Kimball Modernization Project Update Prepared on: February 2, 2018 Location: 3375 Minnesota Ave SE Ward: 7 Overall Project Budget: $51M Design Builder/Architects: MCN Build/hord|copland|macht Project Manager(s): Jamil Hamilton Project Status: Planning Construction Start Date: Fall 2017 Project Completion Date: Summer 2019 General Project Updates • The current building sits on a hill consisting of four wings—all of which sit at different elevations along the hill. In addition to the building’s facilities being outdated and classrooms lacking the proper square footage, much of the building is not ADA (Americans with Disabilities Act) accessible due to lack of ramps, lifts, and elevators. • We have already conducted a priced concept drawing of a new school, to see if it was possible to modernize with the current $17M budget. The results of the study proved that we needed $34M more to do the work. • Since the feasibility study, DCPS/DGS has awarded the design-build contract to HCM Architects and MCN build Project Status • Work Scheduled From 1/20/2018 to 2/2/2018 o Demolition permit received—ready to proceed o Erosion and sediment controls installed • Work Scheduled From 2/2/2018 to 2/16/2018 o DCPS/DGS will share updated southern façade with Kimball leadership and the community o Mobilizing heavy equipment o Demolition of 3 of the 4 building wings Davis Swing Space Update • Building is complete with exception of summer 2018 work Community Outreach Update • Next SIT Meeting – February 13, 2018 Project Contacts • Toussaint Webster – DCPS Coordinator of Facility Planning & Design (SIT Coordinator)
Jan 19, 2018 - o Planning to release mechanical, electrical, plumbing, sprinkler, utilities,. earthwork, deep foundations, concrete & steel subcontracts following the final. GMP. o Awaiting from pricing from MCN on redesign of southern façade, libra
Jul 14, 2017 - We have already conducted a priced concept drawing of a new school, to see if it was. possible to modernize with the current $17M budget. The results of the study proved. that we needed $34M more to do the work. Currently DGS's (DC Dep
11/28. ⢠Next steps from December 11 to December 22. o DCPS will continue to work with school leadership and the DCPS. Community Actiion Team to finalize SIT members. o DC Department of General Services aims to select a design firm for. the feasibi
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. AHC Biweekly ...
Apr 2, 2018 - Key Points. â Slides can be found ... Update: Proposed process for using assemblies to develop High Confidence BED Files. â Only 355 extra ...
Aug 19, 2016 - Company Update | TKN. Krungsri Securities ... Income tax on company & subsidiaries. (56). (98). (175) ..... SOLAR SORKON. SPA. SPC. SPCG.
Aug 23, 2017 - Asian city resort Building 2nd Floor 1468/126-128. Karnchanavanit Rd. Hat yai, Amphoe Hat. YaiSongkhla90110. Tel. (074)559-200, (074)559- ...
Jun 3, 2016 - 8.1. Source: Company data, Bloomberg, Krungsri Securities ... Income tax on company & subsidiaries. (50) ..... Internet Trading: 0-2659-7777.