Issue Two 

March 2015 

Bridger Canyon Corridor Planning Study  STUDY DESCRIPTION 

The Montana Department of Transporta on (MDT) has completed the Bridger Canyon Corridor Planning Study to iden fy issues, constraints, and poten al opportuni es for improvements within the Montana Highway 86 (MT 86) corridor north of Bozeman.  

WHAT ARE THE CORRIDOR NEEDS? 

Needs and objec ves for the Bridger Canyon Corridor Planning Study were developed based on exis ng and projected condi ons within the corridor, input from the public and resource agencies, and coordina on with the study advisory commi ee.   Need 1:   Improve the safety of MT 86 for all users.   Need 2:   Maintain infrastructure assets in the corridor.      View the full list of corridor needs and objec ves online at www.mdt.mt.gov/pubinvolve/bridger   

INSIDE THIS ISSUE  Study Descrip on ...... 1 Corridor Needs .......... 1 Improvement Op ons Figure ........................ 2 Improvement Op ons List ............................. 3 Study Contacts ........... 4 Involvement Opportuni es ............ 4 An cipated Study Schedule .................... 4

PLEASE JOIN US FOR  AN INFORMATIONAL  MEETING!  Thursday, April 2, 2015    at 6:00 p.m.  Bridger Canyon Fire Hall  8081 Bridger Canyon Rd.  The purpose of the mee ng is to present the dra corridor study.

IMPROVEMENT  OPTIONS 

2

IMPROVEMENT OPTIONS  The table below lists a range of op ons MDT may consider for implementa on in the MT 86 corridor in the future. MDT may elect to implement a single op on or combine mul ple op ons at the me a project is nominated. Improvements are not listed in order of priority. In some cases, minor improvements (such as cleaning culverts to improve drainage) may be accomplished through rou ne maintenance ac vi es as funds become available. Addi onally, MDT may incorporate select study recommenda ons into projects that are currently programmed for design and construc on. At this me, no funding has been dedicated to corridor improvements iden fied in this study.

Number  Descrip on  Op on 1 

Op on 2.a 

Bridge Repairs 

RP 7.8 (Stock Pass) RP 24.4 (Cache Creek) RP 26.8 (Carrol Creek) RP 28.0 (Flathead Creek)

Roadway Realignment  at Slide Area 

RP 4.3 to RP 4.6 (slide area)

Horizontal and Ver cal  Curve Improvements  Op on 2.b  with Shoulder  Widening  

Op on 3 

Loca on 

Various loca ons from RP 4.1 to RP 35.8

Drainage Correc ons  

RP 23.4

Op on 4.a 

Approach Sight  Distance Mi ga on  

RP 4.2 (“M” Trailhead) RP 6.7 (Kelly Canyon Road)(3) RP 15.2 (Private Approach) RP 18.8 (Bracke Creek)(3) RP 22.7 (Private Approach)

Op on 4.b 

Intersec on  Realignment 

RP 18.8 (Bracke Creek) RP 28.8 (Muddy Creek Road)

Op on 4.c  Turn Lanes 

Op on 5.a 

Guardrail  Improvements  

Rockfall Hazard  Op on 5.b  Mi ga on and  Maintenance  

Op on 6.a 

Variable Message  Signage  

Op on 6.b  Sta c Wildlife Signage  

RP 4.2 (“M” Trailhead) RP 6.7 (Kelly Canyon Road) RP 9.5 (Jackson Creek Road) RP 15.7 (Bridger Bowl) RP 18.8 (Bracke Creek) RP 20.5 (Ba le Ridge Campground) As needed throughout corridor RP 4.4 RP 4.8 RP 5.2 RP 12.3 RP 12.4

12.7 16.0 18.6 19.0

As needed throughout corridor RP 6.0 to 10.0 or where needed

3

STUDY CONTACTS    Jeff Ebert MDT Bu e District Administrator 406‐494‐9625 [email protected] Ka e Po s MDT Project Manager 406‐444‐9238 kpo [email protected]

  Sarah Nicolai DOWL Project Manager 406‐324‐7412 [email protected]

INVOLVEMENT OPPORTUNITIES  An informa onal mee ng is scheduled for Thursday, April 2,  2015, at the Bridger Canyon Fire Hall, 8081 Bridger Canyon Road, from 6:00 p.m. to 8:00 p.m. The purpose of the mee ng is to present the dra corridor study, discuss recommended improvement op ons, and request feedback. We encourage you to a end and provide comments by April  17, 2015. Please visit the study website to view the dra corridor study report (www.mdt.mt.gov/pubinvolve/ bridger). MDT a empts to provide accommoda ons for any known disability that may interfere with a person’s par cipa on in any service, program or ac vity of the department. Alterna ve accessible formats of this informa on will be provided upon request. For more informa on, please call Sarah Nicolai at (406) 324‐7412 or Montana Relay at 711.

We Are Here 

Bridger Canyon Corridor Planning Study

Apr 2, 2015 - View the full list of corridor needs and objecves online ... Alternave accessible formats of this informaon will be provided upon request. For more ...

