API RP 545 Update & API 650 Monogram Program Update API Tank Conference 2009 Gordon Robertson Senior Standards Associate API Washington, DC

API RP 545 Update • • • • •

Balloted final draft in August 2009 Last Meeting – Full day meeting September 2009 Each comment was discussed and considered All comments resolved (no negative ballots) Published October 5, 2009: Recommended Practice for Lightning Protection of Above Ground Storage Tanks for Flammable or Combustible Liquids • API only document (no final EI endorsement) • RP 545A Culham Research Reports (October 6, 2009)

API RP 545 Update 1 Scope  

Replaces the requirements of API 2003 regarding lightning protection of aboveground storage tanks. Provides guidance and information on lightning protection in order to assist owners/operators in securing lightning protection for tanks.

Applicability  

Applicable to internal and external floating roof tanks as described in API 650. Does not and cannot provide complete protection for all possible lightning strike occurrences.

2 References 3 Definitions (11) definitions)

API RP 545 Update 4 Protection of Specific Types of Tanks 



Fixed Roof Tanks (Metallic) and Tanks with Internal Floating Roofs  No Shunts or Bypass Conductors (use API 650, App H) External Floating Roof Tanks  Bonding between Floating Roof and Shell  Shunts  Shunts consist of an austenitic stainless steel conductor  Submerged at least 0.3 m (1 ft) below the surface of the liquid product  Spaced at intervals no greater than 3 m (10 ft) around the perimeter of the floating roof  Sized at least 20 mm2 (0.031 in.2) cross sectional area minimum width of 51 mm (2 in.) and minimum length to maintain contact to floating roof

API RP 545 Update 

Bypass Conductors (Number, Length and Electrical Resistance)  

 

Used for conduction of the intermediate and long duration component of lightning-stroke current Be evenly spaced not more than every 30 m (100 ft) around the tank circumference with a minimum of two Be of the minimum length necessary to permit full movement of the floating roof Maximum end-to-end electrical resistance of 0.03 ohms

API RP 545 Update 

Parallel Conducting Paths (Seal Assembly from the Floating Roof Tank)  Any non-fully submerged conductive seal assembly components including springs, scissor assemblies, seal membranes, etc., shall be electrically insulated from the tank roof.  Insulation level shall be rated 1kV or greater.  Allows any lightning discharge current from the floating roof to the tank shell to take the preferential path through the shunts and bypass conductors.

API RP 545 Update 5 Metal Thickness for Tanks 

Refers to API 650 and 653

6 Inspection and Maintenance  

Refers to API 653 requirements SCAST members agreed to take out agenda item to improve applicable section of API 653

API RP 545 Update Informational Annexes A. Phenomenon of Lightning and Secondary Effects on Tanks  summarizes the present knowledge on the lightning flash process and attachment mechanism.

B. Understanding Lightning Discharge and its Secondary Effects  Flammable Vapors and Ignition

C. Different Seal Types (3)  Mechanical shoe, liquid mounted, vapor mounted

API Monogram Program Certification for manufacturers of oil & gas industry equipment and materials (both Upstream and Downstream)     

77 API standards 3000 Licensees 4800 Licenses 125 Auditors 72 Countries

API Monogram Program  Licensed Manufacturer must have:  Management System in accordance with API Spec Q1  Demonstrated manufacturing capability to meet product specification

API Monogram Program  Audits Performed by Qualified Contract Auditors  QMS & technical experience  Based on qualification, proximity and availability

 Audit Report  Quality management system meets API Spec Q1 (TS 29001)  API Product Specification questions and references

 API Staff Prepares Final Report  Auditee implements corrective actions & responds to API  API staff accepts corrective actions (may have to re-audit)  License issuance approved by API Panel (Standards & Certification Staff)

API 650 Monogram Program  Will include monogram for turn-key tank construction (design, manufacture and field erection)  Will include products from API 650 such as plate and roof (must have specific requirements)  Will include a field audit during part of critical field erection and testing processes  Will be more comprehensive than traditional monogram audit

API 650 Monogram Program Status  16 Auditors have been qualified  653 Inspectors will be included in the auditor pool  650 is currently being color – coded 

Over 2000 “Shall” Statements in API 650

 Identify critical areas of manufacture, field erection and testing  Audit will be heavily concentrated on field work  Begin seeking a trial facility first license: 650-0001  Implement in 2009

Thank you! Gordon Robertson American Petroleum Institute 1220 L Street, NW Washington, DC 20005 [email protected] 202-682-8190 http://committees.api.org/standards/index.html

www.api.org

API RP 545 Update -

Oct 5, 2009 - Recommended Practice for Lightning Protection of. Above Ground Storage Tanks for Flammable or. Combustible Liquids. • API only document ...

133KB Sizes 40 Downloads 346 Views

Recommend Documents

api rp 14j pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. api rp 14j pdf.

