School Facilities Division

2017 Annual Report and 2019-20 Biennial Budget Request

September 2017

Table of Contents Page # Table of Contents Executive Summary - Tab 1 Executive Summary Financial Reports - Tab 2 School Facilities Commission Financial Report School Facilities Department LSO Report 2017 Major Maintenance Report School Facilities Division Emergency Facility Needs School Facilities Division B-11 Report School Facilities Division Closed / Demolished / Disposed Buildings School Facilities Division New Schools Opened Cash Flow Report - Tab 3 SFD Annual Capital Expenditures Population Trends - Tab 4 Enrollment Trends for the State of Wyoming - Summary & Graph Needs Indices 2013 - Tab 5 Capacity, Condition and Component 2017 SFD Prioritized Capacity List 2017 Education FCI & FCNI 2017 Support Facilities Condition Index 2017 District Component Request Project Cost Budgeting - Tab 6 Wyoming School Facilities Appropriation Sequence Wyoming School Facilities Appropriation Flow Chart Project Cost Budgeting Example Capital Project - SFD Budget Worksheet New Construction Project Bids & Average Cost Per Square Foot 2019-20 Biennial Budget Considerations - Tab 7 Budget Considerations Cover SFD Capital Projects By Priority Totals SFD Capital Projects By Priority Other Budget Considerations - Tab 8 SFC Amendment to Budget Recommendations - Sublette County School District No. 9 – Big Piney Middle School SFC Amendment to Budget Recommendations - Crook County School District No. 1 – Moorcroft K-8 School District Request - Sheridan County School District No. 3 – Bus Barn

1-3 4 - 22 23 - 32 33 34 35 36 - 40 41 42 43 - 44 45 46 47 - 52 53 - 55 56 - 58 59 60 61 - 62 63 64 65 66 67 - 91 Amendment # 1 Page 1 of 1 Amendment # 2 Page 1 of 1 Page 1 of 1

Executive Summary School Facilities Budget Request and Annual Report In compliance with Wyoming statutes, this report provides the governor, Select Committee on School Facilities, Joint Appropriations Committee, School Facilities Commission (SFC), school districts and citizens of Wyoming with a comprehensive budget and report on agency/division operations. The 2019-2020 Biennial Budget Considerations document is consistent with previous proposals. The annual report has been organized by population trends, project cost budgeting, needs indices, financial reports, the budget request and a cash flow report. These budget considerations propose an asset preservation strategy. They will positively impact a greater number of districts and maximize the state’s financial investment at a time when financial resources are scarce. The School Facilities budget request is composed of the following categories: 1. Operations - Budget: $6,754,541 - Description: State Construction Department’s School Facilities Division (SFD) operating expense to allow the division to comply with statutory and legislative requirements. 2. Engineering and Technical - Budget: $2,050,000 - Description: To carry out statutory requirements including but not limited to 21-15118 (value engineering), 21-15-123 (contract compliance audit) and other consulting expenses. 3. Major Maintenance - Budget: $141,315,000 - Description: Major building and facility repair and replacement payments per W.S. 21-15-109. This requested amount is higher than the 2017-18 biennial budget due to the variables utilized in calculating the amount (RS Means numbers, student population and allowable square footage). 4. Charter School Leases - Budget: $1,002,004 - Description: Per W.S. 21-3-110(a)(x)(A) requires these be paid annually. This biennial budget consideration has the lease amount calculated to fund the full biennium. 5. Leases 5.1 Land Lease - Budget: $4,600 - Description: Laramie County School District No. 1 Prairie Wind ES land lease. 5.2 Modular leases - Budget: $157,470 - Description: Laramie County School District No. 1 ongoing contractual responsibilities in order to address individual and triad boundary school capacity. These modulars have already been appropriated previous capital funds for installation. SFD is recommending the leases continue until the district determines the outcome of the implementation of its reconfiguration and boundary adjustment plan.

Page 1 of 91

6

7

8

9

10

11

12

13

Modular Lease Demolition - Budget: $56,100 - Description: These modulars were previously appropriated capital funds to address capacity needs. The capacity issue has been reduced to a level less than low priority per SFC policy 2013-20 of 82.19% therefore eliminating the need to continue the modular leases. Emergency - Budget: $5,000,000 - Description: Due to 2016 Laws, Chapter 31, Section 300 the SFC is no longer allowed to utilize unobligated funds to address emergency issues. These funds are proposed to provide the SFC funds to address emergencies in accordance with W.S. 21-15-120 Emergency facility needs. Capacity - Budget: $0.00 - Description: This year’s annual report has one high priority capacity project per SFC policy 2013-20 which is Rock Springs High School in Sweetwater County School District No. 1. Due to the number of seats needed being only 22, the district and SFD are not recommending funding for a capital project, but they are exploring medium term strategies that are in the best financial interest of the state and are the most cost effective in order to deliver quality educational services. Condition - Budget: $1,605,505 - Description: Proposed funding to address facilities that have a high facility condition index (FCI) score. Condition / Commission Directed Component Funding - Budget: $26,481,780 - Description: As the state transitions from a capital construction strategy to an asset preservation strategy, it is imperative to maintain the assets at a consistent level. These funds would be directed to specific components that are driving the facility condition index (FCI) score to be high thus reducing the score and preserving the asset for a longer period of time. District Component Funding - Budget: $9,957,893 - Description: Proposed projects that have been submitted by districts in accordance with the SFC’s methodology to allow districts to address deferred maintenance needs that are in excess of the funding generated by districts’ major maintenance payments. Planning - Budget: $300,000 - Description: Allotment of funds to study changing student demographics, varying capacity scenarios in districts as determined by October WDE enrollment data and other projects as determined by the SFC. Security - Budget: $0.00 - Description: In the 2014, WYO. SESS. LAWS, CH. 82, SEC. 1(E)(IX) the Legislature appropriated $9,000,000. To date the districts have expended $1,709,017. Due to the $7,290,983 balance remaining, no additional funding is being requested.

Page 2 of 91

14 Demolition - Budget: $3,136,048 - Description: Requesting funding to demolish facilities due to condition or a reduction in capacity needs. 15 Tracks - Budget: $194,979 - Description: Sheridan County School District #3 currently does not have a track facility. These funds would be used to design and construct an outdoor physical education teaching station and track facility. 16 Land Opportunity - Budget: $750,000 - Description: Funds to purchase land for districts when land opportunities become available. 17 Unanticipated - Budget: $2,503,938 - Description: Unanticipated funds allow the SFC to account for unforeseen expenses or cost overruns on projects. The proposed value for unanticipated is calculated at 6%. The budget request addresses component systems which have a high probability of encountering unknown variables or impacting other systems during the design and construction phase. While these budget requests for K-12 school projects total $201,269,858, the SFD and SFC recognize the budget climate with the downturn in the economy. The intent is to provide policymakers a “budget considerations” format with sufficient information for deliberating the priorities and program funding for the 2019-2020 biennial budget.

Page 3 of 91

Page 4 of 91

Page 5 of 91

Page 6 of 91

Page 7 of 91

Current Period: June 1 ‐ June 30, 2017

SCHOOL FACILITIES COMMISSION

Commission Meeting: July 2017 REPORT: July 2002 through "Current Period"

UN-ANTICIPATED APPROPRIATIONS SUMMARY REPORT (B) (C) (D) (E)

(A)

REVERSIONS/ TRANSFERS

APPROPRIATIONS

NET APPROPRIATIONS

EXPENDITURES CURRENT PERIOD

(F)

EXPENDITURES TO DATE (including current)

BALANCE NOT EXPENDED

(C=A+B) FY2013-FY2014 FY2015-FY2016 FY2017-FY2018

$

$

29,635,614 24,995,835 1,771,760 56,403,209

$

$

(19,918) $ (59,122) (79,040) $

29,615,696 24,936,713 1,771,760 56,324,169

(F=C-E) $

251,718 $ 50,395 302,113 $

$

23,710,855 15,086,846 38,797,702

$ $ $ $

5,904,840 9,849,866 1,771,760 17,526,467

SUMMARY REPORT FOR PROJECTS OBLIGATED WITH UN-ANTICIPATED ACCOUNT FUNDING 2013-2014 Beginning Balance for Un-Anticpated Account $ Date of Commission Meeting Transaction was Approved 7/19/2012 7/19/2012

DISTRICT NAME

SCHOOL NAME

Project Number

PROJECT DESCRIPTION

TRANSACTION DESCRIPTION

Douglas ES

10CON12D

Design

District requesting additional funding for new entryway and drop off.

Campbell #1

Wagonwheel ES

11CAM156

Renovation

Classroom addition and HVAC upgrade.

(402,759.00)

07/19/12 Sub-Total

(436,159)

Laramie #1

Arp ES

13LAR14M

8/23/2012

Sublette #9

Big Piney ES

13SUB91C

8/23/2012

2012_CAPSTUDY

N/A

2012_CAPSTUDY

11CAR10M

District requesting to purchase Modular Classroom for Purchase Modular Classroom the Arp ES site due to capacity issues. Additional funding for new Big Additional funding required for alternate bid for sunshades & landscaping. Piney ES Additional funding requested for studies for Big Horn #3;Campbell #1; Fremont #25; Natrona #1; Park #6 Statewide assessments School Distrits.

08/23/12 Sub-Total 9/20/2012

Carbon #1

Modular Lease @ Rawlins ES

9/20/2012

Fremont #14

Demolition of Bus Barn

13FR143X

9/20/2012

Sublette #9

Big Piney ES

13SUB91C

9/20/2012

Teton #1

New Central Admin. Office 11TET102

District is requesting to extend their current modular One year modular lease. lease for one year. District is requesting to funding to demolish 9,000 Demolition of Bus Barn square foot Bus Barn located at Indian ES site. Installation of the natural gas District is requesting to funding for installation of the and electrict service to the new natural gas and electrict service to the new Big Piney ES. Big Piney ES. Construct new Central Admin. District is requesting additional funding to construct the new Central Admin. Building. Office.

09/20/12 Sub-Total 10/18/2012

Big Horn #4

Bus Barn

13BIG41X

Demo 4th Street Bus Barn and District is requesting funds to Demo existing Bus Site Reclamation Barn.

11/15/2012

Laramie #1

New Goins ES

11LAR102

Demolition and Replacement - Fund request for a traffic study, asbestos abatement, Goins ES air monitoring and FF&E

12/19/2012

Laramie #1

Prairie Wind ES

13LAR11L

12/19/2012

Laramie #1

Arp ES Land

13LAR13L

Prairie Wind ES Land Lease Site required to provide adequate acreage for potential new school

13LAR14P

Planning Funds for ES in East Triad

10/18/12 Sub-Total

Laramie #1

TBD

New Granger ES

Weston #1

Newcastle ES

Planning Funds for ES in East Triad

-

-

-

(850,000.00)

(884,754)

-

-

-

-

(15,540.00)

-

-

(133,128.00)

-

-

(41,816.90)

-

-

(226,120.00)

-

-

(416,604.90)

-

-

(189,664.00)

-

-

(189,664.00)

-

-

(62,014.95)

-

-

(8,303.82)

-

(13,795.51)

-

-

(45,000.00)

-

-

(45,000.00)

-

-

No requests approved

-

-

-

02/21/13 Sub-Total

-

-

-

(773,386.00)

-

-

(773,386.00)

-

-

(100,000.00)

-

-

(90,000.00)

-

-

(210,000.00)

-

-

Installation and lease of modular unit Design additional 3,391 sq. ft. for cultural language classrooms

13FR142D

-

(7,000.00)

-

Request for unanticipated funds for the installation and lease of modular unit for a student enrolling for the school year beginning August 2013 - lease up to 3 years @ $2,500.00 per month Request for unanticipated funds for the design of an additional 3,391 sq. ft. for cultural language classrooms

Wyoming Indian K-5 ES

(27,754.00)

Survey and Plat land adjacent to Arp ES

13WES102

Fremont #14

-

-

-

Request for unanticipated funds for design and Construction to provide a private shower and restroom

4/17/2013

-

-

-

Design and Construction to provide a private shower and restroom

13SWE10M

-

-

-

Construction of New Granger ES

Newcastle ES

TRANSFER (OUT) CURRENT PERIOD 2017-2018

-

11SWE21C

Weston #1

(33,400.00)

1,771,760

(5,491.69)

Construction of New Granger ES

4/17/2013

TRANSFER (OUT) CURRENT PERIOD 2015-2016

$

(62,014.95)

