Billerica Public Schools Fall 2017 Town Meeting
ARTICLE 15
Introduction: Recent Projects Completed Before: June 12, 2017
Alumni Field: Before & After Aerials (credit IT Dept.)
Funding Source: Operating
After: Aug 30, 2017
Before: June 12, 2017
Marshall Field: June 12, 2017
Marshall Field: Before & After Aerials (credit IT Dept.)
Funding Source: Operating Budget
Marshall Field: August 30, 2017
Before:
Marshall: Sidewalk Paving
Locke
Funding Source: Town Meeting
Marshall
After:
Locke: Exterior Panel Repair/Rehab and Brick Power Wash Funding Source: Town Meeting
Before:
After:
Before:
After:
After: Energy efficient LED’s National Grid: $2,500 reimb.
Before: major water damage and discontinued tiles
Kennedy: Ceiling & Light Replacement Funding Source: Operating
Before:
After:
Before:
After:
Marshall Flooring: Asbestos Abatement & replacement
Funding Source: Town Meeting
Curbing and rail replacement
Ditson Bridge: Replaced sidewalk curbing and railing
Funding Source: Town Meeting
Curbing and rail replacement
Hajjar drop off and teacher lotBefore & After
Marshall: Fitness Room Flooring Funding Source: Operating
Hajjar: Student drop-off and teacher parking lot repaving Funding Source: Town Meeting
Marshall Fitness Room flooring
Marshall Carpet (5 classrooms)
Carpeting:
Locke & Marshall
Funding Source: Town Meeting
Locke Carpet (main office)
MFSAB Tractor: 2017Kubota L6060
New Multifunctional School Utility Vehicle
Kubota Tractor: with several attachments (snow removal, bucket, mower) Funding Source: Operating
Hajjar Library: Hardwood bookcases built and installed and room repainted by in-house maintenance staff Funding Source: Operating
Projects Earmarked from Fall 2016 Town Meeting
School
Project
Status
Ditson
Bridge sidewalk & handrail Repl. Completed
Marshall
Sidewalk replacement
Locke
Window panel and door repair & Completed paint
Marshall
Asbestos abatement and tile replacement
Completed
Hajjar
Parking lot replacement
Completed
Grounds
Infield Groomer
Completed
Completed
Other Town Meeting Projects should funds be available: Dutile
Ceilings/Lights
Completed
PA system renovation
Completed
Project not shown:
Marshall/Hajjar
School Department Proposals
ARTICLE 15
Proposed FY 18 Capital Projects
School
Project
Cost
Kennedy
Supply and install new 2nd floor hallway ceilings & new LED lighting (phase 3 of 3)
$63,000
Kennedy
Asbestos abatement of VCT flooring in Café and replace with new VCT
$50,000
Dutile/Kennedy
Playground structure improvements
$96,000
Locke
Asbestos abatement of VCT flooring in Café and foyer hall and replace with new VCT
$97,000
Locke
Repave bus loop
$40,000
Marshall
Article 15
Marshall
$71,000 Asbestos abatement of VCT in Café and replace w/ VCT Asbestos abatement of VCT in N wing and replace $169,000 w/rubber (phase 3 of 4) Asbestos abatement of VCT in S wing and replace w/rubber $210,000 (phase 4 of 4) $51,000 Partial Locker replacement *
Ditson
Bridge paving (phase 3 of 3)
$59,000
Multi school
Carpet replacement
$45,000
Multi school
Café Table replacement
$19,000
Multi school
Ceiling panel coating
$30,000
TOTAL
$1,000,000
Marshall Marshall
2nd floor ceiling & lighting replacement
Kennedy Café Floor
Kennedy: Ceilings/Lighting: (phase 3 of 3) Café Flooring Replacement of T8 lighting qualifies for Nat Grid reimbursement See slide 6 for phase 2
Asbestos abatement of VCT, replacing w VCT
Dutile playground
Dutile/Kennedy:
Playground structure replacement and improvements
Café Floor
Locke: Asbestos abatement of VCT flooring and replacement w/ VCT in Café and main foyer hall
Repave bus loop
Bus Loop
Marshall layout with proposed flooring and locker replacement
Marshall:
Marshall abatement and flooring
Marshall Café floor abatement and flooring
Asbestos abatement of VCT in Café and replace w/ VCT
Asbestos abatement of VCT in N –Wing and S – Wing and replace with rubber resilient flooring Phases 3 and 4 of 4 Asbestos tile popping See slide 7 for phase 2
Asbestos tile crack
Marshall: Locker replacement
Ditson: Bridge paving (phase 3 of 3)
Locker replacement
Ditson bridge (road portion)
Multi School
Carpet Replacement Ex: Marshall Library
Ex: Hajjar Classroom
Café tables Ex: Marshall cafe table
Water damaged tiles
Multi School:
Café Tables Ceiling Panel Coating Ex: Marshall Admin Hall Note: HS tables new this year, Locke to receive ALL new café tables Fall ‘19.