PROCEEDINGS OF THE EXECUTIVE ENG]NEER, ANDHRA PRADESH SARVA SHIKSHA ABHIYAN, PRAKASAN4 DISTRICT. Present:Sri K. Venkateswara Rao., Rc.No.400/Sr.Acc/AP Sarva Shiksha Abhivan /2014,Dt,23-06-2014.

Sub:- Andhra Pradesh, Sarva Shiksha Abhlyan Prakasam District - Distribuiion of work among DY. EEs and Site Engineers -Orders Issued- Regarding. Ref:- 1.

No.65/RVM (SSA)/CWs/Prakasa m/2014- 15 of the State Project Director, AP SSA, Hyderabad.

Rc.

Dt.14-05-2014.

2. Rc. No.65/RVM (SSA)/CWS/Prakasam / 20 14- 75 of the State Project Dlrector, AP SSA, Hyderabad. Dt.26-05-2014 3. Report of Dy. EEs on feasibility of ACRS 2014-15. 4. Teleconference of State Project Director, Sarva Shiksha Abhiyan, Andh ra Pradesh. Dt.20-O6-2074.

ORDERS:-

In the reference 1't & 2"d cited the State Project Director'Andhra Pradesh, Sarva Shiksha Abhiyan, Hyderabad accorded admtnistratlve sanction for 882 ACRS. But as per the reports submitted by thd Dy. EEs, tt is found that 505 ACRS only are feasible for immediate grounding, Vide reference 3'd cited. The State Project Director Andhra Pradesh, Sarva Shiksha Abhiyan, Hyderabad through their Teleconference Dt.20-06-2011 ordered to complete these ACRS within 100 Days. Hence according

to the action plan, the ACRs works are

distributed among Dy. EEs and Site Engineers as detailed below.

The purpose of this distribution is completion of these works within lOO Days as per the bar chart schedule.

Sl,no

Name of the Sub Division

No. of Site Engineers

No,

of ACRs

1

onoole Sub Division:-

Avera9e ACRS per Site Enqineer

63

1

Sk. Nazeeahamed 2 P. Vasubabu 3 Sk. AbduL Habeeb

21.00

10B

1. M. Ramesh Babu 2.IYS!l Venkateswara

21.60

Division:Sri P. Ravi

Rao

Prakasah M. Tech, Dy. Executive Engineer,

Chandra Sekhar Reddy 4.L.Venugopal Rao 5.K.Ashok Kumar

Sri P. Ravi

Re

Prakasah M. Tech. Dy. Executlve Engineer, Ongole and SN Padu Constituencies including Podili & KK lvlitla Mandals

2

Kandukur Sub

3.1. S

Kondepi and Kandukur Constituencies 3

Markapur Sub

123

Division:-

Sri M. Siva Krishna Reddy B.Tech Dy, Executive

4

Engineer Markapur, Y. Palem & Giddalur Constituencies Kanioiri Sub

Division:Sri PSRKNV Prasad B.Tech, Dy. Executive Engineer Kanigiri constituency and Darsi, Tallur & I\4undlamur mandals of the Darsi constituency

B5

l.T.tvlahesh Babu 2.D.Timmaiah 3, Sd, Muzeebullah 4. B. Siva Ramaiah 5.A. Suresh 6. B, Rambhupal Reddy

20.50

K. Koteswara Rao P.Vijayendra Rao G. Balakrishna G. Prakasam

21.25

1

2 3

Sri A. Suresh should taken up the ACRS entrusted by Dy.EE

Markapur,

in

Additional to the KGBV Works already entrusted in other Sub Divisions.

Sri P. Vijayendra rao should take up the ACRs entrusted by Dy. EE Kanigiri, in Additional to the KGBV works entrusted in other Sub Divisions.

Parchur Sub Divi!iion:-

B4

1.Ch lohn Wilson 2. M. Narasimha Rao 3.G. Venkata Rao 4. P. Vidya Sagar

21.00

42

1.Sk. Rajan Babu 2. P. Subba Rao

21.00

Sri Sk. lamshed Basha B.Tech

Dy. Executive Engineer,

Parchur, Lhrrala Constituencies and Donakonda, Kurichedu mandals of Darsi constituencv Addanki Sub

6

Divi$ionr-

Sri P, Vidya sagar Site Engineer is directed o take up the ACRs entrusted by Dy. EE Parchur, in addition to the other KGBV Works already entrusted in other sub Divisions.

Sri P, Venkateswaralu Dy. Executive Enoineer fFAC) All other Site Engineers will have to work under their Dy. Executive Engineer as usual. Major Repair works are entrusted to concerned Dy. EEs as per their jurisdiction. The Dy. Executive Engineers should distribute each work to their Site Engineer ranging from 18 to 25 ACRS to each Site Engineer, according to the Geographicai

conditions. The Dy. Executive Engineer & Site Engineers should strictly abid€ by

the bar chart schedule. Any deviation will be viewed serious y. Bar chart schedule:-

A. Already started works should be completed by 31-08-2014. 1. Allotment of each work to Site Engineer in the proforma kept in Email and

submission

of lead statements by 24-06-2014.

2,

lYeeting with School Management Committees and obtaining resolution 25-06-2014 &

26-0G2014

3. 4. 5. 6. 7.