03/21/13 Sub-Total 4/17/2013

2017-2018 6,481,277

11/15/12 Sub-Total

01/16/13 Sub-Total

Sweetwater #2

2015-2016* $

Request for land lease for new Prairie Wind ES

12/19/12 Sub-Total

3/21/2013

TRANSFER (OUT) CURRENT PERIOD 2013-2014

Converse #1

8/23/2012

1/16/2013

23,154,337

Page 8 of 91

Date of Commission Meeting Transaction was Approved

4/17/2013 4/17/2013

4/17/2013

DISTRICT NAME

Fremont #21

Goshen #1

Laramie #1

SCHOOL NAME

Ft. Washakie K-8 ES/MS

Project Number

13FR211D

Lingle-Ft. Laramie ES - K12 Prod Kitch. 13GOS12D 13LAR15M, 13LAR16M, 13LAR17M, 13LAR101, 13LAR18M, 13LAR19M, 13LAR10M, 13LAR11M, 13LAR12M, 13LAR13M, District Wide 13LAR102

PROJECT DESCRIPTION

TRANSACTION DESCRIPTION

Design additional 4,655 sq. ft. Request for unanticipated funds for the design of an for cultural language and dance additional 4,655 sq. ft. for cultural language and dance classrooms classrooms Design additional 4,369 sq. ft. Request for unanticipated funds for the design of an for a production kitchen and additional 4,369 sq. ft. for a production kitchen and enlarged dining area enlarged dining area

Uinta #4

Mtn. View MS Modular #1 10UIN45M

5/16/2013

Fremont #25

Rendezvous ES Modular

13FR250M

5/16/2013

Fremont #2

Dubois HS K-12

13FRE22C

5/16/2013

Laramie #1

New 5-6 ES Prototype East Triad 13LAR14D

5/16/2013

Natrona #1

North Casper ES Modular

13NAT152

5/16/2013

Sublette #9

Big Piney ES

13SUB91C

Request from unancitipated fund to lease this modular Lease modular classroom unit for 1 additional year Request from unanticipated fund to lease modular unit for 3 years to address capacity issue at elementary Lease modular classroom level New Dubois HS K-12 Request from unanticipated for additional construction Construction monies Request from unanticipated for planning funds for new New 5-6 ES Prototype East 5-6 ES prototype in east triad - per settlement Triad agreement Relocate modular from central Request from unanticipated funds to relocate modular admin to old North Casper ES from Central Admin Office to old North Casper ES site site Demo and Construct New Big Request from unanticipated fund for additional Piney ES asbestos abatement

05/16/13 Sub-Total 6/20/2013

Fremont #25

Rendezvous ES (4-5)

13FR2502

6/20/2013

Sweewater #2

Granger ES (New)

11SWE21C

6/20/2013

Uinta #1

Evanston MS (6-8)

13UIN153

Request from unanticipated fund for budget shortfall Construction of Rendezvous ES on the construction of a security vestibule at security vestibule Rendezvous ES Construction of new Granger Request from unanticipated fund for installation of ES utilities at the new Granger ES Abatement, Design and Request from unanticipated fund for the abatement, replacement of the Evanston Design and replacement of the Evanston MS roof MS roof

06/20/13 Sub-Total 7/16/2013

Park #1

Powell MS

11PAR151

7/16/2013

Sheridan #2

Story ES

13SHE21C

TRANSFER (OUT) CURRENT PERIOD 2015-2016

TRANSFER (OUT) CURRENT PERIOD 2017-2018

(220 000.00)

-

-

(250,000.00)

-

-

(1 165 000.00)

-

-

(2,035,000.00)

-

-

(17,000.00)

-

-

(134,925.00)

-

-

(380,711.00)

-

-

(50,000.00)

-

-

-

Request for unanticipated funds for the lease 11 capacity modular facilities Lease 11 capacity modular facilities

04/17/13 Sub-Total 5/16/2013

TRANSFER (OUT) CURRENT PERIOD 2013-2014

Request from unanticipated for Groathouse Constr. Groathouse Constr. Slab sealant Slab sealant Supplement Remodel of Story Request from unanticipated for Supplement Remodel ES of Story ES

(70,000.00)

-

(130,850.00)

-

-

(783,486.00)

-

-

(57,098.00)

-

-

(21 881.24)

-

-

(2,110,395.00)

-

-

(2,189,374.24)

-

-

(22,494.00)

-

-

(674,779.30)

-

-

(118,873.00)

-

-

(224,779.30)

-

-

Completion of WES01 capacity solution for A&E services Supplement Remodel of Story ES

Request from unanticipated for Completion of WES01 capacity solution for A&E services Request from unanticipated for Supplement Remodel of Story ES Request from unanticipated to Complete construction Request from unanticipated for Full design, construct admin, commissioning & owners rep Request from unanticipated for Lease modular for one additional year

(142,746.00)

-

-

(894,072.00)

-

-

(15,540.00)

-

-

(366,509.00)

-

-

7/16/2013

Weston #1

Newcastle ES

13WES10D

7/16/2013

Sheridan #2

Story ES

13SHE21C

7/16/2013

Johnson #1

New Cloud Peak ES

13JOH11C

7/16/2013

Fremont #21

New Ft. Washakie HS

13FR212D

7/16/2013

Carbon #1

Rawlins ES Modular

11CAR10M

Complete construction Full design, construct admin, commissioning & owners rep Lease modular for one additional year

7/16/2013

Campbell #1

Westwood Alt. HS

13CAM10C

Fund unfunded balance

Request from unanticipated to Fund unfunded balance

(2,459,792.60)

-

-

Big Horn #3

Two Modulars @ Greybull 13BIG30M ES 13BIG31M

Lease two modular units

Request from unancitipated fund to lease two modular units

(250,000.00)

-

-

08/22/13 Sub-Total

(250,000.00)

-

-

07/16/13 Sub-Total 8/22/2013

9/19/2013

Big Horn #3

Greybull MS

13BIG30D

9/19/2013

Big Horn #4

Laura Irwin ES

13BIG40D

Funds to reimburse Major Maintenance for expenses incurred for Southridge ES swing space @ Westwood ES General construction of the new Lyman admin/warehouse building Additional funding for the addition/gym renovation to Greybull MS Funding for design of new Laura Irwin ES

13LAR103

Replace modular destroyed in fire

9/19/2013 9/19/2013

Natrona #1

Westwood ES

13NAT154

Uinta #6

New Lyman Admin Building

13UIN642

10/17/2013

Laramie #1

10/17/2013

Washakie #1

Aquatic Center

13WAS11X

10/17/2013

Sweetwater #1

New K-4 ES

13SWE15D

10/17/2013

Lincoln #2

Thayne ES

13LIN20D

10/17/2013

Johnson #1

Cloud Peak ES

11JOH10C

11/20/2013

Sweetwater #2

Future Alt. School Property (Church) 13SWE20L

Modular @ Arp ES

Request for unanticipated funds to reimburse Major Maintenance for expenses incurred for Southridge ES swing space @ Westwood ES Request for unanticipated funds for the general construction of the new Lyman admin/warehouse building

(780 062.00)

-

-

(1,193,495.60)

-

-

Request for unanticipated funds for the addition/gym renovation to Greybull MS Request for unanticipated funds for the design of the new Laura Irwin ES on a new site

(396,799.00)

-

-

(1,358,134.00)

-

-

09/19/13 Sub-Total

(3,728,490.60)

-

-

(109,500.00)

-

-

Request for unanticipated to replace modular destroyed in fire @ Arp ES Request for unanticipated for additional costs in Additional costs for demolition Aquatic Center Demolition Move forward with planning & Request for unanticipated to move forward with design planning & design of new K-4 ES Request for unanticipated to move forward with Move forward with design design of Thayne ES Request for unanticipated for project change order @ Project change order Cloud Peak ES

10/17/13 Sub-Total Land purchase for future alt. school

Request for unanticipated to purchase church property for future alternative school

(50,000.00)

-

-

(670,826.00)

-

-

(194,537.00)

-

-

(43,832.00)

-

-

(1,068,695.00)

-

-

(425,000.00)

-

-

Page 9 of 91

Date of Commission Meeting Transaction was Approved

11/20/2013

DISTRICT NAME

SCHOOL NAME

Natrona #1

Southridge ES

11/20/2013 11/20/2013

Project Number

PROJECT DESCRIPTION

10NAT12D

Design new Southridge ES

Weston #1

New Bus Barn Fueling Station

13WES101

Construction of new fueling station

Crook #1

New Sundance ES

13CRO11D

Design new Sundance ES

12/18/2013

Uinta #1

12/18/2013

Evanston MS

13UIN11C

Renovation of Evanston MS

Campbell #1

South HS

13CAM12D

South HS addition

1/23/2014

Laramie #1

New 5-6 ES Prototype East Triad 13LAR15D

1/23/2014

Hot Springs #1

District Storage #4

11HOT15X

1/23/2014

Laramie #1

11LAR101

1/23/2014

Fremont #25

Prairie Wind ES Rendezvous ES (3-5) Modular #2 & #3

TRANSACTION DESCRIPTION

Big Horn #4

3/20/2014

Albany #1

3/20/2014

Big Horn #3

Future Laura Irwin ES K-5 13BIG40D Montessori Charter School building 13ALB101 Greybull MS/HS Aquatic Center (Swimming Pool) 11BIG351

3/20/2014

Natrona #1

North Casper ES

13NAT10M

3/20/2014

Natrona #1

Park ES

13NAT11M & 13NAT12M

3/20/2014

Carbon #2

Encampment K-12

13CAR251

4/24/2014

Park #16

13PA1651

-

-

-

-

11/20/13 Sub-Total

(1,846,823.00)

-

-

(280,847.00)

-

-

Request for unanticipated for construction administration for renovation of Evanston MS Request for uanticipated to move forward with planning & design of the South HS addition

Reverse the action taken in the September 2013 Design funds for new Laura commission meeting to allot $1,358,134 from 11-12 Irwin ES K-5 unanticipated Lease payments in the 2013 & Request from unanticipated funds for lease payments 2014 school year in the 2013 & 2014 school year Demolition of the Greybull Request from unanticipated funds for the demolition MS/HS Pool of the aquatic center (swimming pool) Modular classroom unit @ Request for unanticipated funding for a modular North Casper ES classroom unit @ North Casper ES Modular classroom unit @ Park Request for unanticipated funding for a modular ES classroom unit @ Park ES Phase out T12 lights, replace Unanticipated funds for the Encampment K-12 HVAC controls with digital lighting & controls project

Gymnasium renovation

-

-

03/20/14 Sub-Total

Meeteetse ES/MS/HS (K12) Gym

(95 500.00)

(100,000.00)

Planning & Design new 5-6 ES Request for unanticipated to move forward with in East Triad planning & design of the new 5-6 ES Request for unanticipated for demolition of storage Demo storage bldg #4 building #4 Construction for new Prairie Request for unanticipated for general construction of Wind ES Prairie Wind ES Lease Modular Classroom #2 & Request for unanticipated to lease two modular #3 classrooms @ Rendezvous ES

4/1/2014

TRANSFER (OUT) CURRENT PERIOD 2017-2018

(1,226,323.00)

01/23/14 Sub-Total 3/20/2014

TRANSFER (OUT) CURRENT PERIOD 2015-2016

Request for unanticipated for additional design funds for architect to continue work on Southridge ES Request for unanticipated to reimburse the districts major maint. Account for expenses incurred on the fueling station project Request for unanticipated to move forward with planning & design of the new Sundance ES

12/18/13 Sub-Total

13FR251M & 13FR252M

TRANSFER (OUT) CURRENT PERIOD 2013-2014

(926,994.00)

-

(1,207,841.00)

-

-

(723 586.00)

-

-

(21,428.00)

-

-

(660,000.00)

-

-

(269,850.00)

-

-

(1,674,864.00)

-

-

1,358,134.00

-

-

(52,944.92)

-

-

(34,453.00)

-

-

(170 915.00)

-

-

(296,479.00)

-

-

(767,531.00)

-

-

35,811.08

-

-

Reimburse The Amounts Appropriated For The Unanticipated Costs Associated With The Design, Construction And Component Level Projects Funded Under 2013 Wyoming Session Laws, Chapter 129, Section 1(B)(Viii) Appropriation

6,481,277.00

(6,481,277.00)

-

04/01/14 Sub-Total

6,481,277.00

(6,481,277.00)

-

Request for unanticipated funds for phase 1 of the Gymnasium renovation

04/24/14 Sub-Total

(235 447.00)

-

-

(235,447.00)

-

-

5/23/2014

2014 Budget Session, 15-16 Biennial Budget Unanticipated Approp. - 2014, Wyo. Sess. Laws, Ch. 82, Sec. 1(e)(xi) & 2014, Wyo. Sess. Laws, Ch. 82, Sec. 1(e)(x)

