COLORADO PASSENGER TRAMWAY SAFETY BOARD

21.1.2 Major tramway modification. "Major Tramway Modification" means any modification to a passenger tramway which alters its verified design or verified construction and which results in a substantive change: (a) in design speed of the system; or (b) in capacity by changing the number of carriers, spacing of carriers, or load capacity of carriers; or (c) in the path of the rope; or (d) in the type of brakes and/or backstops or components thereof; or (e) in structural arrangements; or (f) in power or type of prime mover or auxiliary engine; or (g) to control system logic. Design and construction verifications are required. A major tramway modification may be deemed a new installation by the Board and current requirements shall be applicable (reference rule 1.2.4.3).

CLARIFICATION OF MAJOR MODIFICATIONS A major modification is defined as a significant change to the tramway's certified design or certified construction and materially affects the tramway's integrity, operation or control (see rule 21.1.2). The following list is intended to provide guidance in determining those changes to the tramway that are properly classified as major modifications, however, this list is not all inclusive and it must be recognized that the circumstances pertaining to a particular modification may justify reclassification to another category. Therefore, it is the responsibility of the area operator to exercise sound judgment and to consult the Board if further clarification is needed. All Major Modifications require an acceptance test (see rule 21.3.7) and shall be completed prior to public operation of the passenger tramway. A CPTSB Inspector shall be present during each acceptance test (see rule 22.5.1). All Major Modifications are required to meet the current CPTSB and ANSI Standards. a) A change in the design speed of the system. 1. Any increase beyond certified design. Note: A decrease is not a major modification. b) A change in design capacity by changing the number of carriers, spacing of carriers, or load capacity of carriers. 1. Carriers may be added or removed to accommodate normal rope stretch or relocation in rope splice area. Note: If this is done within the certified design parameters, it is not a modification.

2. Increasing load capacity is interpreted to mean changing the number of passengers (i.e. double chair to triple chair). Note: A change in carrier spacing which results from normal operation (i.e. grip slippage) is not a modification. c) A change in the path of the rope. 1. Adding or removing midway load/unload terminal. 2. Moving a tower. 3. Change in tower height or number of towers. 4. Change in line gauge. 5. Moving a terminal is at a minimum a major modification and may be considered a relocation of the lift upon Board review. d) A change in the type of brakes and/or backstops or components thereof. 1. A change to the application mechanism, defined as the energy used to set brake (i.e. weights to springs, springs to hydraulics, or different types of weights, springs or hydraulics, etc.). Note: If the specifications of the component are equivalent, then it is treated as a one for one replacement and not a major modification. e) A change in structural arrangements. 1. A change to the cross arm (i.e. removing angle brace and making it self supporting). 2. Tower. 3. Terminal support. f) A change in power transmission equipment or type of prime mover or auxiliary engine. 1. An increase or decrease in the horsepower of an electric motor or internal combustion engine. 2. Changing an AC to DC or vice versa, etc. 3. Changing an internal combustion engine to electric or vice versa. 4. A change to the arrangement of the following power transmission equipment - gearbox, fluid coupling, torque converter, V-Belt drive, pulleys, U-joints, shaft couplings (i.e. fluid coupling to torque converter, V-Belt to gear box, etc.). Note: A change in electric motor or internal combustion engine with equivalent specifications is treated as a one for one replacement and not a major modification. g) A change in critical components as outlined in rule 1.4.

1. A change in specifications of the critical components. 2. A change from center pole to bail chairs. 3. A change in grip models or manufacturers. 4. Adding chair bubbles, change in type of carrier (i.e. quad chair to gondola). h) Substantive change to the control system logic. Note: For Fixed Grip Tramways: Replacement of the low voltage control system will require the addition of Accel/Decel Monitoring, Overspeed Detection and Functional Redundancy in the new system. 1. Replacement of the control system. 2. Changing from relay logic to digital. 3. Multiple component changes within system controls. i) Any change to the motor controller drive system. Note: For Fixed Grip Tramways: Replacement of the motor controller drive system will require the addition of Accel/Decel Monitoring, Overspeed Detection and Functional Redundancy of the modification. 1. Any change to or upgrade in a motor controller drive system. 2. Note: Replacing a motor controller or drive system for a conveyor or tow shall be considered a Minor Modification and shall require the completion of an acceptance test.

