CASTRO STATION ELEVATOR PROJECT CONCEPTUAL STUDY JUNE 2016

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

1

PROJECT OVERVIEW PROJECT SITE The Castro Muni Station lies in the heart of the Castro neighborhood providing public transportation access to residents and visitors alike.

PROJECT AND ACCESSIBILITY NEEDS The Castro neighborhood is heavily visited via the Muni Metro. The Castro Muni Station was built in 1972: • The existing elevators that serve the Station are outdated and do not meet current building code and accessibility requirements. • There is no elevator that serves the Street and Concourse levels on the south side of the Station. • There is no accessible path from the busy corner of Market and Castro Streets to the south entrance of the Station and Harvey Milk Plaza. • It is SFMTA’s goal to provide uninterrupted elevator access.

SCOPE OF WORK To add a new elevator and accessible path on the south-side of the Station only. Harvey Milk Plaza re-design and modification are not part of the scope of work for this project.

PRIMARY PROJECT GOALS • Provide a new elevator on the south side of Market Street to meets current code and accessibility requirements. The elevator will serve the street, concourse and platform levels of Castro Station. Create an accessible path from the corner of Market and Castro Streets. • Provide an elevator that integrates with the Castro Community and Harvey Milk Plaza.

PROJECT STAKEHOLDERS • •

Muni customers Castro residents and merchants

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

2

SITE MAPS NORTH

CASTRO St

. St T E

K

SITE

AR M

17th St

17th St

S IT E

HARFORD St

R MA

St.

CASTRO St

T KE

COLLINGWOOD St

SITE CA RO ST St

. St T E

K AR M

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

3

TRANSIT SYSTEM-WIDE ELEVATOR /ESCALATOR PROJECTS SFMTA’s goal and standard is to provide uninterrupted elevator access at each level in all underground stations. This standard has been adopted by The Central Subway Project. SFMTA is working to incorporate the standard in existing stations by upgrading existing elevators or adding new elevators. This is a list of projects: ELEVATOR UPGRADES

ELEVATORS SFMTA SUBWAY SAFETY AND RELIABILITY UPGRADE PROJECT Modifications to 12 elevators at the following stations: • Van Ness • Church • Castro • Forest Hill Station POWELL STATION PLATFORM ELEVATOR PROJECT Installation of a new elevator at Powell Station which will serve the Mezzanine, Muni Platform and BART Platform levels. VAN NESS STATION STREET ELEVATOR REPLACEMENT / RELOCATION PROJECT Replacement of existing Van Ness Station Street Elevator with two new street elevators at an alternate location. This work is in conjunction with The One Oak Project. CENTRAL SUBWAY PROJECT Installation of new elevators and escalators for three new subway stations. ESCALATORS ESCALATOR MODERNIZATION PROJECT PHASE II The scope includes replacement of 17 escalators in the subway system.

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

4

SITE | STREET LEVEL 4

1 S ITE

6

7

2

5

3 Street level plan - Not to scale

ƵƐƐƚŽƉŽŶŶĂƌƌŽǁƐŝĚĞǁĂůŬ 1 Market Street - Bus stop

hŶĚĞƌƟůŝnjĞĚƵƉƉĞƌǁĂůŬǁĂLJ 2 Upper walkway

&ĞŶĐĞĚŽīŐƌĞĞŶƐƉĂĐĞ 3 Fenced off green space

4 Trees in sunken plaza DĂƚƵƌĞƚƌĞĞƐŝŶƐƵŶŬĞŶĨĞŶĐĞĚƉůĂnjĂ

ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ

/ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ

New elevator New elevator New elevator

ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ

/ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ 5 Upper walkway

Building Design & Construction

6 Upper walkway

7 Rainbow flag

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

5

SITE | CONCOURSE LEVEL

1 Exterior stairs

2 Concourse entrance

3 Concourse entrance

New elevator

5

S IT E

4 Sunken Plaza

3

4 2

1

Concourse level plan - Not to scale

5

Exterior elevator

New window panel New opening for elevator exit

View of platform level

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

6

SITE | PLATFORM LEVEL New opening for elevator exit

1, 2 & 4

View of platform

3

2

4

1

Platform level plan - Not to scale

S IT E

4 Existing elevator

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

7

PROPOSED ELEVATOR

ALTERNATIVE PLATFORM

QUALIFICATIONS FOR THE PREFERRED ELEVATOR LOCATION o

Adjacent to Concourse

o

Adjacent to station structure

o

Minimal impact to the Plaza

o

No impact to (E) vertical circulation

o

Shortest distance to create an accessible path of travel to the corner of Market and Castro Streets