Seed Generator Minecraft Pc 545
Minecraft Force Op Hack No Survey 1.6.2 .... Free Game Generator Codes on Android phone, Code Generator Hack Minecraft Account With No Survey Video ...

530-545.pdf
ovarian function (Calogero et al., 1998 and Mahdi, 2011). Hormone ... follicle-stimulating hormone (FSH) and luteinizing hormone (LH). ... 530-545.pdf. 530-545.

RP Capital Budgeting.pdf
pasti, seperti Payback Period, Net Present Value, Profitability Index dan Internal Rate of Return. Selain itu juga dikenalkan keberadaan resiko dalam suatu ...

Roads API
Cost savings could include more accurate expenses reimbursements. Also if you want con- sistent distance reporting for the same route (e.g. a cycling app to.

RP SIP PDF.pdf
Sign in. Page. 1. /. 21. Loading… Page 1 of 21. Page 1 of 21. Page 2 of 21. Page 2 of 21. Page 3 of 21. Page 3 of 21. RP SIP PDF.pdf. RP SIP PDF.pdf. Open.

Political Violence PLS 445-545 (Spring 2016).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Political ...

OBST 520 RP - Scripted Genius
Dec 8, 2013 - “can seem like listening to one side of a phone conversation or reading an e-mail ... “understanding the relevant aspects of the social atmosphere as the authors and the audience of .... how the translation best fits. ... William D.

modern digital electronics-RP JAIN.pdf
Page 3 of 159. modern digital electronics-RP JAIN.pdf. modern digital electronics-RP JAIN.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying modern ...

Directions API
Takes traffic congestion and flow into account to determine the optimal route. ... Improve customer service ... CUSTOMERS WHO USE DIRECTIONS API ... or to learn more about how customizing Google Maps can impact your business,.

JtfO - RP-Finale Stuttgart_170126215729.pdf
73733 Esslingen. zu erreichen mit: S1 Station Esslingen/Mettingen ... September 2017 in Berlin statt. V. Meldung ... JtfO - RP-Finale Stuttgart_170126215729.pdf.

RP 9 - notice homeless students.pdf
Biddeford School Department. Liaison for ... Biddeford, Maine 04005. (207) 282-8280. RP 9 (revised 7/15). Page 1 of 1. RP 9 - notice homeless students.pdf.

Places API
The Google Places API for Android can provide a great Autocomplete experience for address entry in your mobile application. Places API. Improved customer ...

API - GitHub
Dec 5, 2014 - •http://www.thoughtworks.com/insights/blog/rest-api- ... Slim http://coenraets.org/blog/2011/12/restful-services-with-jquery-php-and- ... Page 24 ...

Expandable Ads API
Jan 12, 2009 - 2 How to Test a GCN Expandable Ad. How to Create a GCN ... Create a new HTML file, called creative1.html, with the following contents: 2.

25557_Irigasi Rp 4.880 juta.pdf
25557_Irigasi Rp 4.880 juta.pdf. 25557_Irigasi Rp 4.880 juta.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 25557_Irigasi Rp 4.880 juta.pdf.

RP Handbook 17-18 pdf.pdf
student. ANTI-HARASSMENT​ ​POLICY. Greencastle Schools will vigorously enforce its prohibition against harassment based. on but not limited to,​ ​sex, race, ethnicity national origin, religion, disability, or physical. attributes. IMPORTANTâ€

RP Mailing List 2017.pdf
Page 1 of 18. March 23, 2017 Active Reporting Parties QFAIRCHILD. Page 1 of 18. 59. 30. 50. 144. 115. 1773. 678. 3303. ID. Blue Mountain Energy, Inc (Deserado) (COAL). Bowie Resources (COAL). Colowyo Coal Co (COAL). Elk Ridge Mining and Reclamation L

MA6451 RP- By EasyEngineering.net.pdf
6 Binomial distribution 18. 7 Poisson distribution 21. 8 Geometric distribution 25. 9 Uniform distribution 27. 10 Exponential distribution 29. 11 Gamma distribution 31. UNIT II. TWO –DIMENSIONAL RANDOM VARIABLES. 11 Introduction 37. 12 Joint distri

digital electronics rp jain pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Math 7.RP.1.pdf
Page 1. Whoops! There was a problem loading more pages. Retrying... Math 7.RP.1.pdf. Math 7.RP.1.pdf. Open. Extract. Open with. Sign In. Main menu.

EHRC RP Intervention FINAL.pdf
Page 1 of 10. 1. APPLICATION NO 38245/08. IN THE EUROPEAN COURT OF HUMAN RIGHTS. BETWEEN: RP. Applicant. -and- UNITED KINGDOM. Respondent. THE EQUALITY AND HUMAN RIGHTS COMMISSION. Intervener. SUBMISSION ON BEHALF OF THE INTERVENER. INTRODUCTION. 1.