BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City
NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:
DATE
TIME FEEDER
Jan 29 Mon
Jan 30 Tue
Jan 31 Wed
Feb 1 Thu
Feb 2 Fri
NOTES:
9AM to 5PM
9AM to 5PM
AREAS AFFECTED
PURPOSE
EST. NO. OF CONS. AFFECTED
BC029039 Trans Cut-out
La Trinidad: Lower Kesbeng, Poblacion
- Replacement of secondary rotten pole. - Right of Way (ROW) clearing.
15
B010908 Trans Cut-out
Tuba: Nangalisan (near Hydro/Plant 3)
Extension of Primary Line
22
B011190 Trans Cut-out
Baguio City: Parts of Pinsao Proper and parts Sunny side Fairview
Rehabilitation of lines.
75
Feeder 07
B001605 Trans Cut-out
Baguio City: Parts of Bado Dangwa Street, Cresencia - Rerouting of secondary lines. Village - Right of Way (ROW) clearing
Feeder 09
B0029923 Trans Cut-out
Tublay: Sitio Kilo, Caponga
Rehabilitation of secondary line.
22
Feeder 10
B029444 Sectionalizer
La Trinidad: Parts of Wangal, Buyagan (near Coffee Trading Center)
- Relocation of primary pole - Right of Way (ROW) clearing
43
Feeder 03
TB01498 Sectionalizer
Tuba: Parts of Nangalisan (near Nangalisan Elementary School)
Extenstion of Primary Line
35
Feeder 11
IT00576 Sectionalizer
Itogon: Baayan, Ucab
- Tapping of newly extended primary line. - Secondary line uprating.
167
Feeder 05
B000007 Sectionalizer
Baguio City: Parts of North Sanitary Camp
- Relocation of primary pole. - Right of Way (ROW) clearing.
125
Feeder 03
B031388 Trans Cut-out
Baguio City: Purok 2, Ambayao Road, Irisan
Extension of secondary lines (rehabilitation)
28
B000994 Trans Cut-out
Baguio City: Parts of Amparo Height, Camp 7
Relocation of secondary pole.
23
BC03076 Trans Cut-out
Baguio City: Parts of Loakan Proper and parts of Loakan-Liwanag
Upgrading of Distribution transformer.
68
La Trinidad: Parts of Central Tawang (near Tawang Barangay Hall), Tawang
- Relocation of primary pole. - Right of Way (ROW) clearing
Feeder 09
9AM to 5PM
EQUIP'T REF. OF DE-ENERGIZED AREA
Feeder 03
9AM to 5PM
Feeder 13
9AM to 5PM
Feeder 09
LT02559 Hot Line Clamp
88
172
1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:
MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. Open. Extract. Open with. Sign In. Main menu.
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy â Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.
I am sending a class list home for valentines. Please note no food/candy ... Wear your Super Bowl Gear or Colors! ... seeing some everyone dressed up for the game! Book Bingo ... HBB Cafeteria for a night of games, fun and books! Admission ...
protected areas by the city councils as scenic walkway s. andcommunity reserv es. I had the priv ilege of v isiting these areas and walk long. distances in total solitude without a soul in sight. I could. also attend weekly birdwatching trips organiz