2017 Workplan

Capacity component Output 1: By 2018, capacity to implement resource mobilization mechanisms is improved Indicator

Baseline

2017 Target

1. Number of viable proposals submitted by LGUs

No proposals submitted

Proposals submitted to PSF amounting to at least P100M

2. Number of viable proposals submitted by LGUs

No proposals submitted

Proposals submitted to ER 1-94 amounting to at least P200M

3. Programs developed for donor and private sector participation

Limited programs 1 marketplace/matching activity for 4 proponents conducted

1

12/1/2016

Capacity component Output 1: By 2018, capacity to implement resource mobilization mechanisms is improved Indicator

Baseline

2017 Target

4. Private sector participation in marketplace as investors ensured

TeaM Energy CSR for Mts. BanahawLimited private sector investment Cristobal NP & Maneluag Spring Protected Landscape finalized in biodiversity conservation At least 1 RTD conducted (may 5. Viability of other financial No feasibility include discussions on carbon tax and PSF mechanisms (debt swaps, green bonds, studies IRR in addition to other finance social impact investment, ecological mechanisms) fiscal transfers) determined

Capacity component Output 1: By 2018, capacity to implement resource mobilization mechanisms is improved Indicator

Baseline

2017 Target

6. LGUs with localized biodiversity action plans and implementing finance solutions

LGUs do not have biodiversity action plans and finance solutions

• Biofin workbooks implemented in 2 LGUs

7. PBSAP Secretariat strengthened

Not all BMB staff participated in the PBSAP development/ updating process

• Support to cascading activities for other DENR bureaus, agencies and regional offices provided • Abridged and unabridged versions of the PBSAP published

2

12/1/2016

Policy component Output 2. By 2018, environmental policies are conducive for investments in biodiversity conservation Indicator

Baseline

2017 Target

1. Number of policy papers and policies developed and implemented

Absence of policies conducive for investments in biodiversity conservation

• Draft JAO/DAO on biodiversity tagging formulated • Draft DAO on recommended modes of PPP for biodiversity conservation • DAO on establishment of PPP unit in DENR signed and implemented • “Establishment of a Carbon Sequestration Accounting, Verification and Certification System”

Policy component Output 2. By 2018, environmental policies are conducive for investments in biodiversity conservation Indicator

Baseline

2017 Target

1. Number of policy papers and policies developed and implemented

Absence of policies conducive for investments in biodiversity conservation

• Research on PPP modalities conducted • House bill on Malampaya Fund signed and filed for 17th congress • Support to house hearings and other preparatory activities • Support to BMB and NEDA for PIP formulation

3

12/1/2016

Awareness component Output 3. Greater awareness on biodiversity and its importance to the economy is achieved Indicator

Baseline

2017 Target

1. Communication Plan formulated & implemented

No IEC plan

• IEC plan implemented

2. Number of partnership activities conducted

No previous • At least 1 partnership activity partnership activities conducted (Fund raising activity with WIBI project)

Awareness component Output 3. Greater awareness on biodiversity and its importance to the economy is achieved Indicator

Baseline

2017 Target

3. Number of organizations/agencies that forged partnership and commitment to implement strategies and actions in the IEC plan

No previous • At least 2 organizations/agencies organizations/agenci committing to implement actions in es that committed to the IEC plan IEC plan

4. Number of IEC materials produced and disseminated

No IEC materials produced

• At least 2 IEC materials produced & disseminated

4

12/1/2016

Awareness component Output 3. Greater awareness on biodiversity and its importance to the economy is achieved Indicator

Baseline

2017 Target

5. Number of radio and other media sources highlighting biodiversity financing

No previous radio & other media sources

• At least 2 radio and other media coverage done

6. Number of press releases published

Scant press releases on biodiversity financing

• At least 2 press releases published

Awareness component Output 3. Greater awareness on biodiversity and its importance to the economy is achieved Indicator

Baseline

2017 Target

7. Documentation of PPPs/finance solutions

No case studies on PPPs/finance solutions

• At least 1 case study produced

5

12/1/2016

Project Management Output 4. Project Management Indicator

Baseline

2017 Target

1. Quality assessment (QA) report

No QA report

• M&E plan finalized and implemented • Improved QA score

2. Attendance to institutional and projectrelated activities/meetings

• Mid-year & yearend assessment conducted • At least 2 board meetings convened • Quarterly team meetings convened

3. Reports submitted

• Timely submission of reports

Proposed Budget 2017 Output

Planned Budget

% to Budget

1. Capacity to implement resource mobilization mechanisms

90,890.06

53

2. Policy environment conducive to BD investments

13,714.29

8

3. Greater awareness on biodiversity

40,000.00

24

4. Project management

26,395.65

15

171,000.00

100

Sub-total 2016 carry over (estimate) Total

6,612.21 177,612.21

6

Capacity component -

Dec 1, 2016 - Draft JAO/DAO on biodiversity tagging formulated. • Draft DAO on recommended modes of. PPP for biodiversity conservation. • DAO on establishment of PPP unit in. DENR signed and implemented. • “Establishment of a Carbon. Sequestration Accounting, Verification and Certification System”.