2MB Sizes 1 Downloads 226 Views

Recommend Documents

Bridger Canyon Corridor Planning Study
Apr 2, 2015 - interfere with a person's parcipaon in any service, program or acvity of the department. Alternave accessible formats of this informaon will be ...

pattullo corridor study pattullo corridor study - CBC.ca
development of the key technical findings for inclusion in the long term ... Implementation costs have also been developed for each of the options under ...

pattullo corridor study pattullo corridor study - CBC.ca
development of the key technical findings for inclusion in the long term ... Implementation costs have also been developed for each of the options under ...

sunshine canyon landfill supppemental waste characterization study
Figure 9 below is the distribution of the overall waste by each waste source. ...... envelopes, white or colored notebook paper, carbonless forms, and junk mail.

sunshine canyon landfill supppemental waste characterization study
Figure 9 below is the distribution of the overall waste by each waste source. ...... envelopes, white or colored notebook paper, carbonless forms, and junk mail.

Case study - SEA of GMS North-South Economic Corridor Strategy ...
especially the “Golden Triangle” region. • The route ... Case study - SEA of GMS North-South Economic Corridor Strategy and Action Plan.pdf. Case study - SEA ...

Map - Mesquite Blvd Corridor Study Area.pdf
Woodbury. Fairways. Turtleback. Lew si. M mi osa. LaScala. Topaz. S. mokey. Reber. Harrier. Glade. Hagens. Rolling Hills. Lolita. Bannock. Muscat. Clark. Wi dl fang. Pu sl pi her. Pheasant. Desert. Condor. Buteo. Sun Val el y. Partridge. Thompson. Ca

Main Boulder Corridor Study Report FINAL.pdf
Gallatin National Forest.................................................................................................................................................60 ..... Main Boulder Corridor Study Report FINAL.pdf.

Map - Mesquite Blvd Corridor Study Area.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Map - Mesquite ...

Osgood Corridor Plan.pdf
LANDUSE MAP. PREPARED FOR. RGPL 591A. BY: Ivette Banoub, Kirsten Bryan,. Jonathan Cooper, Tara Gehring,. Anita Lockesmith, Jennifer Stromsten.

Jim-Bridger-Mountain-Man.pdf
Page 1 of 2. Download ~-~-~-oo~~ eBook Jim Bridger: Mountain Man. (-PDF-) Jim Bridger: Mountain Man. JIM BRIDGER: MOUNTAIN MAN EBOOK AUTHOR BY STANLEY VESTAL. Jim Bridger: Mountain Man eBook - Free of Registration. Rating: (85 votes). ID Number: 57-A

Canyon Hydrology.pdf
As a result, the current creates high. pressure areas where it impacts the. outside of bends. This can cause. erosion, leading to undercut banks. Conversely, there will be low. pressure areas (and slower water). on the inside of bends. This can lead.

A corridor linking protected forests
sustainability is afforded less attention in the PRSPs than the achievement of other MDGs. This is of ..... maximum score that a group could award was set at six.

Using the Corridor Map Method for Path Planning for a ...
card and an Intel Core2 Quad cpu (2.4 ghz) with 4 gb memory. (While this processor has .... to reach its goal. Thus, a shorter and more direct path is generated.

44; denver - Welton Corridor Denver, Colorado
Jul 1, 2015 - Email: Zip:80002 meagre liviofliiimrlou (tr ivor ... Email:[email protected] pri80202 . 71112015 ... the Denver Zoning Code or. Former Chapter 5.

Integrale visie Groene Corridor Eindhoven.pdf
Whoops! There was a problem loading more pages. Retrying... Integrale visie Groene Corridor Eindhoven.pdf. Integrale visie Groene Corridor Eindhoven.pdf.

Visakhapatnam-Chennai Industrial Corridor Development Program
Jun 28, 2017 - Atchuthapuram and 220kV DC Line from 220/132/33kV Brandix SS to the proposed. 220/132/33kV GIS at Achutapuram ... TELEPHONE No.

44; denver - Welton Corridor Denver, Colorado
Jul 1, 2015 - ReqUESt _ ChECk all that Adding/removing/changlng windows l-llllll apply Changes to .... BIKE PARKING: 39 BIKE SPACES [ALL COVERED}.

Leaving-Takoma-Park-Lewis-Bridger-Books-Volume-1.pdf ...
THE COLLECTED LETTERS OF C S LEWIS VOLUME 1. Read On the web and Download Ebook The Collected Letters Of C S Lewis Volume 1. Download C. S. Lewis ebook file. totally free and this ebook pdf present at Tuesday 31st of July 2012 07:48:52 AM, Get many E

Canyon Crest SID
R id g e. F a lls. D r iv e. Ivy. Lee. Crest. K en sington. A venue. O. asisB o u le v a rd. Canyon Crest Boulevard. Hardy Way. M e s q u ite. H e ig h ts. R o a d.

Bryce Canyon City.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bryce Canyon ...

North-South Road Corridor Investment Program - Asian Development ...
Sep 30, 2015 - Works on the support layers will be carried out in the same time with carriageway repairing ... Standard Chartered Bank, New York, USA, Addr:.