-

18,414,096.00

-

05/23/14 Sub-Total

-

18,414,096.00

-

6/26/2014

11CAR151 & 11CAR152

Demo of Mtn. View ES & Pershing ES

Emergency declared for the completion of asbestos removal projects for Pershing ES & Mtn. View ES (Executive Session)

13FR250D

Planning and Design for new Willow Creek ES on new site

Request for unanticipated to continue with design of Willow Creek ES

6/26/2014

6/24/2014 6/26/2014

Carbon #1

Fremont #25

Mtn. View ES & Pershing ES

Willow Creek ES (New)

Sublette #9

Big Piney HS (9-12)

9SUB9530

Albany #1

Indian Paintbrush ES Modular

13ALB10M

Emergency request for additional funding to continue re-roof project (rejected @ April commission meeting) - approved in executive committee June meeting

Big Piney HS Re-roof Modular for Indian Paintbrush Request for unanticipated for Modular for Indian ES (Moving modular from Paintbrush ES (Moving modular from FRE21) FRE21)

06/26/14 Sub-Total

7/21/2014

Natrona #1

Westwood ES (Temp Swing Space) 13NAT154

Funds to reimburse Major Maintenance for expenses incurred for Southridge ES swing space @ Westwood ES Funds to reimburse Major Maintenance for expenses incurred for Southridge ES swing space @ Westwood ES Constr - Greybull MS Addition/Renovation

7/21/2014

Natrona #1

7/22/2014

Big Horn #3

Westwood ES (Temp Swing Space) 13NAT154 Greybull MS Gym & MS 68 15BIG30C

8/25/2014

Sublette #9

SUB09 BIG PINEY HS (912) 9SUB9530

Big Piney HS Re-roof

8/25/2014

Sublette #9

8/25/2014

Fremont #14

SUB09 BIG PINEY MS (68) 13SUB92C FRE14 WYOMING INDIAN ES K-5 13FR141C

Design & Construction of an addition to Big Piney MS Construction funds for new Wyoming Indian ES

(450,000.00)

-

-

(600,792.00)

-

-

(810,908.00)

-

-

(80,000.00)

-

-

(1,941,700.00)

-

-

-

-

-

-

Moving unanticipated due to commission not declaring emergency for this request 780,062.00 Moving unanticipated due to commission not declaring emergency for this request (780,062.00) Request for unanticipated for renovation and addition of Greybull MS

-

(472,032.00)

07/21/2014 Sub-Total

-

(472,032.00)

Emergency request for unanticipated for the Big Piney HS Re-roof Emergency request for unanticipated for the Design & Construction of an addition to Big Piney MS (for special needs student arriving 08/2015) Request for unanticipated for the construction of the new Wyoming Indian ES

-

(635,274.00)

-

-

(334,339.00)

-

-

(1,525,453.00)

-

-

Page 10 of 91

Date of Commission Meeting Transaction was Approved

DISTRICT NAME

SCHOOL NAME

Project Number

PROJECT DESCRIPTION

TRANSACTION DESCRIPTION

08/25/2014 Sub-Total

TRANSFER (OUT) CURRENT PERIOD 2013-2014 (2,495,066.00)

TRANSFER (OUT) CURRENT PERIOD 2015-2016 -

TRANSFER (OUT) CURRENT PERIOD 2017-2018 -

9/22/2014

Laramie #1

ALB01 LARAMIE HS (NEW) 9-12 WES01 NEWCASTLE ES K-5 SWE01 K-4 (ON BLM LAND) (NEW) TET01 CENTRAL ADMIN OFFICE (NEW) LAR01 GOINS ES (NEW REPLACEMENT SCHOOL) K-6

9/22/2014

N/A

N/A

Sweetwater #2

SWE02 Church Building (Expedition Academy) 9-12 13SWE20L

N/A Purchase Church Property (Land & Building) for Alternative School (New)

NAT01 North Casper ES Modular (Moved from Central Admin Space) K-5 13NAT152 FRE25 Rendezvous ES (35) 13FR2502

Relocate modular unit located at Central Admin area to old North Casper ES Site Security Vestibule at entry of Rendezvous ES

17,347.71

-

-

Project Complete & Closed, remaining funds taken back to unanticipated

3,289.00

-

-

FRE14 Wyoming Indian ES Bus Barn (Demolished) 13FR143X BIG04 4th Street Bus Barn (Demolished) 13BIG41X

Demolition of Bus Barn located Project Complete & Closed, remaining funds taken back to unanticipated at Wyo Indian ES site

44,648.00

-

-

Project Complete & Closed, remaining funds taken back to unanticipated

98,653.00

-

9/16/2014

Albany #1

9/16/2014

Weston #1

9/16/2014

Sweetwater #1

9/22/2014

Teton #1

9/22/2014

9/22/2014

Natrona #1

9/22/2014

Fremont #25

9/22/2014

Fremont #14

9/22/2014

Big Horn #4

Construction - Laramie High School

11TET102

Construction - Newcastle ES Construction - New ES Prototype (K-4) on blm land New Central Admin Office @ John Colter ES Site

Request from unanticipated for additional monies in the construction of the new Laramie HS Request for unanticipated for the construction of Newcastle ES Request from unanticipated for construction of the capacity K-4 ES Project Complete & Closed, remaining funds taken back to unanticipated

11LAR102

Demolition & Replacement of Goins ES

Project Complete & Closed, remaining funds taken back to unanticipated

15ALB10C 15WES10C 15SWE10C

N/A

Demolition of bus barn.

Additional unanticipated funds in WOLFS not budgeted in AiM Project Complete & Closed, remaining funds taken back to unanticipated

Teton #1

New Central Admin. Office 11TET102

10/23/2014

Carbon #1

Rawlins ES Modular #1

10/23/2014

Sublette #9

SUB09 BIG PINEY MS (68) 13SUB92C

10/23/2014

Sublette #9

Big Piney HS (9-12)

12/18/2014

Sheridan #1

SHE01 Tongue River ES (NEW) K-5

12/18/2014

Goshen #1

12/18/2014

Crook #1

1/7/2015

Crook #1

1/7/2015

Washakie #2

1/7/2015

Goshen #1

1/7/2015 2/19/2015

11CAR10M

9SUB9530

Original budget remaining monies had been reverted back to unanticipated. The project manager wasn't Construct new Central Admin. aware that the 11 month walkthrough bill had come Office. through. Monies moved back to cover bill. Request for unanticipated to extend the existing lease of the modular facility at Rawlins ES for one One year lease for modular unit additional year Emergency request for unanticipated for the Design & Construction of an addition to Big Piney MS (for Design & Construction of an special needs student arriving 08/2015) - Moved for 13 addition to Big Piney MS 14 Unantic to 11-12 Unantic

Big Piney HS Re-roof

Emergency request for additional funding to continue re-roof project (rejected @ April commission meeting) - approved in executive committee June meeting Moved for 13-14 Unantic to 11-12 Unantic

10/08/2014 - 10/23/2014 Sub-Total

GOS01 Lingle - Ft. Laramie ES (NEW) K-5 13GOS11C CRO01 Sundance ES (NEW) K-6 13CRO11D

Planning and design for new K5 es on existing 10 acres Construction funds for new Lingle Ft. Laramie ES on same site Planning & design for new Sundance ES

Sheridan #1

CRO01 Sundance ES (New) K-6 WAS02 Ten Sleep ES/MS/HS (K-12) GOS01 Lingle Ft. Laramie ES (New) K-5 SHE01 Tongue River ES (New) K-5

15SHE10C

Construction Sundance ES K-6 Request for unanticipated for Construction Sundance replacement ES K-6 replacement Planning of Ten Sleep K-12 Request for unanticipated for Planning of Ten Sleep renovation K-12 renovation Construction Lingle Ft. Laramie Request for unanticipated for Construction Lingle Ft. ES (New) K-5 Laramie ES (New) K-5 Construction Tongue River ES Request for unanticipated for Construction Tongue K-5 (New) River ES K-5 (New)

Lincoln #2

LIN02 Administration Building (NEW)

13LIN201

Construction of new admin building

13SHE10D

Request for unanticipated funds to cover design budget deficit Request for unanticipated to cover initial construction costs Request for unanticipated funds to cover design budget deficit

12/18/2014 Sub-Total 15CRO10C 15WAS20P 15GOS10C

01/07/2015 Sub-Total Request for unanticipated for construction of new admin building

02/19/2015 Sub-Total 3/3/2015 3/3/2015 3/25/2015

Sweetwater #2 Campbell #1

SWE02 Monroe Intermediate School 5-6 15SWE21C CAM01 New Stocktrail K-6 ES Prototype 15CAM12C

Construction - Monroe Intermediate School 5-6 Renovation Construction - New Stocktrail ES K-6

Request for unanticipated for construction of Monroe Intermediate School 5-6 Renovation Request for unanticipated for construction of new Stocktrail ES K-6 2015 General Session; SF0057, SEC. 1(E)(X)

03/2015 Sub-Total CAR01 Rawlins ES Modular #1

15BIG30C

Campbell #1

BIG03 Greybull MS 6-8 FRE25 Willow Creek ES (New) CAM01 Campbell County HS (South)

15CAM11C

Request for unanticipated to extend modular lease for One year lease for modular unit one additional year Construction Greybull MS Request for unanticipated for construction of Greybul Additiona/Renovation MS Addition/Renovation Construction New Willow Request for unanticipated for construction of New Creek ES Willow Creek ES Construction South HS Request for unanticipated for construction of South Addition/Renovation HS Addition/Renovation

Sublette #9

SUB09 New Big Piney ES

13SUB91C

Construction of New Big Piney Project Complete & Closed, remaining funds taken ES back to unanticipated

4/27/2015

Carbon #1

4/28/2015

Big Horn #3

4/28/2015

Fremont #25

4/28/2015 5/31/2015

11CAR10M

15FR250C

(8,000,000.00)

-

-

(198,638.00)

-

-

(756,284.00)

-

19,155.93

-

-

55,820.86

-

-

32,310.37

-

-

2,788.00

-

-

Project Complete & Closed, remaining funds taken back to unanticipated

09/16/2014 - 09/22/2014 Sub-Total

10/8/2014

-

04/2015 Sub-Total

274,012.87

(8,954,922.00)

-

(9,227.00)

-

-

(15,540.00)

-

-

-

-

-

-

-

-

(24,767.00)

-

-

(71,505.00)

-

-

(800,000.00)

-

-

(107,599.00)

-

-

(979,104.00) -

-

-

(698,893.00)

-

-

(51,600.00)

-

-

(1,526,974.00)

-

-

(2,373,003.00)

-

-

(4,650,470.00)

(336,139.00)

-

(336,139.00)

-

-

(325,791.00)

-

-

(934,621.00)

-

-

6,581,739.00

-

5,321,327.00

(15,540.00)

-

-

-

(280,013.00)

-

(355,598.00)

-

-

(2,810,894.00)

-

(3,446,505.00)

-

(15,540.00) 179,666.90

-

-

-

Page 11 of 91

Date of Commission Meeting Transaction was Approved 5/31/2015

DISTRICT NAME

Uinta #4

SCHOOL NAME

UIN04 Mtn. View MS Modular #1

PROJECT DESCRIPTION

Project Number

TRANSACTION DESCRIPTION

Project Complete & Closed, remaining funds taken back to unanticipated

10UIN45M

Lease Modular Classroom

13NAT17D

Planning & Design for new ES Request for unanticipated for design of new ES

05/2015 Sub-Total 6/18/2015

Natrona #1

6/29/2015

Sweetwater #2

6/29/2015

Laramie #1

6/29/2015

Sweetwater #2

NAT01 K-5 ES (New)

SWE02 Church Building (Expedition Academy) 9-12 15SWE22C LAR01 Meadowlark ES 5-6 (East Triad) New 15LAR10C SWE02 Monroe Intermediate School 5-6 15SWE21C

Building Renovation Construction New ES 5-6 Prototype Construction of Monroe Intermediate 5-6

Request for unanticipated for renovation of Church Building Request for unanticipated for construction of the new ES 5-6 Prototype Request for unanticipated for construction of Monroe Intermediate School 5-6 Renovation

06/2015 Sub-Total 7/22/2015

Insurance funds reimbursed for LAR01 Arp ES Modular that caught fire returned to unanticipated account

07/2015 Sub-Total 13CAR101

New Bus Barn on MS site

Carbon #1

CAR01 Bus Barn (New) CAR01 Rawlins HS 9-12 (New)