841KB Sizes 5 Downloads 340 Views

Recommend Documents

Component Testing
Jul 8, 2002 - silicon atom. ... you really have to understand the nature of the atom. ..... often that you see a desktop computer burst into flames and burn down ...

Component Testing
Jul 8, 2002 - use a meter to test suspect components and troubleshoot electronic circuits. ..... The valence electron is held loosely to the atom and moves.

Ergodic Capacity and Outage Capacity
Jul 8, 2008 - Radio spectrum is a precious and limited resource for wireless communication ...... Cambridge, UK: Cambridge University Press, 2004.

Component symbols.pdf
Cell Supplies electrical energy to a circuit, the longer line ... Loudspeaker Converts electrical energy into sound energy. Page 1 of 1. Component symbols.pdf.

Scalable Component Abstractions - LAMP | EPFL
We identify three programming language abstractions for the construction of .... out to be a convenient way to express required services of a component at the ..... the method call f() does not constitute a well-formed path. Type selection and ...

Scalable Component Abstractions - EPFL
from each other, which gives a good degree of type safety. ..... Master's thesis, Technische Universität ... Department of Computer Science, EPFL, Lausanne,.

africa capacity 201 report 4 - The African Capacity Building Foundation
Dec 3, 2014 - year the focus is on the capacity imperatives for regional integration, a core mandate of the ACBF, and on the ...... policies for aid effectiveness; and the degree of inclusiveness ...... based products, automotive, e-commerce,.

africa capacity 201 report 4 - The African Capacity Building Foundation
Dec 3, 2014 - ... form or by any means, electronic, mechanical, photocopying recording or otherwise, without prior written permission. ...... ECCAS. EAC is the most advanced, launching its ..... ACR's primary index and its signature trademark ...

ELECTRONIC COMPONENT AND CMOS TECHNOLOGY.pdf ...
Page 1 of 2. P.T.O.. IV Semester B.E. (E&C) Degree Examination, January 2013. (2K6 Scheme). EC- 401 : ELECTRONIC COMPONENT AND CMOS ...

Viewed from PCB Component side
版次(rev.) A / 1. 1 : 1. 电话(tel). HOUSING. 单位(units). (mt'l). PIN. Qsn6.5-0.1. PBT. MM. 图名(name). 材料. 料号(Part number). 图档(File Name). UNIT:mm. 1. 3. 5.

Scalable Component Abstractions - LAMP | EPFL
Classes on every level can create objects ... level might be a simple element on the next level of scale. ...... Department of Computer Science, EPFL, Lausanne,.

Scalable Component Abstractions - LAMP - EPFL
software components with static data and hard references, resulting in a ... aspect-oriented programming (indeed, the fragment system .... An important issue in component systems is how to ab- ... this section gives an introduction to object-oriented

Two Component Mixture
2.5. 3. Time (min). Two Component Mixture. Composition, wt %. 1. Isopropanol 53%. 2. n-heptane. 47%. Sample: Neat. GC: 7890A. Carrier: Helium, 5 mL/min. Column: DB-5 (30 m, 0.32 mm, 1.5 micron). Detector: Polyarc/FID. 1. 2. 100° C. 100° C/min. 70°

Component level testing.pdf
Ph: +91 80 28360184 Email: [email protected]. Accurate and affordable testing! Component-level testing. Stringer Edge Grab Handle. Engine Mount on Cross ...

Component Reconn-exion
Nov 9, 2006 - 2.5.1 A Brief History of Encapsulation in Software Development . . 25. 2.5.1.1. Monitors . ...... introduced and used, as-is, across a company or.

REVIEWED Component #45.pdf
and finding students at different levels, nevertheless, does not mean that the teacher must adjust. for all students, but rather the teacher should be weary of ...

REVIEWED Component #259.pdf
In Evensen, D., and Hmelo, C. E. (eds.), Problem-Based ... Educational Psychology Review, 16(3), 235-266. Meyer, D. K. ... REVIEWED Component #259.pdf.

Medicinal product with a textile component
Jan 28, 2000 - structed in compact parallel bundles, whereas the meshwork .... spanned by a continuous thread 18 according to FIG. 3,. Which for example ...