Facilities Needs Presentation September 29, 2015 Pam Jones and Todd LoFrese

Our Goal • • • •

Two Districts Two Similar, but Different Set of Needs Two Different Approaches One Goal – To Provide: Safe, Secure, and Healthy Facilities to  Support Student Learning and Achievement

Thorough, Detailed, Responsible • Process started in 2011 • Professional Architectural and Engineering  Evaluation • Comprehensive recommendations, linked to  Orange County School Construction Standards • Scaled back: – CHCCS original $200M, now $160M – OCS  original  $161M, now $65M*(BOE Prioritized  $50‐$70M only)

OCS Facilities Summary • Focus on projects  not fundable through current CIP  allocations in these areas: – Safety – Replacement of antiquated mechanical  equipment – Cedar Ridge classroom wing – Replacement of Transportation facilities – Upgrade/Replace food service  facilities/equipment

Areas of Work Estimated total:  $15.9M

Major Mechanical System  Replacement

• • • • • • •

A.L. Stanback Middle  Cameron Park Elementary Central Elementary Efland Cheeks Elementary Grady Brown Elementary Hillsborough Elementary Orange High School

Areas of Work Estimated total:  $28.5M

Major Infrastructure Projects   • A.L. Stanback Middle  • Cameron Park Elementary • Central Elementary • Efland Cheeks Elementary • Grady Brown Elementary • Hillsborough Elementary • Orange High School

Areas of Work—All Schools Food Service:  $ 1.4M                Safety:  $2.7M

Area of Work—Additions Cedar Ridge High School:    $14.7M  •Occupied 2002 •Design included 500 student addition •Capacity:  1000 •Current enrollment:  1149 •SAPFO projects high school capacity at 110.2%       in 2022‐2023

CHCCS Older Facilities Summary • Older schools need significant investments • Recommendations – Fix aging infrastructure issues – Bring older schools to OC standard – Address safety and security – Increase capacity and delay new schools – Eliminate mobile classrooms – Delays operational increases

CHCCS Facilities Assessment

CHCCS Facilities Assessment

CHCCS Facilities Assessment – PHASE 1

CHCCS Facilities Assessment

CHCCS Facilities Assessment – PHASE II

CHCCS Facilities Assessment

CHCCS Facilities Assessment Phase 3

CHCCS Facilities Assessment

CHCCS Facilities Assessment

CHCCS Facilities Assessment

CHCCS Facilities Assessment

CHCCS Facilities Assessment

Collaboration Opportunity • Based on $125 Million Bond distributed  roughly by ADM, both districts would like to  jointly fund a centralized transportation  maintenance center. – Efficiency – Effectiveness – Safety – Appropriate Working Conditions

Long Term • Current Annual Pay as you Go, ¼ Cent, and Lottery – CHCCS  $1.988M for computers, $1.988M for facilities – OCS  $1.1M for computers, $1.4M for facilities

• Consider the Math – CHCCS  Facilities $1.988M/20 Schools = $99,400 per school – CHCCS Combined Insured Value = $388M.  Current annual  capital spending is .5% (.005) of total value – OCS  Facilities $1.4M/13 Schools = $107,000 per school – OCS  Combined Insured Value = $232M  current annual  capital spending is less than .6% (.006) of total value

Long Term • A bond will help us begin to catch up. • Additional ongoing maintenance funding will  be needed for older and newer facilities  moving forward. • Continued community support

Commissioners - September 29 Final Version.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Commissioners ...

2MB Sizes 0 Downloads 254 Views

Recommend Documents

Commissioners - September 29 Final Version.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Commissioners - September 29 Final Versi

CIRCULAR 119-16 September 29, 2016 FINAL CONTRACT ...
Sep 29, 2016 - Telephone: (514) 871-2424. Toll-free within Canada and the U.S.A.: 1 ... Shareholders of record as of the close of business on September 30, 2016 will receive one common share of ECN Capital for each common share ... the close of marke

PARIS, 29-30 SEPTEMBER 2016
Sep 30, 2016 - price of the American Put/Call. ... Lévy models, which provides a very good statistical fit with observed ... Abstract: We study optimal buying and selling strategies in target zone ... which the diffusion remains in the domain.

PARIS, 29-30 SEPTEMBER 2016
Sep 30, 2016 - a power-law as the liquidation speed tends to infinity. .... Abstract: Consumers satisfy their electricity demand by self-production (solar panels) and centralized pro- ... best performing model among all the existing alternatives.

Page 1 September 17 September 21 October 13 - - -- October 29 ...
Your Lost no me: First Nome: Your telephone number (home) (cell) .... Business attire is required at Youth in Government because delegates are attempting to ...