13CAR12C

New Rawlins HS 9-12

Laramie #1

LAR01 Freedom ES K-6

15LAR12D

Freedom ES Addition

Request for unanticipated funding for the New Bus Barn on MS site Request for unanticipated funding for the New Rawlins HS 9-12 Request for unanticipated funds for Freedom ES addition

N/A

Closed project funds reverted back to unanticipated account

8/20/2015

Carbon #1

8/20/2015 8/20/2015

08/2015 Sub-Total 10/9/2015

SFD

N/A

N/A

11/2015 Sub-Total 12/14/2015

Sweetwater #2

New Expedition Academy

New Expedition Academy 1149 (Church Renovation)

Closed project funds reverted back to unanticipated account

1050 New Sundance ES

Request for unanticipated monies for water line infrastructure ($295,645.00) re-imbursable back to SFD under recapture

1096 New Pine Bluffs ES 1102 Bar Nunn ES Addition

Request for unanticipated for construction, abatement & swing space Request for unanticipated for modular demolition

12/2015 Sub-Total 2/18/2016

Crook #1

CRO01 Sundance ES (New) K-6

02/2016 Sub-Total 3/4/2016 3/4/2016

Laramie #2

LAR02 New Pine Bluffs ES

Natrona #1

Bar Nunn ES Addition

3/4/2016

Sweetwater #2

New Expedition Academy (Church Renovation)

3/4/2016

Sweetwater #2

Monroe Intermed. Transport. Shop

4/25/2016

Goshen #1

GOS01 Lingle-Ft. Laramie ES (New) K-5

1065 New Lingle Ft. Laramie ES

5/3/2016

Sheridan #2

SHE02 Sheridan HS (9-12) Boiler Bldg

Repair water distribution system at Sheridan HS Boiler 1188 Bldg

New Expedition Academy 1149 (Church Renovation) Monroe Intermediate School Transport. Shop fule tank 1153 relocation

Request for unanticipated funds to cover change orders on project

Request for unanticipated funds for the water distribution system

05/2016 Sub-Total Fremont #14

6/22/2016

Carbon #1

6/23/2016

Sublette #9

6/23/2016

Sweetwater #1

1053 1039 1141 1148

Request for unanticipated funds for construction New Wyoming Indian ES change orders on project Request for unanticipated funds to pay for the Highland Hills ES Modular #1 modular for the next two years Big Piney HS Roof Project Complete & Closed, remaining funds taken Replacement back to unanticipated Stagecoach ES K-4 (on BLM Project Complete & Closed, remaining funds taken Land) back to unanticipated

06/2016 Sub-Total

07/2016 Sub-Total 9/7/2016

Campbell #1

CAM01 Campbell County HS (South) Main Bldg 1012

Request for unanticipated funds for construction change orders on project 1017 South HS Addition/Renovation Jeffrey City ES K-6 Planning 1177 Study

09/2016 Sub-Total Request for unanticipated for Jeffrey City ES K-6 Planning Study

10/20/2016

Fremont #1

FRE01 Jeffrey City ES

12/15/2016

Carbon #1

CAR01 Pershing ES Main Bldg

12/15/2016

Lincoln #2

LIN02 Thayne ES

12/15/2016

Laramie #1

LAR01 Prairie Wind ES

12/15/2016

Carbon #1

CAR01 Mountain View ES

Project Complete & Closed, remaining funds taken back to unanticipated Project Complete & Closed, remaining funds taken 1100 Thayne ES Classroom Addition back to unanticipated Project Complete & Closed, remaining funds taken 1092 New Prairie Wind ES back to unanticipated Project Complete & Closed, remaining funds taken 1034 Mountain View ES Demotion back to unanticipated

SWE01 Black Butte HS

New Independence Alt. HS 1147 (Black Butte)

10/2016 Sub-Total 1035 Pershing ES Demolition

12/2016 Sub-Total 2/22/2017

Sweetwater #1

Request for unanticipated for demolition costs

02/2017 Sub-Total 3/20/2017

2,261.48

-

-

-

-

(365,262.00)

-

-

-

(43,630.00)

-

-

(210 700.00)

-

-

(200,000.00)

-

(454,330.00)

-

(365,262.00) 88 143.61

-

88,143.61

-

-

(250,000.00)

-

-

-

-

(1,500,000.00) (1,750,000.00)

-

(180,752.00)

-

336,454.59 336,454.59

SFC

2017 GS Unanticipated

POT 2017 GS Unanticipated

-

(180,752.00)

-

-

-

2,800.00

-

-

2,800.00

-

(350,645.00)

-

(350,645.00)

-

-

(881,291.00)

-

(45,500.00)

-

(120,000.00)

-

-

(25,937.00)

-

(1,072,728.00)

2017 GS Unanticipated - $1,312,586.00

03/2017 Sub-Total

-

(273,436.00)

-

-

(273,436.00)

-

-

-

(200,930.00)

-

(200,930.00)

-

(247,544.00)

-

-

(31,080.00)

-

-

13,890.91

-

131,723.13

41,245.00

-

(133,009.96)

41,245.00

-

2016 BUDGET SESSION; HB0052, ENROLLED ACT NO. 12, Sect. 1, (g)(iv); UNANTICIPATED $459 174.00

7/1/2016

TRANSFER (OUT) CURRENT PERIOD 2017-2018

Request for unanticipated for construction

04/2016 Sub-Total

6/22/2016

TRANSFER (OUT) CURRENT PERIOD 2015-2016

181,928.38

Request for unanticipated for landscaping & ceiling installation in two classrooms

03/2016 Sub-Total

FRE14 Wyoming Indian ES K-5 CAR01 Rawlins ES Modular K-1 SUB09 BIG PINEY HS (912) SWE01 Stagecoach ES (New)

TRANSFER (OUT) CURRENT PERIOD 2013-2014

-

-

-

-

(491,049.06)

-

(491,049.06)

-

-

(41,054.00)

-

-

(41,054.00)

-

396.91

-

-

31,530.35

-

-

11,683.45

-

-

47,974.26

-

-

91,584.97

-

-

(50,000.00)

-

-

(50,000.00)

-

-

-

-

-

-

-

-

Page 12 of 91

Date of Commission Meeting Transaction was Approved 5/3/2017

DISTRICT NAME

Uinta #1

SCHOOL NAME

UIN01 Evanston MS

Project Number

PROJECT DESCRIPTION Evanston MS Renovation 1156 Addition

TRANSFER (OUT) CURRENT PERIOD 2013-2014

TRANSACTION DESCRIPTION

Request for unanticipated for construction costs

05/2017 Sub-Total Un-obligated Account Balance

TRANSFER (OUT) CURRENT PERIOD 2015-2016

(150,000.00)

-

(150,000.00)

$

1,477,689

TRANSFER (OUT) CURRENT PERIOD 2017-2018

-

-

$

3,814,696

-

$

1,771,760

*FY 2015‐2016 ‐ Unanticipated funding transactions require school facilities commission and governor approval.

Page 13 of 91

Current Period: June 1 ‐ June 30, 2017

SCHOOL FACILITIES COMMISSION

Commission Meeting: July 2017 Report: July 2002 through "Current Period"

CAPITAL CONSTRUCTION TRANSACTIONS SUMMARY REPORT (A) (B) (C) (D) (E) NET NET APPROPRIATIONS TRANSFER IN/(OUT) APPROPRIATIONS PRIOR PERIOD CURRENT PERIOD CURRENT PERIOD ENDING BALANCE ENDING BALANCE Awarded Contracts Cap Con Budgeted Cap Con Unobligated Cap Con

EXPENDITURES FOR CURRENT PERIOD

$ $ $

2,479,432,644 $ 158,940,329 $ $

4,749,043 $ (4,749,043) $ $

(C=A+B) 2,484,181,687 $ 154,191,286 -

$

2,638,372,973 $

-

2,638,372,973 $

$

(F)

EXPENDITURES TO DATE (including current period)

13,106,495 $

2,369,761,308 $

13,106,495 $

2,369,761,308 $

BALANCE NOT EXPENDED (F=C-E) 114,420,380 154,191,286 -

Page 14 of 91

268,611,666

Page 15 of 91

Page 16 of 91

Page 17 of 91

Page 18 of 91

Page 19 of 91

TRANSFER IN/(OUT) CURRENT PERIOD DETAIL BUDGETED CAP CON CURRENT PERIOD JUNE 1 - JUNE 30, 2017 DISTRICT NAME

SCHOOL NAME

PROJECT DESCRIPTION

PROJECT NUMBER TRANSFER IN/(OUT) CURRENT PERIOD

CAP CON BUDGET CHANGES

ALBANY 1 ALBANY 1 BIG HORN 3 BIG HORN 4 CARBON 1 CONVERSE 1 CROOK 1 CROOK 1 FREMONT 25 FREMONT 25 FREMONT 6 GOSHEN 1 GOSHEN 1 GOSHEN 1

GOSHEN 1

GOSHEN 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1

ALB01 INDIAN PAINTBRUSH ES MODULAR #1 INDIAN PAINTBRUSH MODULAR ALB01 OLD LARAMIE HS (DEMOLISHED) OLD LARAMIE HS ABATEMENT & DEMOLITION BIG03 GREYBULL HS - BUFF GYM GREYBULL HS PARKING LOTS BIG04 RIVERSIDE HS BIG04 RIVERSIDE HS/D7201 - POINT OF ENTRY/$7187.00 CAR01 RAWLINS HS (DEMOLISHED) ASBESTOS ABATEMENT AT OLD RAWLINS HS CON01 MOSS AGATE ES MOSS AGATE ES MODULAR REPLACEMENT CRO01 SUNDANCE ES NEW SUNDANCE ES CRO01 MOORCROFT ES/MS NEW MOORCROFT ES FRE25 ASHGROVE ES ASHGROVE ES WATER & SEWER REPLACEMENT FRE25 ALT SCHL RIVERTON HS (9-12)/D7202 - SECURED FRE25 SPECIAL SERVICES VESTIBULE/CONRAD.KELSO/$423 FRE06 WIND RIVER JR/SR HS (6-12)/D7103 - EXTERIOR DOOR FRE06 WIND RIVER JHS/HS LOCKS/ANDREW.MORSE-PRIVETT/$7832.85 GOS01 TORRINGTON HS GOS01 TORRINGTON HS (9-12) NEW THS AUTO/AG SHOP/D7301 - TWOAUTO/AG SHOP WAY COMMUNICATIONS/PHIL.WINTERLAND/$2920 GOS01 TORRINGTON HS GOS01 TORRINGTON HS (9-12) SPECIAL SERVICES/D7301 - TWO-WAY SPECIAL SERVICES COMMUNICATIONS/PHIL.WINTERLAND/$10769.75 GOS01 LAGRANGE SCHOOL - 1972 ADDITION K-6/D7301 - TWO-WAY GOS01 LAGRANGE ES COMMUNICATIONS/PHIL.WINTERLAND/$1276.64 GOS01 LINGLE-FORT LARAMIE MS/HS GOS01 LINGLE-FORT LARAMIE MS/HS INDUSTRIAL ARTS 6-12/D7301 INDUSTRIAL ARTS TWO-WAY COMMUNICATIONS/PHIL.WINTERLAND/$420.02 GOS01 LINGLE-FORT LARAMIE MS/HS VO-AG GOS01 LINGLE-FORT LARAMIE MS/HS VO-AG BLDG 6-12/D7301 - TWOBLDG 6-12 (DEMOLISHED) WAY COMMUNICATIONS/PHIL.WINTERLAND/$420.02 LAR01 CAREY JHS (FUTURE) NEW CAREY JR/HS LAR01 SADDLERIDGE ES K-6/D7301 - TWO-WAY LAR01 SADDLE RIDGE ES COMMUNICATIONS/MAYRAJ.PEER/$14341 29 LAR01 DILDINE ES MAIN BLDG K-6/D7301 - TWO-WAY LAR01 DILDINE ES COMMUNICATIONS/JASON.MACKINNON/$2206.45 LAR01 MCCORMICK JR HS (7-8) MAIN BLDG/D7301 - TWO-WAY LAR01 MCCORMICK JHS COMMUNICATIONS/PAUL.SWANSON/$50860.99 LAR01 BAGGS ES (NEW) K-6/D7301 - TWO-WAY LAR01 BAGGS ES COMMUNICATIONS/MAYRAJ.PEER/$14549 25

1000

(16,200)

2734

(2,661)

2774 2747

(24,650) (4,000)

1191 2694 1050

(369,790) (26,595) (59,539)

1049 2766

(17,468) (114,029)

1261

(4,511)

1730

(3,190)

2232

(2,920)

2290

(1,929)

1271

(1,277)

1745

(420)

1882

(420)

1080

(19,500)

2623

(2,640)

