Rule Drawbridge Operation Regulation; Chambers Creek, Steilacoom, WA A Rule by the Coast Guard on 12/19/2013 Add to clipboard
ACTION
Notice Of Deviation From Drawbridge Regulation.
Previous Article Next Article LEGAL DISCLAIMER
SUMMARY The Coast Guard has issued a temporary deviation from the
Font Controls
operating schedule that governs the Burlington Northern Santa Fe (BNSF) Chambers Creek Railway Bridge across Chambers Creek, mile 0.0, at Steilacoom, WA. The deviation is necessary to allow BNSF to perform maintenance and upgrade items to this vertical lift bridge in support of Positive Train Control requirements per the Rail Safety Improvement Act of
PDF
DEV
PRINT PUBLIC INSPECTION Publication Date:
2008. This will require locking the bridge in the closed
Thursday, December 19, 2013
position and locking out the power to the drive system while
Agencies:
the work is conducted. This deviation allows the bridge to
Coast Guard
remain in the closed position for 45 days during the
Department of Homeland
maintenance and upgrade work.
Security Dates: This deviation is effective
from 8 a.m. on January 6,
2014 to 5 p.m. on February
TABLE OF CONTENTS Back to Top
DATES: ADDRESSES: FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION:
19, 2014. Effective Date: 01/06/2014 Entry Type: Rule Action: Notice of deviation from drawbridge regulation.
DATES: Back to Top
This deviation is effective from 8 a.m. on January 6, 2014 to 5
Document Citation:
p.m. on February 19, 2014.
78 FR 76750 Page: 76750 -76751 (2 pages)
ADDRESSES: Back to Top
The docket for this deviation, [USCG-2013-0990], is available
CFR:
at http://www.regulations.gov. Type the docket number in
33 CFR 117
the “SEARCH” box and click “SEARCH.” Click on Open
Agency/Docket Number:
Docket Folder on the line associated with this deviation. You
Docket No. USCG-2013-0990
may also visit the Docket Management Facility in Room W12-
Document Number:
140 on the ground floor of the Department of Transportation
2013-30219
West Building, 1200 New Jersey Avenue SE., Washington, DC
Shorter URL:
20590, between 9 a.m. and 5 p.m., Monday through Friday,
https://federalregister.gov/a/2013-
except Federal holidays.
FOR FURTHER
If you have questions on this temporary deviation, call or
INFORMATION
email Steven Fischer, Thirteenth District Bridge Program
CONTACT: Back to Top
Administrator, Coast Guard; telephone 206-220-7282, Steven.
Regulations.gov Docket Info Docket Number USCG-2013-0990
[email protected]. If you have questions on viewing the
Docket Name
docket, call Barbara Hairston, Program Manager, Docket
Safety Zone
Operations, telephone 202-366-9826.
SUPPLEMENTAR
30219
Burlington Northern Santa Fe (BNSF) will be performing lift
Y INFORMATION: Back to Top
bridge maintenance and upgrades for the BNSF Chambers Creek Railway Bridge across Chambers Creek, mile 0.0, near Steilacoom, WA. The
bridge provides 50 feet of vertical
clearance in the raised position, 10 feet of vertical clearance in the closed position and 80 feet of horizontal clearance. Reference plan is mean high water elevation of 12.2 feet. The normal operation schedule falls under 33 CFR § 117.5 which states “Except as otherwise authorized or required by this part, drawbridges must open promptly and fully for the passage of vessels when a request or signal to open is given in accordance with this subpart.” This deviation period is effective from 8 a.m. on January 6, 2014 to 5 p.m. on February 19, 2014. The deviation is necessary for BNSF to perform maintenance and upgrade items to this vertical lift bridge including replacement of a link pin bearing in the lift system, replacing lower racks for the counterweight and conducting signal system upgrades in support of Positive Train Control requirements per the Rail Safety Improvement Act of 2008. This will require locking the bridge in the closed position and locking out the power to the drive system while the work is conducted. Vessels able to pass through the bridge in the closed positions may do so at anytime. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must
return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: December 9, 2013. Steven M. Fischer, Thirteenth Coast Guard District, Bridge Administrator. [FR Doc. 2013-30219 Filed 12-18-13; 8:45 am] BILLING CODE 9110-04-P
HOME Home
SECTIONS
BROWSE
SEARCH
Money
Agencies
Article Search
Environment
Topics
Advanced Article Search
World
Dates
Events Search
Science & Technology
Public Inspection
Unified Agenda Search
Business & Industry
Executive Orders
Public Inspection Search
Health & Public Welfare
POLICY
LEARN
About Us
User Information
Legal Status
About Public Inspection
Contact Us
Document Drafting & Research
Privacy Accessibility FOIA No Fear Act Continuity Information
Related Resources Tutorials, History, and Statistics Regulatory Journals
BLOG Blog
MY FR My Clipboard Sign In
Regulatory Improvement Developers