Kimball modernization project update – 7/14/2017 Prepared on: July 14, 2017 Location: 3375 Minnesota Ave SE Ward: 7 Overall Project Budget: $51M Design Builder/Architects: MCN Build/hord|copland|macht Project Manager(s): Jamil Hamilton Project Status: Planning Construction Start Date: Fall 2017 Project Completion Date: Summer 2019 General Project Updates • The current building sits on a hill consisting of four wings—all of which sit at different elevations along the hill. In addition to the building’s facilities being outdated and classrooms lacking the proper square footage, much of the building is not ADA (Americans with Disabilities Act) accessible due to lack of ramps, lifts, and elevators. • We have already conducted a priced concept drawing of a new school, to see if it was possible to modernize with the current $17M budget. The results of the study proved that we needed $34M more to do the work. Currently DGS’s (DC Department of General Services) contracts and procurement office is taking longer than originally anticipated to award the job to the architect and contractor team (design-build team). Project Status • Work Scheduled From 6/30/2017 to 7/14/2017 o HCM Architects schedule a date to review proposed concept design with Kimball leadership and SIT for feedback and tweaks o Setting up meetings with regulatory agencies Commission of Fine Arts (CFA), Historic Preservation Review Board (HBRP), the Department of Parks & Recreation, and the Board of Zoning Adjustment (BZA) • Work Scheduled From 7/14/2017 to 7/28/2017 o Continued refinement of schematic design o Site Walkthrough at Kimball—to verify the labeling on the classroom furniture o Site Walkthrough at Davis–to verify the proposed move locations o Identify Kimball Staff to be onsite on moving days to assist the efficient completion of the move. Davis Swing Space Update Elevator: - CMU shaft wall – 100% - Waterproofing – 80% to be completed tomorrow - Backfill after waterproofing - Face brick scheduled to start today and be completed by or before July 15th - Install roof – after face brick complete

Kimball modernization project update – 7/14/2017 -

Elevator scheduled for delivery July 14th Elevator completed by or before August 28th – pushing for an early completion

Connector: - Demo windows and existing roof – 80% - Install structural steel (steel on site) – 15% - Complete connector – 7/29/2017 Playground: - Estimated delivery and mobilization date – August 1st - Demo existing playground equipment – 100% - Installation of playground and play surface – 3 to 4 weeks - by or before August 29th Kitchen: - Rough-in plumbing – 80% - Concrete patching – 80% - Rough-in framing – 90% - Rough-in electrical power – 30% - Demo opening for duct work – 100% - Duct work for fan and MAU 90% - Kitchen hood to be shipped – week of July 10th - Install kitchen hood - upon arrival - Install kitchen fan and MAU after installation of kitchen hood - Installation of new perimeter/egress door – July 19th - Hang & Finish GWB – 90% - Install kitchen flooring – by or before July 14nd - Install kitchen equipment – by or before July 16th - Deep clean kitchen equipment – after installation - Assemble / Install walk-in coolers – started today - Coordinate health inspection – starting July 21st - Kitchen turn-over – by or before July 29th.

Community Outreach Update • Next SIT - choosing a date between July 20, 21, 24, and 25 for an evening SIT Meeting Project Contacts • Toussaint Webster – DCPS Coordinator of Facility Planning & Design (SIT Coordinator)

Kimball modernization project update – 7/14/2017 Swing Space Progress Photos

Final coat and touch-ups of hallway paint

Kimball modernization project update – 7/14/2017 Entrance restrooms removed, making space of security office and welcome desk

Kimball modernization project update – 7/14/2017 Floor tile installation on first floor

Opening for link between two building wings

Steel reinforcement beams to compensate for 2011 earthquake damage

Kimball Biweekly Update 7.14.17.pdf

Jul 14, 2017 - We have already conducted a priced concept drawing of a new school, to see if it was. possible to modernize with the current $17M budget. The results of the study proved. that we needed $34M more to do the work. Currently DGS's (DC Department of General. Services) contracts and procurement office is ...

708KB Sizes 0 Downloads 164 Views

Recommend Documents

Kimball Biweekly Update 7.14.17.pdf
Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Project Status: Planning. Construction Start Date: Fall 2017.

Kimball Biweekly Update 2.2.18.pdf
Page 1 of 1. Kimball Modernization Project Update. Prepared on: February 2, 2018. Location: 3375 Minnesota Ave SE. Ward: 7. Overall Project Budget: $51M. Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Pro

Kimball Biweekly Update 1.19.18.pdf
Jan 19, 2018 - o Planning to release mechanical, electrical, plumbing, sprinkler, utilities,. earthwork, deep foundations, concrete & steel subcontracts following the final. GMP. o Awaiting from pricing from MCN on redesign of southern façade, libra

Kimball Biweekly Update 6.2.17.pdf
Design Builder/Architects: MCN Build/hord|copland|macht. Project Manager(s): Jamil Hamilton. Project Status: Planning. Construction Start Date: Fall 2017.