2445

(2,200)

2577

(1,760)

2006

(1,320)

Page 20 of 91

TRANSFER IN/(OUT) CURRENT PERIOD DETAIL BUDGETED CAP CON CURRENT PERIOD JUNE 1 - JUNE 30, 2017 DISTRICT NAME

SCHOOL NAME

PROJECT DESCRIPTION

PROJECT NUMBER TRANSFER IN/(OUT) CURRENT PERIOD

CAP CON BUDGET CHANGES

LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 LARAMIE 2 NATRONA 1 PARK 6 SHERIDAN 2 SHERIDAN 2 SHERIDAN 2 SHERIDAN 2 SHERIDAN 2

LAR01 CAREY JR HS (7-8) MAIN BLDG/D7301 - TWO-WAY LAR01 CAREY JHS COMMUNICATIONS/PAUL.SWANSON/$6131.77 LAR01 CENTRAL HS (9-12) MAIN BLDG/D7301 - TWO-WAY LAR01 CENTRAL HS COMMUNICATIONS/JASON.MACKINNON/$52102.47 LAR01 COLE ES MAIN BLDG K-6/D7301 - TWO-WAY LAR01 COLE ES COMMUNICATIONS/MAYRAJ.PEER/$1375.91 LAR01 ARP ES MAIN BLDG K-6/D7301 - TWO-WAY LAR01 ARP ES COMMUNICATIONS/JASON.MACKINNON/$11295.24 LAR01 HENDERSON ES MAIN BLDG K-6/D7301 - TWO-WAY LAR01 HENDERSON ES COMMUNICATIONS/JASON.MACKINNON/$1618.46 LAR01 JOHNSON JR HS (7-8) MAIN BLDG/D7301 - TWO-WAY LAR01 JOHNSON JHS COMMUNICATIONS/JASON.MACKINNON/$47142.57 LAR01 ANDERSON ES K-6/D7204 - VISITOR MANAGEMENT LAR01 ANDERSON ES SYSTEMS/JASON.MACKINNON/$1090 LAR01 ARP ES MAIN BLDG K-6/D7204 - VISITOR MANAGEMENT LAR01 ARP ES SYSTEMS/JASON.MACKINNON/$1090 LAR01 EAST HS (9-12) MAIN BLDG/D7204 - VISITOR MANAGEMENT LAR01 EAST HS SYSTEMS/PAUL.SWANSON/$1090 LAR01 GOINS ES (NEW REPLACEMENT SCHOOL) K-6/D7204 - VISITOR LAR01 GOINS ES MANAGEMENT SYSTEMS/PAUL.SWANSON/$1090 LAR01 SADDLERIDGE ES K-6/D7204 - VISITOR MANAGEMENT LAR01 SADDLE RIDGE ES SYSTEMS/MAYRAJ.PEER/$1090 LAR01 BUFFALO RIDGE ES MAIN BLDG K-6/D7301 - TWO-WAY LAR01 BUFFALO RIDGE ES COMMUNICATIONS/JASON.MACKINNON/$13834.91 LAR01 MEADOWLARK ES 5-6 (EAST TRIAD) NEW/D7301 - TWO-WAY LAR01 MEADOWLARK ES COMMUNICATIONS/$2643.90 LAR01 DAVIS ES (NEW) ON EXISTING SITE/D7301 - TWO-WAY LAR01 DAVIS ES COMMUNICATIONS/$2203.25 LAR02 PINE BLUFFS ES NEW PINE BLUFFS ES NAT01 BAR NUNN ES BAR NUNN ES ADDITION PAR06 VALLEY ES (K-5) RECREATIONAL (NEW) VALLEY ES RECREATIONAL BUILDING SHE02 MEADOWLARK ES REPLACEMENT (NEW) K-5/D7204 - VISITOR SHE02 MEADOWLARK ES MANAGEMENT SYSTEMS/TR.HERNACKI/$1090 SHE02 SAGEBRUSH ES (K-5) MAIN BLDG/D7204 - VISITOR SHE02 SAGEBRUSH ES MANAGEMENT SYSTEMS/TR.HERNACKI/$1090 SHE02 SHERIDAN HS (9-12) MAIN BLDG/D7204 - VISITOR SHE02 SHERIDAN HS MANAGEMENT SYSTEMS/TR.HERNACKI/$1090 SHE02 SHERIDAN JR HS (6-8) NEW JHS & OLD GYM/D7204 - VISITOR SHE02 SHERIDAN JHS MANAGEMENT SYSTEMS/TR.HERNACKI/$1090 SHE02 HENRY A. COFFEEN SHE02 COFFEEN ES (NEW) K-5/D7204 - VISITOR MANAGEMENT ES SYSTEMS/TR.HERNACKI/$1090

2242

(1,320)

2294

(1,320)

2402

(1,320)

1897

(880)

2534

(880)

2560

(880)

1758

(634)

1894

(634)

2452

(634)

2513

(634)

2622

(634)

2175

(440)

2684

(286)

2683 1096 1102

(238) (229,864) (22,203)

2697

(366,395)

1936

(3,564)

2036

(3,564)

2126

(3,564)

2257

(3,564)

1332

(3,564)

Page 21 of 91

TRANSFER IN/(OUT) CURRENT PERIOD DETAIL BUDGETED CAP CON CURRENT PERIOD JUNE 1 - JUNE 30, 2017 DISTRICT NAME

SCHOOL NAME

PROJECT DESCRIPTION

PROJECT NUMBER TRANSFER IN/(OUT) CURRENT PERIOD

CAP CON BUDGET CHANGES

SHERIDAN 2 SHERIDAN 2 SUBLETTE 9

SWEETWATER 2 TETON 1 UINTA 1 UINTA 6

SHE02 FORT MACKENZIE HS / THE WRIGHT PLACE MS

SHE02 FORT MACKENZIE (9-12) AND THE WRIGHT PLACE (6-8)/D7204 VISITOR MANAGEMENT SYSTEMS/TR.HERNACKI/$390 SHE02 HIGHLAND PARK ES MAIN BLDG (NEW) K-5/D7204 - VISITOR SHE02 HIGHLAND PARK ES MANAGEMENT SYSTEMS/TR.HERNACKI/$390 SUB09 BIG PINEY MS BIG PINEY MS RENOVATION ADDITION SWE02 WILSON BUILDING (FUTURE ADMIN) OLD WILSON ES RENOVATION ADDITION TET01 MUNGER MOUNTAIN ES (NEW) MUNGER MOUNTAIN ES UIN01 EVANSTON MS EVANSTON MS RENOVATION ADDITION UIN06 LYMAN HS LYMAN HS ROOF REPLACEMENT TOTAL

1640

(3,564)

1799 1142

(3,564) 606,292

1150

(58,004)

1155 1156 2776

(2,702,363) (133,685) (1,130,120) (4,749,043)

Page 22 of 91

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017

District ALBANY 1

Facility ALB01 SLADE ES (NEW) ON OLD HS SITE K‐5 ALB01 LARAMIE HS

ALB01 INDIAN PAINTBRUSH ES ‐ MODULAR #1

Description SLADE ES REPLACEMENT NEW LARAMIE HS PURCHASE LAND ADJACENT TO NEW LARAMIE HS  SITE INDIAN PAINTBRUSH MODULAR

Type NEW CONSTRUCTION NEW CONSTRUCTION

BIG HORN 2

Unspent Contracts ($) 599,015.80 599,164.26

904,018.50 139,450.00

904,018.50 105,625.00

904,018.50 89,425.00

0.00 16,200.00

100,000.00 25,000.00 3,400,000.00 750,000.00 84,456,870.63

100,000.00 25,000.00 3,400,000.00 750,000.00 84,456,870.63

100,000.00 24,900.00 3,131,037.00 0.00 80,996,723.86

72,883.00 24,233.57 1,039,105.08 0.00 77,662,628.45

27,117.00 666.43 2,091,931.92 0.00 3,334,095.41

25,000.00 25,000.00

25,000.00 25,000.00

0.00 0.00

0.00 0.00

0.00 0.00

3,886,026.00 9,930,422.59 13,816,448.59

3,886,026.00 9,930,422.59 13,816,448.59

451,844.00 9,930,422.59 10,382,266.59

259,396.87 9,930,422.59 10,189,819.46

192,447.13 0.00 192,447.13

EMERGENCY ‐ MODULAR FACILITY AT NOTCH PEAK ES LARAMIE JR HS PLANNING STUDY OLD LARAMIE HS ABATEMENT & DEMOLITION PURCHASE LAND FOR FUTURE SCHOOL

MODULAR STUDY DEMOLITION LAND ACQUISITION

BIG01 ROCKY MOUNTAIN ES

ROCKY MOUNTAIN ES PLANNING STUDY

STUDY

BIG02 LOVELL ES BIG02 LOVELL HS

LOVELL ES FOOD SERVICE STRUCTURAL ISSUES LOVELL HS RENOVATION

COMPONENT NEW CONST/RENO

DEMOLITION

169,783.20

169,783.20

169,783.20

169,783.20

0.00

COMPONENT

150,000.00

150,000.00

150,000.00

150,000.00

0.00

COMPONENT COMPONENT MODULAR MODULAR

360,000.00 239,309.00 161,550.00 141,550.00

360,000.00 239,309.00 161,550.00 141,550.00

360,000.00 23,120.00 135,000.00 115,000.00

359,999.80 5,548.00 134,601.30 115,000.00

0.20 17,572.00 398.70 0.00

BIG03 GREYBULL MS BIG03 CENTRAL ADMINISTRATION (OLD  GREYBULL MS) BIG03 GREYBULL HS ‐ BUFF GYM

GREYBULL MS/HS AQUATIC CENTER DEMOLITION REPLACE GRAVEL UNDER PLAYGROUND EQUIPMENT  FOR SAFETY AND HEALTH QUIGG BUILDING (VOCATIONAL EDUCATION) AIR  QUALITY REMEDIATION QUIGG BUILDING ‐ REPOINT MORTAR GREYBULL ES MODULAR #1 GREYBULL ES MODULAR #2 GREYBULL MS GYM/MIDDLE SCHOOL NEW  CONSTRUCTION RENOVATION LAND PURCHASE ADJACENT TO GREYBULL HS (0.344  ACRES) GREYBULL HS PARKING LOTS

NEW CONST/RENO

5,957,550.00

5,957,550.00

5,892,604.00

5,888,172.10

4,431.90

LAND ACQUISITION COMPONENT

9,475.00 370,440.00 7,559,657.20

9,475.00 370,440.00 7,559,657.20

9,475.00 24,650.00 6,879,632.20

9,475.00 6,051.00 6,838,630.40

0.00 18,599.00 41,001.80

BIG04 CLOUD PEAK ES/MS BIG04 LAURA IRWIN ES (FUTURE) BIG04 RIVERSIDE MS/HS (FUTURE)

MANDERSON/CLOUD PEAK ES/MS UPS BACKUP  COMM SYSTEM NEW LAURA IRWIN ES NEW RIVERSIDE MS/HS

COMPONENT NEW CONSTRUCTION NEW CONSTRUCTION

0.00 11,629,438.00 20,462,218.00 32,091,656.00

0.00 11,629,438.00 20,462,218.00 32,091,656.00

0.00 1,305,675.00 2,637,588.00 3,943,263.00

0.00 633,198.83 797,768.67 1,430,967.50

0.00 672,476.17 1,839,819.33 2,512,295.50

CAM01 4‐J ES CAM01 4‐J ES ‐ BOILER BLDG CAM01 CONESTOGA ES

4J ES HVAC/CONTROLS 4J ES BOILER REPLACEMENT CONESTOGA ES NATURAL GAS BOILER INSTALL

COMPONENT COMPONENT COMPONENT

127,575.00 135,598.00 90,259.50

127,575.00 135,598.00 90,259.50

127,575.00 135,598.00 90,259.50

126,585.00 135,598.00 90,259.50

990.00 0.00 0.00

BIG03 GREYBULL MS/HS AQUATIC CENTER 9‐12  (DEMOLISHED)

