pdf.

1MB Sizes 0 Downloads 164 Views

Recommend Documents

Kimball Biweekly Update 7.14.17.pdf
Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Project Status: Planning. Construction Start Date: Fall 2017.

Kimball Biweekly Update 2.2.18.pdf
Page 1 of 1. Kimball Modernization Project Update. Prepared on: February 2, 2018. Location: 3375 Minnesota Ave SE. Ward: 7. Overall Project Budget: $51M. Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Pro

West Biweekly Update 120617.pdf
11/28. • Next steps from December 11 to December 22. o DCPS will continue to work with school leadership and the DCPS. Community Actiion Team to finalize SIT members. o DC Department of General Services aims to select a design firm for. the feasibi

Kimball Biweekly Update 1.19.18.pdf
Jan 19, 2018 - o Planning to release mechanical, electrical, plumbing, sprinkler, utilities,. earthwork, deep foundations, concrete & steel subcontracts following the final. GMP. o Awaiting from pricing from MCN on redesign of southern façade, libra

Kimball Biweekly Update 7.14.17.pdf
Jul 14, 2017 - We have already conducted a priced concept drawing of a new school, to see if it was. possible to modernize with the current $17M budget. The results of the study proved. that we needed $34M more to do the work. Currently DGS's (DC Dep

Kimball Biweekly Update 6.2.17.pdf
Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Project Status: Planning. Construction Start Date: Fall 2017.

Orr February Newsletter.pdf
2/2—Priscilla Jackson. 2/4—Jennifer Gallegos. 2/10—Ms. Hernandez. 2/14—Jan Long. 2/24—Kristi Corey. 2/28—Debra Tompkins. Cumpleaños de febrero. ¡Es muy importante asistir a la escuela todos los días! Por favor, asegúrense de que su es

Daigger-Orr Supplement.pdf
11 4473 763 Feb 18 77 PD Chisum 748 1273 730 806 1070 1196 3.28. 12 3014 725 Jan 27 86 PD Chisum 715 1245 764 810 1082 1234 3.31. 13 5714 761 Feb 15 76 PD Chisum 692 1226 646 696 970 1120 3.34. 14 2128 767 Feb 25 80 PD Ironstone 656 1218 658 726 948

52 Week Money Challenge (Dollars - biweekly) Sheet1.pdf ...
Page 1 of 1. 52 Week Money Challenge. lifeasyouliveit.blogspot.com 2013. Week Dates Amount Total Week Dates Amount Total. 1 & 2 Jan 1 - Jan 14 $3 $3 1 ...

AHC Biweekly Project Report.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. AHC Biweekly ...

Meeting 17: Biweekly GIAB SV Integration Call ... -
Apr 2, 2018 - Key Points. ○ Slides can be found ... Update: Proposed process for using assemblies to develop High Confidence BED Files. ○ Only 355 extra ...

Sector Update
Feb 15, 2018 - 30,000. 50,000. 70,000. 90,000 110,000 130,000. 2013. 2014. 2015. 2016. 2017. 2018E. ADEX Trend. TV. Radio. Newspaper. Magazines.

Company Update
Aug 19, 2016 - Company Update | TKN. Krungsri Securities ... Income tax on company & subsidiaries. (56). (98). (175) ..... SOLAR SORKON. SPA. SPC. SPCG.

Sector Update
Aug 25, 2017 - Mail [email protected]. ID 004927. ID. 039916. Sector:______. SET :----------. Sector Update. AUTOMOTIVE NEUTRAL. Source: Company ...

Update History
Dolby Pro Logic IIz, DNLA 1.5, Dolby Volume. Onkyo [179] ..... Bluetooth, DNLA, AirPlay, dts HD, Pro Logic IIz, remote apps for iOS and Android. Sony [469].

Company Update
Company Update. 29 Sep 2016. 1. Please see .... 59.1%. 27.5%. 24.2%. Source: Company data, AWS Research ..... SOLAR SORKON SPA. SPC. SPCG. SPPT.

Commodities Update
Feb 14, 2017 - Root (Domestic price) (Bt/ton). 1,750. -. 1,750. 3.1 ..... Tapioca root (domestic price) (monthly basis). Tapioca Starch ..... Renewable Energy.

Sector Update
Aug 23, 2017 - Asian city resort Building 2nd Floor 1468/126-128. Karnchanavanit Rd. Hat yai, Amphoe Hat. YaiSongkhla90110. Tel. (074)559-200, (074)559- ...

Sector Update
Feb 22, 2018 - Mail [email protected]. ID 004927. ID. 039916. Sector:______. SET :----------. Sector Update. AUTOMOTIVE NEUTRAL. Market. Rating.

Company Update
Jul 26, 2016 - KCE TB. KCE ELECTRONICS PUB CO LTD. 1,534 17.4 14.4 5.2 4.2 ... HANA TB HANA MICROELECTRONICS PCL ..... Mid - Small cap, MAI.

Company Update
Aug 4, 2017 - Food, Transportation, Strategy. 662-659-7000 ext. 5009 [email protected]. วรพงศ์ ตันติวุฒิพงศ์. Electronic, Automotive ...