Orr Biweekly Update 7.14.17.pdf
Orr Biweekly Update 7.14.17.pdf. Orr Biweekly Update 7.14.17.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Orr Biweekly Update 7.14.17.pdf.

West Biweekly Update 120617.pdf
11/28. • Next steps from December 11 to December 22. o DCPS will continue to work with school leadership and the DCPS. Community Actiion Team to finalize SIT members. o DC Department of General Services aims to select a design firm for. the feasibi

52 Week Money Challenge (Dollars - biweekly) Sheet1.pdf ...
Page 1 of 1. 52 Week Money Challenge. lifeasyouliveit.blogspot.com 2013. Week Dates Amount Total Week Dates Amount Total. 1 & 2 Jan 1 - Jan 14 $3 $3 1 ...

AHC Biweekly Project Report.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. AHC Biweekly ...

Meeting 17: Biweekly GIAB SV Integration Call ... -
Apr 2, 2018 - Key Points. ○ Slides can be found ... Update: Proposed process for using assemblies to develop High Confidence BED Files. ○ Only 355 extra ...

Sector Update
Feb 15, 2018 - 30,000. 50,000. 70,000. 90,000 110,000 130,000. 2013. 2014. 2015. 2016. 2017. 2018E. ADEX Trend. TV. Radio. Newspaper. Magazines.

Company Update
Aug 19, 2016 - Company Update | TKN. Krungsri Securities ... Income tax on company & subsidiaries. (56). (98). (175) ..... SOLAR SORKON. SPA. SPC. SPCG.

Sector Update
Aug 25, 2017 - Mail [email protected]. ID 004927. ID. 039916. Sector:______. SET :----------. Sector Update. AUTOMOTIVE NEUTRAL. Source: Company ...

Update History
Dolby Pro Logic IIz, DNLA 1.5, Dolby Volume. Onkyo [179] ..... Bluetooth, DNLA, AirPlay, dts HD, Pro Logic IIz, remote apps for iOS and Android. Sony [469].

Company Update
Company Update. 29 Sep 2016. 1. Please see .... 59.1%. 27.5%. 24.2%. Source: Company data, AWS Research ..... SOLAR SORKON SPA. SPC. SPCG. SPPT.

Commodities Update
Feb 14, 2017 - Root (Domestic price) (Bt/ton). 1,750. -. 1,750. 3.1 ..... Tapioca root (domestic price) (monthly basis). Tapioca Starch ..... Renewable Energy.

Sector Update
Aug 23, 2017 - Asian city resort Building 2nd Floor 1468/126-128. Karnchanavanit Rd. Hat yai, Amphoe Hat. YaiSongkhla90110. Tel. (074)559-200, (074)559- ...

Sector Update
Feb 22, 2018 - Mail [email protected]. ID 004927. ID. 039916. Sector:______. SET :----------. Sector Update. AUTOMOTIVE NEUTRAL. Market. Rating.

Company Update
Jul 26, 2016 - KCE TB. KCE ELECTRONICS PUB CO LTD. 1,534 17.4 14.4 5.2 4.2 ... HANA TB HANA MICROELECTRONICS PCL ..... Mid - Small cap, MAI.

Company Update
Aug 4, 2017 - Food, Transportation, Strategy. 662-659-7000 ext. 5009 [email protected]. วรพงศ์ ตันติวุฒิพงศ์. Electronic, Automotive ...

Company Update
Jun 28, 2016 - Source: Company data, Krungsri Securities. P/E Band .... Income tax on company & subsidiaries. (7,562) ..... SOLAR SORKON. SPA. SPC.

Company Update
Aug 11, 2016 - Source: Company data, Bloomberg, Krungsri Securities ... Income tax on company & subsidiaries. (2,270). (3,066) .... SOLAR SORKON. SPA.

Company Update
Jun 3, 2016 - 8.1. Source: Company data, Bloomberg, Krungsri Securities ... Income tax on company & subsidiaries. (50) ..... Internet Trading: 0-2659-7777.

Company Update
Aug 15, 2016 - Source: Bloomberg, Company data, Krungsri Securities. Source: Bloomberg, Company .... SOLAR SORKON. SPA. SPC. SPCG. SPPT. SPVI.