Major Modification Definitions.pdf

Page 1 of 3. COLORADO PASSENGER TRAMWAY SAFETY BOARD. 21.1.2 Major tramway modification. "Major Tramway Modification" means any modification ...

20KB Sizes 0 Downloads 291 Views

Recommend Documents

Harley engine modification. - MotoParts
Twin Cam Engines from Harley-Davidson have a good design and some nice ..... Any camshaft with with a duration under 250 degrees and lifts below .500 can ...

Harley engine modification. - MotoParts
Performance and Technical information on modifying engines for Harley-Davidson motorcycles. Looking for high performance engine specifications for your ...

unit 11 behaviour modification - eGyanKosh
Unfortunately, the history of labour-management relations has rarely highlighted the congruent interests or ..... observable environmental events and the reinforcement history of the individual. There is no need for the ..... AT&T, General Motors, B.

Diet Modification Form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Diet Modification ...

behavior modification pdf
Page 1 of 1. behavior modification pdf. behavior modification pdf. Open. Extract. Open with. Sign In. Main menu. Displaying behavior modification pdf.

Minor Modification Definitions.pdf
Minor Modification Definitions.pdf. Minor Modification Definitions.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Minor Modification Definitions.pdf ...

pdf-1467\major-problems-in-american-environmental-history-major ...
Try one of the apps below to open or edit this item. pdf-1467\major-problems-in-american-environmental-history-major-problems-in-american-history.pdf.

Major Cineplex Group
Nov 13, 2017 - Pre-tax Profit. 369. 411. (10.2). 691. (46.6). 1,374. 1,356. 1.3. Current taxation. (62) ..... coverage universe in the related market (e.g. Taiwan).

Undecided​ ​Major
Undecided​ ​Major ... By​​completing​​the​​activities​​in​​this​​online​​workbook​​you​​will​​have​​a​​written​​portfolio​​of​​your​​ ...

Major Events -
between business and sustainability among Penn students. The major elements of PISA's ... Commerce for Economic Development John. Fernandez, and ...

Geography - Llantwit Major School
Jun 13, 2012 - t Answer the questions in the spaces provided. – there may be more space than you need. Information t The total mark for this paper is 90. t The marks for each question are shown in brackets. – use this as a guide as to how much ti

Major Cineplex Group
Jul 26, 2017 - 1,015. 753. 1,200. 1,410. Net Profit (Btmn). 1,086. 1,171. 1,188. 1,313. 1,490. Normalized Profit (Btmn). 1,000. 981. 887. 1,137. 1,314. EPS (Bt).

Major Cineplex Group - SETTRADE.COM
Resume Coverage | MAJOR. Krungsri Securities Research. 2. 25 2560. Thailand's cinema ADEX ... Source: Company data, www.boxofficemojo.com and Krungsri Securities. Source: Company data ..... Renewable Energy. 662-659-7000 ext.

Major Cineplex - RHB Securities
May 23, 2016 - Relative to Stock Exchange of Thailand Index (RHS). 2. 4. 6. 8. 10. 12. 14 ..... Figure 11: Major Cineplex's guest count and average ticket prices.

Major Cineplex - RHB Securities
May 23, 2016 - มำส 3/16 บริษัทมีแผนเปิดด ำเนินงำนโรงภำพยนตร์ทั้งสิ้น 687 แห่งทั่วประเทศในช่วง. ปลำยปีนà¸

Chameleon Social Software Modification Services ...
*229#Download: 'Chameleon Social Software Modification Services: 100USD' by. ABK-Soft LTD. ... Social Software. Modification Services: 100USD discount being introduced they would list them. ... Create your social network ... Chameleon ...