September 2016 Newsletter FINAL DRAFT.pdf
of our website. Chesterfieldresidents.wordpress.com. Community. Meeting. Page 3 of 8. September 2016 Newsletter FINAL DRAFT.pdf. September 2016 ...

Final Friday map - September - Color.pdf
Page 1 of 1. WASHINGTON PARK. FINDLAY. PLAYGROUND. GRANT. PLAYGROUND. HANNA. PLAYGROUND. ZIEGLER PARK. FINDLAY. MARKET.

Final Elementary September 2017.pdf
Blue Ribbon Cole Slaw. Chilled Pineapple. Oven Baked All-White Chicken. Nuggets with Whole Grain Dinner Roll. *****. Creamy Mashed Potatoes with Gravy.

september 2015rpt FINAL (1).pdf
Page 1 of 3. AUSTIN COMMUNITY COLLEGE – FACULTY CENTER FOR TEACHING AND LEARNING 1. Project Status Report For Month of: September 2015. September 30, 2015. Status Code Legend. Item is active / ongoing Item is complete Goal for project. Item is near

LISTING Download Ref. No.: NSE/CML/33305 Date : September 29 ...
Sep 29, 2016 - 1. Capital First Limited. Symbol. CAPF. Name of the Company. Capital First Limited. Series. EQ. ISIN*. INE688I01017. Face Value (In Rs.) 10.00.

Minutes of the PRAC meeting 26-29 September 2016 - European ...
List of products under additional monitoring – consultation on the draft list . ... Tools, educational materials and effectiveness measurement of risk minimisations .......... 48 .... Initial marketing authorisation application (MAA) procedures: ea

PRAC Agenda 25-29 September 2017 - European Medicines Agency
Sep 25, 2017 - and may also change during the course of the review. ...... Scope: Update of section 5.1 of the SmPC based on new clinical data from a ...

NSE/CML/33297 Date : September 29, 2016 Circular
Sep 29, 2016 - Sub : Suspension of trading in units - on account of redemption - ICICI ... Manager. Telephone No. Fax No. Email id. 022-26598235/36.

PRAC Agenda 25-29 September 2017 - European Medicines Agency
Sep 25, 2017 - Send a question via our website www.ema.europa.eu/contact ...... 6.1.46. Naloxegol - MOVENTIG (CAP) - PSUSA/00010317/201703 .

Minutes of the PRAC meeting 25-29 September 2017 - European ...
Nov 27, 2017 - For background information, see PRAC minutes September 2017. The MAHs replied to the request for information on the signal of doxycycline-induced Jarisch-. Herxheimer reaction and the responses were assessed by the Rapporteur. Discussi

Minutes 25-29 September 2017 - European Medicines Agency
Nov 27, 2017 - Minutes of the meeting on 25-29 September 2017. Chair: June Raine – Vice-Chair: Almath Spooner. Health and safety information. In accordance with the Agency's health and safety policy, delegates were briefed on health, safety and eme

Minutes of the PRAC meeting 26-29 September 2016 - European ...
Some of the information contained in the minutes is considered commercially confidential or sensitive and therefore not disclosed. With regard to intended ...

Truth Momentum—Part 29 September 19/20 ... - New Hope Church
"Even So Come" words and music by Chris Tomlin, Jess Cates, and Jason Ingram. © S. D. G. Publishing ... Stephanie Kulla, Jason. Ingram, Jonathan Smith.

BETWEEN THE POSTS 13- 36 - September 29 -2010.pdf ...
Round Tower GAA Club, Convent Road, Clondalkin, Dublin 22 Phone (01) 4592960 ... SENIOR B HURLING CHAMPIONSHIP. ROUND ... MINOR FOOTBALL CHAMPIONSHIP ... BETWEEN THE POSTS 13- 36 - September 29 -2010.pdf.

NSE/CML/33301 Date : September 29, 2016 Circular
Sep 29, 2016 - Sub : Listing of units issued by UTI Asset Management Company Limited (UTI- ... Manager. Telephone No. Fax No. Email id. 022-26598235/36.

Minutes of the PRAC meeting 29 August - 1 September 2017
Oct 12, 2017 - Some of the information contained in the minutes is considered commercially confidential or sensitive and therefore not disclosed. With regard to intended therapeutic indications or procedure scope listed against products, it must be n

NSE/CML/33301 Date : September 29, 2016 Circular
Sep 29, 2016 - Sub : Listing of units issued by UTI Asset Management Company Limited ... Company Limited (ICICI Prudential Fixed Maturity Plan Series 79 ...

Website Adds from September 29, 2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Website Adds ...