BIG03 GREYBULL HS ‐ QUIGG BLDG BIG03 GREYBULL ES ‐ MODULAR #1 BIG03 GREYBULL ES ‐ MODULAR #2

BIG HORN 3 Total

BIG HORN 4 Total CAMPBELL 1

Expensed ($) 973,324.20 74,559,639.10

ALB01 NOTCH PEAK SCHOOL ALB01 LARAMIE JHS ALB01 OLD LARAMIE HS (DEMOLISHED) ALB01 FUTURE LARAMIE JHS

BIG03 GREYBULL ES

BIG HORN 4

Awarded Contracts ($) 1,572,340.00 75,158,803.36

904,018.50 139,450.00

BIG HORN 2 Total

BIG HORN 3

Current Budget ($) 2,283,430.00 76,854,972.13

LAND ACQUISITION MODULAR

ALBANY 1 Total BIG HORN 1 BIG HORN 1 Total

Appropriation ($) 2,283,430.00 76,854,972.13

Page 23 of 91  

District CAMPBELL 1

Facility CAM01 CONESTOGA ES

CAM01 MEADOWLARK ES CAM01 ROZET ES

CAM01 SUNFLOWER ES

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Description Type CONESTOGA ES ROOF REPLACEMENT COMPONENT CONESTOGA ES SITE DRAINAGE FIX COMPONENT MEADOWLARK ES RENOVATION/HVAC/ELECTRICAL  UPGRADE COMPONENT ROZET ES HVAC CONSTRUCTION COMPONENT ROZET ES ROOF REPLACEMENT COMPONENT

Current Budget ($) 458,753.28 630,947.57

Awarded Contracts ($) 458,753.28 630,947.57

Expensed ($) 458,753.28 630,947.57

Unspent Contracts ($) 0.00 0.00

2,547,147.00 3,773,330.00 2,874,802.00

2,547,147.00 3,773,330.00 2,874,802.00

2,351,815.55 3,221,128.00 0.00

996,710.71 3,214,330.38 0.00

1,355,104.84 6,797.62 0.00

54,814.65 184,186.68 725,535.00 254,112.00

54,814.65 184,186.68 725,535.00 254,112.00

54,814.65 184,186.68 0.00 254,112.00

54,814.65 184,186.68 0.00 254,112.00

0.00 0.00 0.00 0.00

COMPONENT

1,202,759.00

1,202,759.00

1,202,759.00

1,199,954.71

2,804.29

COMPONENT

133,335.20

133,335.20

133,335.20

133,335.20

0.00

124,982.79 36,329,002.06 4,390,409.00 16,650,796.02 16,047,308.61 18,335,180.00 9,388,534.35

124,982.79 36,329,002.06 4,390,409.00 16,650,796.02 16,047,308.61 18,335,180.00 9,388,534.35

124,982.79 36,005,274.08 3,929,383.07 16,650,796.02 16,047,308.61 18,219,617.61 9,388,534.35

124,982.79 31,766,022.27 2,357,334.11 16,605,067.11 16,047,308.61 17,463,482.75 9,298,697.10

0.00 4,239,251.81 1,572,048.96 45,728.91 0.00 756,134.86 89,837.25

SUNFLOWER ES FIRE ALARM SYSTEM REPLACEMENT SUNFLOWER ES GAS BOILER INSTALL SUNFLOWER ES ROOF REPLACEMENT LAND PURCHASE ADJACENT TO WAGONWHEEL ES WAGONWHEEL ES CLASSROOM ADDITION/HVAC  UPGRADE WRIGHT JR/SR HS EXTERIOR DOORS/HARDWARE  REPLACEMENT WRIGHT JR/SR HS FIRE ALARM SYSTEM  REPLACEMENT SOUTH HS ADDITION/RENOVATION SOUTH HS SPORTS FIELD NEW BUFFALO RIDGE ES NEW LAKEVIEW ES NEW STOCKTRAIL ES NEW WESTWOOD ALTERNATIVE HS CAMPBELL COUNTY HS HEATING PLANT  REPLACEMENT

COMPONENT COMPONENT COMPONENT LAND ACQUISITION

COMPONENT

1,749,312.00

1,749,312.00

0.00

0.00

0.00

FUTURE ES SITE

NEW CONSTRUCTION

1,535,780.02

1,535,780.02

1,535,780.02

1,535,780.02

0.00

LITTLE POWDER K‐8 (NEW)

NEW CONSTRUCTION

53,500.00

53,500.00

53,500.00

25,192.30

28,307.70

NEW TRANSPORTATION BUILDING

NEW CONSTRUCTION

451,400.00 118,249,359.73

451,400.00 118,249,359.73

10,300.00 110,810,760.98

7,795.43 102,711,250.17

2,504.57 8,099,510.81

CAR01 SINCLAIR ES K‐5 (MOTHBALLED)

SINCLAIR ES RENOVATION

NEW CONST/RENO

1,050,813.22

1,050,813.22

1,050,813.22

1,050,813.22

0.00

CAR01 RAWLINS ES K ‐ 1 CAMPUS ‐ MODULAR #1

HIGHLAND HILLS ES MODULAR #1

MODULAR

108,780.00

108,780.00

108,780.00

93,240.00

15,540.00

CAR01 ‐ RAWLINS HS 9‐12 MAIN BUILDING (NEW) CAR01 LITTLE SNAKE RIVER VALLEY ES/MS/HS CAR01 RAWLINS CONSOLIDATED ES

NEW RAWLINS HS LITTLE SNAKE RIVER VALLEY RENOVATION NEW RAWLINS CONSOLIDATED ES NEW RAWLINS CONSOLIDATED ES PRODUCTION  KITCHEN RAWLINS CONSOLIDATED ES DESIGN  ADDITION/RENOVATION RAWLINS MS RENOVATION RAWLINS ES K‐1

NEW CONST/RENO NEW CONST/RENO NEW CONSTRUCTION

41,590,363.00 500,000.00 20,625,031.22

41,590,363.00 500,000.00 20,625,031.22

40,466,874.05 464,595.00 20,625,031.22

38,135,551.64 407,978.01 20,625,031.22

2,331,322.41 56,616.99 0.00

NEW CONST/RENO

2,105,436.00

2,105,436.00

2,105,436.00

1,896,455.27

208,980.73

NEW CONSTRUCTION NEW CONST/RENO NEW CONSTRUCTION

991,429.00 3,007,400.00 900,631.00

991,429.00 3,007,400.00 900,631.00

677,135.00 2,948,731.34 843,809.04

477,072.47 2,881,577.61 838,283.63

200,062.53 67,153.73 5,525.41

CAM01 WAGONWHEEL ES

CAM01 WRIGHT JHS/HS

CAM01 THUNDER BASIN HS CAM01 BUFFALO RIDGE ES CAM01 LAKEVIEW ES CAM01 STOCKTRAIL ES CAM01 WESTWOOD HS CAM01 CAMPBELL COUNTY HS ‐ BOILER BLDG CAM01 FUTURE ES SITE (MOON MEADOWS)  (INACTIVE) CAM01 FUTURE LITTLE POWDER ES/MS  (INACTIVE) CAM01 FUTURE TRANSPORTATION BUILDING  (INACTIVE)

COMPONENT NEW CONST/RENO NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION

CAMPBELL 1 Total CARBON 1

Appropriation ($) 458,753.28 630,947.57

CAR01 RAWLINS MS CAR01 RAWLINS ES K ‐ 1 CAMPUS

Page 24 of 91  

District CARBON 1

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type

Facility Description CAR01 RAWLINS TRANSPORTATION, STORAGE &  MAINTENANCE FACILTY NEW BUS BARN ON MS SITE CAR01 MOUNTAIN VIEW ES (DISPOSED) MOUNTAIN VIEW ES DEMOLITION CAR01 PERSHING ES MAIN BLDG (DISPOSED) PERSHING ES DEMOLITION CAR01 RAWLINS HS (DEMOLISHED) ASBESTOS ABATEMENT AT OLD RAWLINS HS

3,589,749.74 526,567.88 394,102.11 1,698,659.13 72,615,081.93

149,019.26 106,823.31 6,536.34 907,784.45 4,055,365.16

CAR02 ENCAMPMENT ES/MS/HS CAR02 HANNA ES CAR02 ENCAMPMENT BUS BARN CAR02 MEDICINE BOW BUS BARN CAR02 HANNA‐ELK MOUNTAIN JHS/HS

ENCAMPMENT K‐12 LIGHT/HVAC CONTROL  UPGRADES NEW HANNA ES NEW ENCAMPMENT K‐12 BUS BARN NEW MEDICINE BOW BUS BARN HANNA‐ELK MOUNTAIN 7‐12 HVAC REPLACEMENT

COMPONENT NEW CONST/RENO NEW CONSTRUCTION NEW CONSTRUCTION COMPONENT

916,105.66 9,830,296.48 568,749.00 523,958.00 3,371,478.00 15,210,587.14

916,105.66 9,830,296.48 568,749.00 523,958.00 3,371,478.00 15,210,587.14

916,105.66 9,830,296.48 567,959.00 511,604.00 0.00 11,825,965.14

916,105.66 9,807,800.26 564,635.59 509,838.69 0.00 11,798,380.20

0.00 22,496.22 3,323.41 1,765.31 0.00 27,584.94

CON01 DRY CREEK ES CON01 MOSS AGATE ES CON01 WHITE ES CON01 DOUGLAS UPPER ES

DRY CREEK ES MODULAR REPLACEMENT MOSS AGATE ES MODULAR REPLACEMENT WHITE ES MODULAR REPLACEMENT NEW DOUGLAS UPPER ES

MODULAR MODULAR MODULAR NEW CONSTRUCTION

334,176.00 334,176.00 334,176.00 10,946,415.48 11,948,943.48

334,176.00 334,176.00 334,176.00 10,946,415.48 11,948,943.48

167,415.55 195,480.81 166,459.46 10,946,415.48 11,475,771.30

161,128.29 160,299.80 162,387.65 10,913,718.60 11,397,534.34

6,287.26 35,181.01 4,071.81 32,696.88 78,236.96

CON02 GLENROCK INTERMEDIATE/MS CON02 GLENROCK ACTIVITY COMPLEX ‐  FOOTBALL STADIUM CON02 BOXELDER ES ‐ MODULAR #2  (CORRECTED)

GLENROCK MS PARKING LOT DEMOLITION

COMPONENT

156,126.00

156,126.00

156,126.00

156,126.00

0.00

GLENROCK HS ARTIFICIAL TURF

NEW CONST/RENO

500,000.00

500,000.00

500,000.00

500,000.00

0.00

BOXELDER ES MODULAR #2 PURCHASE/SET‐UP

MODULAR

323,346.00 979,472.00

323,346.00 979,472.00

323,346.00 979,472.00

323,346.00 979,472.00

0.00 0.00

LAND ACQUISITION

180,935.00

180,935.00

180,885.00

180,143.00

742.00

LAND ACQUISITION NEW CONST/RENO NEW CONSTRUCTION

55,000.00 25,338,746.40 16,152,380.00

55,000.00 25,338,746.40 16,152,380.00

55,000.00 23,400,286.24 16,146,316.60

55,000.00 21,701,084.57 15,590,165.98

0.00 1,699,201.67 556,150.62

OLD ADMINISTRATION BUILDING DEMOLITION

DEMOLITION

1,042,258.00 42,769,319.40

1,042,258.00 42,769,319.40

37,000.00 39,819,487.84

0.00 37,526,393.55

37,000.00 2,293,094.29

FRE01 GANNETT PEAK ES FRE01 JEFFREY CITY ES

NEW GANNETT PEAK ES JEFFREY CITY ES K‐6 PLANNING STUDY

NEW CONSTRUCTION STUDY

18,399,566.56 76,054.00 18,475,620.56

18,399,566.56 76,054.00 18,475,620.56

18,399,566.56 71,054.00 18,470,620.56

18,399,566.56 66,054.00 18,465,620.56

0.00 5,000.00 5,000.00

FRE14 WYOMING INDIAN ES

NEW WYOMING INDIAN ES

NEW CONSTRUCTION

18,651,806.00

18,651,806.00

18,628,338.56

18,572,683.30

55,655.26

18,651,806.00

18,651,806.00

18,628,338.56

18,572,683.30

55,655.26

CRO01 MOORCROFT HS CRO01 SUNDANCE JHS/HS CRO01 MOORCROFT ES/MS CRO01 SUNDANCE ES CRO01 OLD SUNDANCE CENTRAL  OFFICE/STORAGE (DEMOLISHED)

PURCHASE LAND ADJACENT TO EXISTING  MOORCROFT HS LAND PURCHASE FOR SUNDANCE HS TRACK AND  FIELD NEW MOORCROFT ES NEW SUNDANCE ES

CROOK 1 Total FREMONT 1 FREMONT 1 Total FREMONT 14 FREMONT 14 Total

Unspent Contracts ($)

3,738,769.00 633,391.19 400,638.45 2,606,443.58 76,670,447.09

CONVERSE 2 Total

CROOK 1

Expensed ($)

3,738,769.00 633,391.19 400,638.45 3,150,000.00 78,802,682.08

CONVERSE 1 Total CONVERSE 2

Awarded Contracts ($)