o

Optimal stacking location to provide platform access on the in-bound side

o

Ideal location to integrate with future Harvey Milk Plaza re-design proposals

Street level plan - Not to scale

Concourse level plan - Not to scale

Platform level plan - Not to scale

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

8

PROPOSED PLAZA

1

Proposed elevator location

STREET LEVEL

1 Regrade paving to provide accessible path between Market St and Castro Street intersection to proposed elevator

1 MEZZANINE LEVEL

1 Regrade paving at mezzanine level to correct drainage issues

2

3

into escalator. Opportunities for special paving.

2 Extend paved area into existing gravel area at garden. Opportunities for special paving

3 5HFRQÀJXUHIHQFLQJDQGFRPPHPRUDWLYHSODTXHV

Building Design & Construction

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

9

PROJECT SCHEDULE

ID

Task Mode

TaskName

Duration

Start

Finish

Predecessors Nov

0

CastroStationElevator

1 2 3 4 5 6 7 8

CER InitialProjectOutreach CivicDesignReview HarveyMilkPlazaDesignApproval ConstructionandBidDocuments BidandAward Construction CloseOut

Project:CastroStationElevator Date:Wed6/15/16

775days

Mon2/1/16

Fri1/18/19

155days 76days 66days 0days 265days 65days 280days 45days

Mon2/1/16 Fri4/15/16 Mon7/18/16 Fri12/30/16 Mon7/18/16 Mon7/24/17 Mon10/23/17 Mon11/19/18

Fri9/2/16 Fri7/29/16 Mon10/17/16 Fri12/30/16 Fri7/21/17 Fri10/20/17 Fri11/16/18 Fri1/18/19

1stQuarter 3rdQuarter 1stQuarter 3rdQuarter 1stQuarter 3rdQuarter 1stQuarter Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar

12/30

5 6 7

Task

ProjectSummary

InactiveMilestone

ManualSummaryRollup

Deadline

Split

ExternalTasks

InactiveSummary

ManualSummary

Progress

Milestone

ExternalMilestone

ManualTask

StartͲonly

Summary

InactiveTask

DurationͲonly

FinishͲonly

Page1

Building Design & Construction 





CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St    SFMTA | JUNE 2016

 





10

INSPIRATIONS & REFERENCES: ELEVATOR

san francisco references

7 3

2

1

transparency

1. Structural Glass elevator 2. Urban elevator and pedestrian bridge. Galtzaborda, Spain 3. Urban elevator and pedestrian bridge. Gipuzkoa, Spain 4. New York City subway exit elevator 5. Structural Glass urban elevator. San Diego 6. Glass elevator in Colle di val d’elsa. Tuscany, Italy 7. Powell street elevator. San Francisco 8. Market street elevator. Muni/Bart, San Francisco

4

Building Design & Construction

8

5

6

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

11

INSPIRATIONS & REFERENCES: PLAZA commemoration & celebration

1

6

9

11

10

12

3

2

community 4 7

5 8

Building Design & Construction

1. Harvey Milk, Market Street,1978 2. Harvey Milk Plaza, 2016 3. Rainbow Flag, Harvey Milk Plaza 4. The Sisters of Perpetual Indulgence 5. Rainbow Escalator, Harvey Milk Plaza 6. Harvey Milk 7. Terrazzo Paving with Tile Inlay, San Diego 8. Harmonie Plaza, Detroit 9. Vietnam Veterans Memorial, Washington DC 10. Lidabashi Plano, Tokyo 11. Poppy Plaza: Landscape of Memory, Calgary 12. Centennial Wall, HKU Metro Station, Hong Kong

CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St SFMTA | JUNE 2016

12

Castro Station Elevator - Castro Merchants Final-email-2.pdf

Page 2 of 12. CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St. SFMTA | JUNE 2016. 2. Building Design & Construction.

