Engineering Department Construction Project Status as of July 8, 2016 Road Task Name Flood - Big Thompson US 34 Bridges Reconstruction of CR 11C roadway

Area US 34 btwn Loveland & Estes Park from Boise to CR 28 (57th St)

CR 18 BR18-0.4-23E RAMP Hwy 14 & SH 14 Greenfields BR 3-0.2-50 CR 3 replacement CR 17 - CR 16 to Hwy CR 17 287 Reconst

Loveland

CR 70 Reconstuct Intersection improvements and CR 28 signal Trail Front Range Trail Carter Carter Lake Lake Improvements Lvld to FtC Trail Trail Longview Trail CR CR 68/CR 9 Intersect 68/CR9 Imp CR 3

CR3 2016 Overlay Project CR 15 2016 Overlay Project Flood - CR 15 Bridge CR 15 replacement CR 29, 22H, Flood - CR 29 & 22H & 31D 31D

Fort Collins Northeast Fort Collins Berthoud/Loveland Owl Canyon between CR15 & CR 19

Loveland

SH 392 to Boyd Lake

Description Permanent repairs to bridges Reconstruction of Roadway including spillway Replace box culvert on CR 18 west of Loveland

North Wellington area Hwy392 to CR 30 Various South Loveland

Construct Fall 2016 Open house July 20th, construction start in 2017

Grant

Project # 0

$2,700,000

305

$250,000

312

Realign frontage roads On CR 3 north of CR 50 over Larimer County Design 2016, construct 2017 Canal

$2,100,000

$1,680,000

314

$800,000

$640,000

315

Widen to 3 lane section with 6' shoulders

Design 2016 & Construct 2018

$5,000,000

$2,865,000

317

Reconstruction of chip seal road

Preliminary design 2016

$5,000,000

322

CR 28/ CR 13E (57th St / Monroe)

Final design, construct 2016

$350,000

323

Connect Front Range Trail between FC & Lvld

In design, build 2017

$1,021,701

In Design

$1,000,000

Carter Lake South Shore Campground improvement CR 17 (Shields/Taft)

Status Waiting on CDOT plans for US 34 In design, construct 2016 & 2017

Total Estimated Cost

Connect Longview Trail between FC & Lvld Design 2016. Construct 2017 Drainage improvements at intersection, storm sewer pipe drainage & gravel road improvements Annual overlay program Widen & Overlay - CR 14 to CR 16 Permanent repair - replace bridge over Little Thompson

South of Berthoud East of Dam Store, mouth of canyon near Sylvan Repair flood damaged sections Dale Ranch Redstone Canyon north of Replace damaged culverts in Red Stone CR 25E Flood - CR 25 E culverts Masonville Canyon & repair landslide area

In design, build in 2016 In design, construct 2016 & 2017. Construction starts August Construction starts August

$5,200,864

$800,000

5000 5022

$1,999,550

$230,850

5030 8034

$350,000 $3,000,000 part of overlay program

8316 9069 9069

In preliminary design

$4,205,000

$3,700,400

9310

In construction Construct in 2016 & 2017. Open House July 21st

$7,460,055

$6,564,848

9319

$1,277,500

$1,124,200

9321

Road Task Name CR 44H Flood - CR 44H

Area Description Upper Buckhorn Canyon, south of Stove Prairie Reconstruct 10.5 miles

CR 47 Flood - CR 47 US 36 to Big Elk Meadows Flood - Fish Creek Fish www.fishcreekcorridor Creek repair.com Estes Park Flood - CR 43 CFL CR 43 www.lcr43.com Glen Haven West Flood - West Creek Glen Haven Creek Structures

Reconstruct 2.5 miles

Lions Park Bank restoration

Bank restoration & armorment due to damage Roadway reconstruction & drainage improvements

Smithfield PID

Town of LaPorte Southwest corner I25/Mulberry

Estes Park - Utility and road repair CFL rebuilding roadway through design/build process Replace 3 structures on West Creek

Status Design is underway. Construction in 2017 & 2018 Design is underway. Construction in 2017 & 2018

Total Estimated Cost

Grant

Project #

$25,000,000

$22,000,000

9330

$9,871,000

$8,686,480

9332

$9,875,000

$8,690,000

9339

$38,000,000

$38,000,000

9386

Construction starts August In construction. 2 phases phase 1 complete phase 2 is planting & trail start in August. Parking lot is open

$2,670,000

$2,349,600

9429

$450,000

$393,750

9432

Design 2016 & Construct 2017

$2,200,000

Road construction starts 2016 & continue into 2017. Ribbon cutting 7/14/16

8500

Engineering Department Construction Project Status ... -

Jul 8, 2016 - In design, build 2017. $1,021,701. $800,000. 5000 ... In design, build in 2016. $230,850. 8034 ... East of Dam Store, mouth of canyon near ...

108KB Sizes 0 Downloads 206 Views

Recommend Documents

Unique Engineering and Construction - Settrade
Oct 30, 2017 - ก ำไร 3Q60 ยังเติบโตรำยไตรมำสแม้ปรับประเภทงำน. เราคาด UNIQ จะมีก าไรสุทธิ 230 ล้านบาท ลดลง 14% YoY

Unique Engineering and Construction - Settrade
Nov 14, 2017 - ... Building Central Ladprao. 11th Floor, Room 1101, Phaholyothin Road,. Chatuchak, Bangkok 10900. Tel. 0-2120-3700 Fax. 0-2541-1505 ...

Department Knowledge Engineering
concerning information security and KM, and how a flexible mechanism that allows transparent ... security policies and different security restrictions to knowledge assets. .... available resources, while they have to preserve the basic attributes of 

Mechanical Engineering Department -
Seeks Assistant/Associate/Full Professors. The Department of Mechanical Engineering at Abdullah Gul University (AGU) invites applications for multiple open ...

PDF Online Construction Project Management
PDF online, PDF new Construction Project Management: A Complete .... the best bid -- Why different types of construction contracts carry different levels of risk ...