3,738,769.00 633,391.19 400,638.45 3,150,000.00 78,802,682.08

CARBON 2 Total CONVERSE 1

Current Budget ($)

NEW CONSTRUCTION DEMOLITION DEMOLITION DEMOLITION

CARBON 1 Total

CARBON 2

Appropriation ($)

Page 25 of 91  

District FREMONT 2 FREMONT 2 Total FREMONT 21

Facility

Description

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type

Unspent Contracts ($)

15,234,592.66 15,234,592.66

15,234,592.66 15,234,592.66

15,234,592.66 15,234,592.66

15,151,991.97 15,151,991.97

82,600.69 82,600.69

FRE21 FORT WASHAKIE ES/MS (FUTURE) FRE21 FORT WASHAKIE HS (FUTURE)

1055 ‐ NEW FORT WASHAKIE ES/MS NEW FORT WASHAKIE 9‐12 HS

NEW CONSTRUCTION NEW CONSTRUCTION

41,630,753.00 17,875,296.50

41,630,753.00 17,875,296.50

41,630,752.40 17,875,296.50

36,296,659.35 14,888,161.54

5,334,093.05 2,987,134.96

59,506,049.50

59,506,049.50

59,506,048.90

51,184,820.89

8,321,228.01

49,653,994.09

49,653,994.09

49,001,826.85

48,767,633.32

234,193.53

49,653,994.09

49,653,994.09

49,001,826.85

48,767,633.32

234,193.53

COMPONENT NEW CONSTRUCTION

1,873,354.00 324,200.00

1,873,354.00 324,200.00

1,873,354.00 324,200.00

1,873,354.00 313,298.75

0.00 10,901.25

COMPONENT STUDY COMPONENT

550,000.00 25,000.00 1,583,086.00

550,000.00 25,000.00 1,583,086.00

550,000.00 0.00 1,501,927.00

518,375.45 0.00 559,515.99

31,624.55 0.00 942,411.01

COMPONENT

2,277,298.00

2,277,298.00

2,277,298.00

2,251,734.05

25,563.95

55,000.00 16,058,279.63

55,000.00 16,058,279.63

55,000.00 16,036,569.76

51,151.24 15,612,207.47

3,848.76 424,362.29

FRE24 SHOSHONI ES/MS/HS

FRE25 BUS BARN FRE25 FUTURE ES

FRE25 RIVERTON HS FRE25 WILLOW CREEK ES FRE25 RENDEZVOUS ES ‐ MODULAR #1  (DISPOSED) FRE25 RENDEZVOUS ES ‐ MODULAR #2  (DISPOSED) FRE25 RENDEZVOUS ES ‐ MODULAR #3  (DISPOSED) FRE25 JACKSON ES

FRE25 ASHGROVE ES

NEW SHOSHONI K‐12

NEW CONSTRUCTION

BUS BARN REMEDY COMPONENT SCORES 1 AND 2 LAND PURCHASE FOR FUTURE ES EMERGENCY REMEDY STEAM BOILER FAILURE AT  TONKIN ACTIVITY CENTER RENDEZVOUS ES 3‐5 PLANNING STUDY RENDEZVOUS ES ROOF REMEDY RIVERTON HS REMODEL/REPAIR BUILDING  COMPONENTS LAND PURCHASE ADJACENT TO WILLOW CREEK ES ‐  1.21 ACRES NEW WILLOW CREEK ES

LAND ACQUISITION NEW CONSTRUCTION

RENDEZVOUS ES MODULAR #1

MODULAR

134,925.00

134,925.00

134,925.00

81,539.46

53,385.54

RENDEZVOUS ES MODULAR #2

MODULAR

134,925.00

134,925.00

134,925.00

87,616.16

47,308.84

RENDEZVOUS ES MODULAR #3 JACKSON ES K‐2 PLANNING STUDY JACKSON ES WASTE & DOMESTIC WATER REPLACE JACKSON ES ROOF REPLACEMENT ASHGROVE ES WATER & SEWER REPLACEMENT

MODULAR STUDY COMPONENT COMPONENT COMPONENT

134,925.00 25,000.00 1,730,594.00 1,547,477.00 720,568.00

134,925.00 25,000.00 1,730,594.00 1,547,477.00 720,568.00

134,925.00 0.00 0.00 0.00 114,029.00

87,170.92 0.00 0.00 0.00 0.00

47,754.08 0.00 0.00 0.00 114,029.00

27,174,631.63

27,174,631.63

23,137,152.76

21,435,963.49

1,701,189.27

164,177.00

164,177.00

164,177.00

164,177.00

0.00

164,177.00

164,177.00

164,177.00

164,177.00

0.00

DEMOLITION

368,929.00

368,929.00

0.00

0.00

0.00

COMPONENT RENOVATION

650,000.00 1,241,519.00

650,000.00 1,241,519.00

201,805.00 1,241,519.00

201,805.00 1,207,168.44

0.00 34,350.56

FREMONT 25 Total FRE38 ARAPAHOE MS

ROOF REPLACEMENT AT ARAPAHOE MS

COMPONENT

FREMONT 38 Total

GOSHEN 1

Expensed ($)

NEW CONST/RENO

FRE25 FRONTIER ACADEMY (TAC) FRE25 RENDEZVOUS ES

FREMONT 38

Awarded Contracts ($)

DUBOIS ES/MS NEW CONSTRUCTION RENOVATION

FREMONT 24 Total FREMONT 25

Current Budget ($)

FRE02 DUBOIS ES/MS/HS

FREMONT 21 Total FREMONT 24

Appropriation ($)

GOS01 LINGLE‐FORT LARAMIE BUS BARN #1  (DEMOLISHED) GOS01 TORRINGTON HS

DEMOLITION OF OLD LINGLE FT. LARAMIE ES BUS  BARN #1 TORRINGTON HS MECHANICAL AND ELECTRICAL  COMPONENT CORRECTIONS TORRINGTON HS RENOVATION

Page 26 of 91  

District GOSHEN 1

Facility GOS01 TORRINGTON HS ‐ TECHNOLOGY BLDG GOS01 TRAIL ES GOS01 LINGLE‐FORT LARAMIE MS/HS

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Description Type REPLACE PLUMBING AT TORRINGTON HS TECH ED  BUILDING COMPONENT TRAIL ES HVAC COMPONENT

GOS01 SOUTHEAST ES/MS/HS GOS01 LINGLE ‐ FT. LARAMIE ES GOS01 LAGRANGE ES

LAND PURCHASE ADJ. TO LINGLE‐FT. LARAMIE MS/HS SOUTHEAST ES/MS/HS TEETERS FIELD ARTIFICIAL  TURF NEW LINGLE FT. LARAMIE ES LAGRANGE ES K‐6 PLANNING STUDY

NEW CONST/RENO NEW CONSTRUCTION STUDY

HOT01 DISTRICT STORAGE #4

DISTRICT STORAGE BUILDING #4 DEMOLITION

DEMOLITION

LAND ACQUISITION

GOSHEN 1 Total HOT SPRINGS 1 HOT SPRINGS 1  Total JOHNSON 1

JOH01 BUFFALO HS JOH01 MEADOWLARK ES JOH01 CLOUD PEAK ES

LARAMIE 1

LAR01 SADDLE RIDGE II ES (FUTURE) LAR01 ARP ES ‐ MODULAR #601 LAR01 ARP ES ‐ MODULAR #701 LAR01 BAGGS ES ‐ MODULAR #101 LAR01 CAREY JHS ‐ MODULAR #4 LAR01 DILDINE ES ‐ MODULAR #201 LAR01 FREEDOM ES ‐ MODULAR #101 LAR01 HOBBS ES ‐ MODULAR #3 LAR01 PIONEER PARK ES ‐ MODULAR #2 LAR01 SUNRISE ES ‐ MODULAR #101 LAR01 FREEDOM ES LAR01 CAREY JHS (FUTURE) LAR01 DAVIS ES

Current Budget ($)

Awarded Contracts ($)

Expensed ($)

Unspent Contracts ($)

76,378.00 598,148.00

76,378.00 598,148.00

21,532.31 598,148.00

8,111.34 598,148.00

13,420.97 0.00

19,500.00

19,500.00

0.00

0.00

0.00

500,000.00 13,186,824.00 35,000.00 16,676,298.00

500,000.00 13,186,824.00 35,000.00 16,676,298.00

500,000.00 13,079,834.76 35,000.00 15,677,839.07

500,000.00 12,795,504.35 35,000.00 15,345,737.13

0.00 284,330.41 0.00 332,101.94

51,915.60

51,915.60

51,915.60

51,915.60

0.00

51,915.60

51,915.60

51,915.60

51,915.60

0.00

BUFFALO HS CURB AND GUTTER AROUND TRACK MEADOWLARK ES PARENT DROP‐OFF NEW CLOUD PEAK ES

COMPONENT COMPONENT NEW CONSTRUCTION

0.00 150,000.00 12,529,006.61 12,679,006.61

0.00 150,000.00 12,529,006.61 12,679,006.61

0.00 150,000.00 12,529,006.61 12,679,006.61

0.00 150,000.00 12,529,006.61 12,679,006.61

0.00 0.00 0.00 0.00

LAND PURCHASE FOR FUTURE ES LAND PURCHASE FOR FUTURE ES (SADDLE RIDGE II  ES) ARP ES MODULAR #601 ARP ES MODULAR #701 BAGGS ES MODULAR #101 CAREY JR/HS MODULAR #4 DILDINE ES MODULAR #201 FREEDOM ES MODULAR #101 HOBBS ES MODULAR #3 PIONEER PARK ES MODULAR #2 SUNRISE ES MODULAR #101 FREEDOM ES 4 CLASSROOM ADDITION NEW CAREY JR/HS NEW DAVIS ES

NEW CONSTRUCTION

2,169,437.16

2,169,437.16

2,127,057.16

2,127,057.16

0.00

LAND ACQUISITION MODULAR MODULAR MODULAR MODULAR MODULAR MODULAR MODULAR MODULAR MODULAR NEW CONST/RENO NEW CONSTRUCTION NEW CONSTRUCTION

2,107,900.00 118,855.13 63,906.39 166,040.63 140,719.41 130,351.13 160,290.65 139,078.83 125,000.00 166,609.74 3,542,427.00 5,310,227.00 16,198,482.80

2,107,900.00 118,855.13 63,906.39 166,040.63 140,719.41 130,351.13 160,290.65 139,078.83 125,000.00 166,609.74 3,542,427.00 5,310,227.00 16,198,482.80

1,736,065.38 96,417.85 48,956.39 143,603.35 118,282.13 107,913.85 137,853.37 116,641.55 89,499.00 138,712.45 3,014,448.20 3,070,485.00 15,765,793.80

1,736,065.38 92,699.91 38,998.01 131,743.42 114,597.24 104,284.45 132,424.39 108,287.59 88,239.52 121,483.61 2,875,955.14 1,972,831.51 15,571,866.87

0.00 3,717.94 9,958.38 11,859.93 3,684.89 3,629.40 5,428.98 8,353.96 1,259.48 17,228.84 138,493.06 1,097,653.49 193,926.93

DEMING ES PLANNING STUDY FOR BUILDING REMEDY NEW CONSTRUCTION

83,600.00

83,600.00

83,600.00

78,715.73

4,884.27

4,415,630.76 20,643,989.00 18,626,837.39

4,415,630.76 20,643,989.00 18,626,837.39

4,415,630.76 20,413,381.50 18,622,237.39

4,411,357.50 20,225,657.28 18,608,747.62

4,273.26 187,724.22 13,489.77

145,000.00 154,624.87

145,000.00 154,624.87

145,000.00 132,642.58

145,000.00 122,682.16

0.00 9,960.42

JOHNSON 1 Total LAR01 FUTURE ES IN EAST TRIAD (24 ACRE SITE  SOUTH OF STOREY BLVD) MURRAY PROPERTY  SECTION 20

Appropriation ($)

LAR01 DEMING ES LAR01 EAST HS ‐ OKIE BLANCHARD SPORTS  COMPLEX LAR01 MEADOWLARK ES LAR01 PRAIRIE WIND ES

NEW EAST HS OKIE BLANCHARD SPORT COMPLEX NEW MEADOWLARK ES NEW PRAIRIE WIND ES

NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION

LAR01 ADMINISTRATION BLDG LAR01 SADDLE RIDGE ES ‐ MODULAR #101

PLANNING FUNDS TO EVALUATE CAPACITY REMEDY SADDLERIDGE ES MODULAR #101

STUDY MODULAR

Page 27 of 91  

District LARAMIE 1

Facility LAR01 SADDLE RIDGE ES ‐ MODULAR #102 LAR01 SADDLE RIDGE ES ‐ MODULAR #103 LAR01 CAREY JHS ‐ MODULAR #3

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Description Type SADDLERIDGE ES MODULAR #103 (MOVED FROM  JESSUP ES) MODULAR SADDLERIDGE ES MODULAR #301 (MOVED FROM  ANDERSON ES) MODULAR CAREY JR/HS MODULAR #3 MODULAR