Marking of Sites 27-06-2014 & 28-06-2014.

by by

Foundation level should be completed

05-07-2014.

Basement level should be completed

15-07-2014.

by Slab laid should be completed by B. Finishings should be completed by 9. Submission offinal bills by Lentil level should be completed

25-07-2074. 05- 08-2014. 15-09-2014. 30-09-2014,

Action to be taken on Non feasible AcRs:on 25-06-2014 & Meeting Tahasildars on No Site works for advance possession of sites 26-06-2014 on dismantling works I\4eeting Panchayat Raj officials for obtaining dismantling certificates 27 -06-2014 & 2B-06-2014

in District Office 30-06Submission of work wise detailed report on non feasible ACRS

20t4. ACRS should be Alternative proposals in place of not required ACRS, Submergible Villages masters & submitted on or before 30-06'2074 with the Signature of concerned Head MEOs.

-17 /

To

,5,"ffi1,#,) Abhiyan'

AP Sarva Shiksh

Q1u1,"P'uuu'u*

'7-

st"' tt

District AII the Site Engineer through concerned Dy EEs, AP Sarva Shiksh Abhiyan'Prakasam All the Dy. EEs AP Sarva Shiksh Abhiyan,Prakasam District' Copy to all the 14PDos in the District for favour of information Copy to all the IYEOs in the District for favour of persuasion' of information Copy submitted to the District Educational Officer Prakasam District for favour Copy submitted to the Project Officer Andhra Pradesh Sarva Shiksh Abhiyan' Prakasam District for favour of information Copy Submitted to the Collector & Chairman Andhra Pradesh Sarva Shiksh Abhiyan' Prakasam District for favour of kind information. for Copy Submitted to the State Proiect Director Andhra Pradesh Sarva Shiksh Abhiyan favour of kind information.

The purpose of this distribution is completion of these -

Jun 26, 2014 - of lead statements by 24-06-2014. 2, lYeeting with School Management Committees and obtaining resolution 25-06-2014 &. 26-0G2014. 3.

772KB Sizes 0 Downloads 131 Views

Recommend Documents

The purpose of this letter is to make an introduction ... -
MDI has a board of directors composed of elected representatives from five regions in the USA and two in Canada. These men are charged with oversight of the ...

The purpose of this lesson is to have each group teach ...
(Visual aid examples include: posters, videos, drawings, charts, models, handouts to pass out to the class, pictures, comic strips, graphs, diagrams etc.). 4. Person 2 must find a magazine, web or newspaper article about one part of their section. Th

DH_anesthesia_VERIFICATION OF COMPLETION OF TRAINING.pdf ...
Management Branch. Office of Licensing. Page 1 of 1. DH_anesthesia_VERIFICATION OF COMPLETION OF TRAINING.pdf. DH_anesthesia_VERIFICATION ...

CERTIFICATE OF COMPLETION OF ACGME_AOA Training.pdf ...
Coordinating Council of Medical Education of the Canadian Medical Association (CCME) and consisted of the. following rotations: List type and length of training ...

Certificate of Completion
May 10, 2015 - BUSN499 Senior Seminar in Business Administration on. 10th May ... Business Integration and Strategic Management .... Data Analysis Tools.

CERTIFICATE OF COMPLETION OF ACGME_AOA Training.pdf ...
There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. CERTIFICATE OF COMPLETION OF ACGME_AOA Training.pdf. CERTIFI

This is the Title of the Paper
mobility over continuous natural surfaces having rock densities of 5-to-10%, modest inclines .... Classic approaches to this problem make use of wheel mounted ...

This is a Test of the Powerpoint System
Immediate goal. > To build computer systems that can process text and speech more intelligently computer language language. Understanding. Generation ...

This is an amended complaint of the original - cloudfront.net
Aug 6, 2013 - Available data also suggest that individuals of South Asian descent make up a .... regulations. 35. Each year, Infosys seeks and secures numerous employment-based visas for. South Asian workers to work within the U.S., even if positions

Deed of Partnership This Deed of Partnership is ... - Chartered Club
Whereas the parties to this deed have been carrying on the business of . .... remuneration to other working partner or partners as the case may be. The partners ...

The History and Purpose of Trademarks
May 17, 2016 - wine bottles in a store, are provided; and (4) website designs. .... Before filing a patent application, keep your invention a secret, and execute an ...

Purpose of the Church
purpose when He said in Luke 19:10, “For the Son of Man came to seek and to save what was lost. ..... 3:10 By the grace God has given me, I laid a foundation as an expert builder, and someone ... structure on top of the foundation of Christ.

The History and Purpose of Trademarks
May 17, 2016 - vices, such as restaurant services or the arrangement of displaying wine bottles in a store, are provided; and (4) website designs.

Purpose of Life.pdf
Page 2 of 2. Page 2 of 2. Purpose of Life.pdf. Purpose of Life.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Purpose of Life.pdf.

Purpose of Journalism.pdf
Purpose of Journalism.pdf. Purpose of Journalism.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Purpose of Journalism.pdf.

The Notion of Unwanted Car for Cash is at its Peak These Days.pdf ...
Page 1 of 1. The Notion of Unwanted. Car for Cash is at its. Peak These Days. When we talk about our beloved car, it is more of a necessity then luxury. and probably that is the case for most of the people out there. There are. many memories that mak