3MB Sizes 0 Downloads 215 Views

Recommend Documents

Castro Station Elevator - Castro Merchants Final-email-2.pdf ...
Page 2 of 12. CASTRO STATION ELEVATOR PROJECT | Castro MUNI Station | Castro St & Market St. SFMTA | JUNE 2016. 2. Building Design & Construction.

FONSECA CASTRO, Jorge.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. FONSECA CASTRO, Jorge.pdf. FONSECA CASTRO, Jorge.pdf. Open. Extract. Open with. Sign In. Main menu.Missing:

16060- _ JOSE DARIO CASTRO URIBE- - DIRECTRI....pdf
C.I.(IMG)-3-2017-000101-(1)-16060- _ JOSE DARIO CASTRO URIBE- - DIRECTRI....pdf. C.I.(IMG)-3-2017-000101-(1)-16060- _ JOSE DARIO CASTRO URIBE- ...

JONATHAN ALEXANDER CASTRO SANCHEZ.pdf
JONATHAN ALEXANDER CASTRO SANCHEZ.pdf. JONATHAN ALEXANDER CASTRO SANCHEZ.pdf. Open. Extract. Open with. Sign In. Main menu.

dra-castro-sesbibl-nov14.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. dra-castro-sesbibl-nov14.pdf. dra-castro-sesbibl-nov14.pdf. Open. Extract. Open with. Sign In. Main menu.

CASTRO LEJARRIAGA, LUIS MIGUEL DE.pdf
Whoops! There was a problem loading more pages. Retrying... CASTRO LEJARRIAGA, LUIS MIGUEL DE.pdf. CASTRO LEJARRIAGA, LUIS MIGUEL DE.pdf.

MARTÍN CASTRO, Gregorio.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. MARTÍN CASTRO, Gregorio.pdf. MARTÍN CASTRO, Gregorio.pdf. Open. Extract. Open with. Sign In. Main menu.

Juan-Ramon-Castro-Rodriguez.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Juan-Ramon-Castro-Rodriguez.pdf. Juan-Ramon-Castro-Rodriguez.pdf. Open. Extract. Open with. Sign In. Main me

Compartir 'Jorge Castro - declaración de la CTT PIT-CNT.pdf ...
Loading… Page 1. Whoops! There was a problem loading more pages. Retrying... Main menu. Displaying Compartir 'Jorge Castro - declaración de la CTT PIT-CNT.pdf'.

CASTRO, Eduardo V. & CUNHA, Manuela Carneiro. Vingança e ...
Vingança e temporalidade.pdf. CASTRO, Eduardo V. & CUNHA, Manuela Carneiro. Vingança e temporalidade.pdf. Open. Extract. Open with. Sign In.

Dra de Castro sesbibl Nov15.pdf
Page 2 of 48. ENFERMEDAD CELÍACA (EC). Ø Enfermedad autoinmune. Ø HLA DQ2 o DQ8. Ø Serología positiva. Ø Histología compatible (clasificación ...

OGTIC - Gladys Castro De La Cruz.pdf
Page. 1. /. 2. Loading… Page 1 of 2. Page 1 of 2. Page 2 of 2. Page 2 of 2. OGTIC - Gladys Castro De La Cruz.pdf. OGTIC - Gladys Castro De La Cruz.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying OGTIC - Gladys Castro De La Cruz.pdf. P

DENUNCIA CASTRO BARROS FINAL-watermark (1).pdf
Sign in. Page. 1. /. 8. Loading… Page 1 of 8. DENUNCIAN DOMICILIOS FALSOS(ART. 137 LEY 19945) – SOLICITA. ANULACION REGISTRAL DE ...