LARAMIE 1 Total

LARAMIE 2

Expensed ($)

Unspent Contracts ($)

265,167.18

265,167.18

191,952.68

185,082.45

6,870.23

311,463.02 140,719.41 75,326,357.50

311,463.02 140,719.41 75,326,357.50

211,049.48 118,282.12 71,045,505.99

203,568.04 114,597.23 69,311,942.21

7,481.44 3,684.89 1,733,563.78

NEW CONST/RENO NEW CONSTRUCTION

1,475,641.00 10,014,479.00 11,490,120.00

1,475,641.00 10,014,479.00 11,490,120.00

1,461,207.00 9,549,681.95 11,010,888.95

1,434,312.53 4,536,934.70 5,971,247.23

26,894.47 5,012,747.25 5,039,641.72

LIN01 CANYON ES LIN01 KEMMERER JHS/HS

KEMMERER MS KITCHEN/CAFETERIA RENOVATION KEMMERER HS RENOVATION

NEW CONST/RENO NEW CONST/RENO

1,163,000.00 19,575,705.07 20,738,705.07

1,163,000.00 19,575,705.07 20,738,705.07

0.00 19,575,705.07 19,575,705.07

0.00 19,575,705.07 19,575,705.07

0.00 0.00 0.00

LIN02 THAYNE ES LIN02 ADMINISTRATION BLDG

THAYNE ES CLASSROOM ADDITION NEW ADMINISTRATION BUILDING

NEW CONST/RENO NEW CONSTRUCTION

2,682,449.95 3,535,390.00 6,217,839.95

2,682,449.95 3,535,390.00 6,217,839.95

2,682,449.95 3,525,710.78 6,208,160.73

2,608,066.14 3,423,942.36 6,032,008.50

74,383.81 101,768.42 176,152.23

NAT01 CY JR HIGH MAIN BLDG 6‐9 (DEMOLISHED)

CY JR/HS MAIN BUILDING DEMOLITION

DEMOLITION

2,560,208.00

2,560,208.00

1,729,009.00

1,655,034.73

73,974.27

NAT01 FOREST OIL ES/RESIDENCE (DEMOLISHED) NAT01 RITTENOUR PROPERTY‐MORAD PARK  (CLOSED) NAT01 NORTH CASPER ES PORTABLE 3 (MOVED  TO RED CREEK ES) NAT01 BAR NUNN ES

FORREST OIL ES/RESIDENCE DEMOLITION

DEMOLITION

12,197.00

12,197.00

12,197.00

8,942.24

3,254.76

RITTENOUR PROPERTY‐MORAD PARK DEMOLITION

DEMOLITION

70,336.00

70,336.00

70,336.00

69,039.06

1,296.94

NORTH CASPER ES MODULAR #3 BAR NUNN ES ADDITION BARN NUNN ES BUS LOOP EXTENSION PARK ES MODULAR #4 PARK ES MODULAR #5 MIDWEST ES/MS/HS PLANNING FUNDING FOR  REMEDY OF BUILDING NATRONA COUNTY HS NEW CONSTRUCTION  RENOVATION NEW K‐5 ES NEW KELLY WALSH HS NEW LINCOLN ES NEW PATHAWAYS INNOVATION CENTER RED CREEK ES MODULAR NEW ROOSEVELT ALTERNATIVE HS NEW SOUTHRIDGE ES

MODULAR NEW CONST/RENO COMPONENT MODULAR MODULAR

96,234.19 4,730,510.00 210,754.60 95,425.66 95,425.65

96,234.19 4,730,510.00 210,754.60 95,425.66 95,425.65

96,234.19 4,321,565.78 210,754.60 95,425.66 95,425.65

96,234.19 3,846,603.86 210,754.60 95,425.66 95,425.65

0.00 474,961.92 0.00 0.00 0.00

NEW CONST/RENO

45,132.39

45,132.39

45,132.39

45,132.39

0.00

NEW CONST/RENO NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION

124,141,497.55 14,726,135.00 99,669,814.83 17,741,286.41 32,222,732.29 168,310.00 18,551,546.27 12,555,622.45

124,141,497.55 14,726,135.00 99,669,814.83 17,741,286.41 32,222,732.29 168,310.00 18,551,546.27 12,555,622.45

122,501,105.54 14,093,332.74 95,707,954.72 17,741,286.41 31,174,756.59 163,365.36 17,716,556.36 12,067,606.83

107,812,981.09 10,437,719.42 86,277,712.50 14,973,779.12 28,607,808.10 152,328.72 16,111,275.91 11,900,793.51

14,688,124.45 3,655,613.32 9,430,242.22 2,767,507.29 2,566,948.49 11,036.64 1,605,280.45 166,813.32

NEW NCHS STUDENT FITNESS AND ACTIVITY CENTER PINEVIEW ES

NEW CONSTRUCTION NEW CONSTRUCTION

11,456,428.00 1,086,798.80

11,456,428.00 1,086,798.80

11,444,706.46 1,086,798.80

11,401,512.82 742,640.84

43,193.64 344,157.96

LINCOLN 2 Total

NATRONA 1

Awarded Contracts ($)

BURNS JR/SR HS SPORTS FIELD AND TRACK  RENOVATION NEW PINE BLUFFS ES

LINCOLN 1 Total LINCOLN 2

Current Budget ($)

LAR02 BURNS JHS/HS LAR02 PINE BLUFFS ES

LARAMIE 2 Total LINCOLN 1

Appropriation ($)

NAT01 PARK ES ‐ MODULAR #4 NAT01 PARK ES ‐ MODULAR #5 NAT01 MIDWEST ES/MS/HS NAT01 NATRONA COUNTY HS NAT01 JOURNEY ES (NEW) NAT01 KELLY WALSH HS NAT01 LINCOLN ES NAT01 PATHAWAYS INNOVATION CENTER NAT01 RED CREEK ES NAT01 ROOSEVELT HS NAT01 SOUTHRIDGE ES NAT01 NCHS ‐ MACC (MUSTANG ACTIVITIES  COMMUNITY CENTER) NAT01 PINEVIEW ES (CORRECTED)

Page 28 of 91  

District NATRONA 1 Total PARK 1

Facility

PAR01 FUTURE ES (K‐5) PAR01 SUPPORT SERVICES BUILDING PAR01 OLD POWELL MS (DEMOLISHED) PAR01 POWELL MS

Description

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type

PARK 6

270,130.20 3,255,264.64 4,352,178.55 20,056,316.00

270,130.20 3,255,264.64 4,352,178.55 19,791,226.89

0.00 0.00 0.00 265,089.11

PAR01 PARKSIDE ES

STUDY

25,000.00 30,713,510.39

25,000.00 30,713,510.39

0.00 27,933,889.39

0.00 27,668,800.28

0.00 265,089.11

PAR16 MEETEETSE ES/MS/HS ‐ GYM

MEETEETSE ES/MS/HS GYM RENOVATION

COMPONENT

2,788,688.00 2,788,688.00

2,788,688.00 2,788,688.00

2,788,688.00 2,788,688.00

2,784,828.15 2,784,828.15

3,859.85 3,859.85

PAR06 VALLEY ES (K‐5) RECREATIONAL (NEW) PAR06 GLENN LIVINGSTON ES PAR06 SUNSET ES

VALLEY ES RECREATIONAL BUILDING GLENN LIVINGSTON REMODEL SUNSET ES ADDITION

NEW CONSTRUCTION NEW CONST/RENO NEW CONST/RENO

469,905.00 458,714.00 282,909.00 1,211,528.00

469,905.00 458,714.00 282,909.00 1,211,528.00

415,734.53 433,714.00 282,909.00 1,132,357.53

12,580.00 177,872.75 131,965.72 322,418.47

403,154.53 255,841.25 150,943.28 809,939.06

PLA01 FUTURE TRANSPORTATION BUILDING PLA01 GLENDO BUS BARN

NEW CONSTRUCTION DEMOLITION

80,000.00 64,713.00

80,000.00 64,713.00

0.00 13,187.00

0.00 0.00

0.00 13,187.00

COMPONENT

802,516.18

802,516.18

802,516.18

802,516.18

0.00

PLA01 WHEATLAND HS ‐ ACTIVITIES BLDG MAIN  BLDG PLA01 CHUGWATER JHS/HS PLA01 WEST ES

NEW TRANSPORTATION BUILDING GLENDO BUS BARN DEMOLITION LIBBEY ES FIRE SPRINKLER/NEW DROP CEILING/NEW  LIGHTING SYSTEM EMERGENCY ‐ RENOVATE CONCESSIONS ROOM IN  COMMONS AREA FOR FOOD SERVICE (SHORT TERM  SOLUTION) CHUGWATER HS COAL BOILER REPLACEMENT WEST ES HVAC REPLACEMENT

RENOVATION COMPONENT COMPONENT

355,227.00 175,000.00 1,405,000.00 2,882,456.18

355,227.00 175,000.00 1,405,000.00 2,882,456.18

234,139.50 0.00 0.00 1,049,842.68

212,639.41 0.00 0.00 1,015,155.59

21,500.09 0.00 0.00 34,687.09

PLA02 GUERNSEY‐SUNRISE ES/MS/HS PLA02 GUERNSEY‐SUNRISE ES/MS/HS ‐  GROUNDS KEEPER BLDG/HS AUTO SHOP

GUERNSEY SUNRISE ES/MS/HS GYM ROOF  REPLACEMENT GROUNDS KEEPER BUILDING/HS AUTO SHOP ROOF  REPLACEMENT

COMPONENT

103,440.00

103,440.00

103,440.00

103,440.00

0.00

COMPONENT

15,000.00 118,440.00

15,000.00 118,440.00

15,000.00 118,440.00

15,000.00 118,440.00

0.00 0.00

STUDY

1,741,200.00

1,741,200.00

1,741,200.00

1,631,117.59

110,082.41

STUDY

250,000.00

250,000.00

250,000.00

250,000.00

0.00

STUDY

2,744,898.00

2,744,898.00

2,744,898.00

2,502,202.79

242,695.21

STUDY

31,434.58

31,434.58

31,434.58

27,247.08

4,187.50

4,767,532.58

4,767,532.58

4,767,532.58

4,410,567.46

356,965.12

PLATTE 2 Total

SFC_FINANCE Total

Unspent Contracts ($) 35,832,405.67

270,130.20 3,255,264.64 4,352,178.55 22,810,937.00

PLATTE 1 Total

SFC_FINANCE

Expensed ($) 294,541,144.41

270,130.20 3,255,264.64 4,352,178.55 22,810,937.00

PLA01 LIBBEY ES

PLATTE 2

Awarded Contracts ($) 330,373,550.08

NEW CONSTRUCTION NEW CONST/RENO NEW CONST/RENO NEW CONSTRUCTION

PARK 6 Total PLATTE 1

Current Budget ($) 340,236,395.09

LAND PURCHASE FOR FUTURE ES POWELL HS DEMOLITION POWELL HS KITCHEN/CAFETERIA ADDITION POWELL MS NEW CONSTRUCTION RENOVATION PARKSIDE ES STUDY TO EVALUALTE CAPACITY  REMEDY

PARK 1 Total PARK 16 PARK 16 Total

Appropriation ($) 340,236,395.09

STATEWIDE PROJECTS NOT CHARGED TO ONE  SPECIFIC BUILDING

2015 STATEWIDE SECURITY ASSESSMENT; FACILITY  ENGINEERING ASSOCIATES (FEA) COMPONENT PRIORTIZATION STUDY (WHITE PAPER)  ASSET PRESERVATION 2016 STATEWIDE CONDITION ASSESSMENT; FACILITY  ENGINEERING ASSOCIATES (FEA) COLEMAN ENGINEERING 15‐16 CONTRACT  MISCELLANEOUS SERVICES

Page 29 of 91  

District SFC_PLANNING

Facility STATEWIDE PROJECTS NOT CHARGED TO ONE  SPECIFIC BUILDING

Description

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type

STATEWIDE FACILITY CAPACITY STUDY

950,000.00

872,200.00

872,200.00

0.00

2012 STATEWIDE FACILITY CONDITION ASSESSMENT;  FACILITY ENGINEERING ASSOCIATES (FEA) STUDY

3,727,589.00

3,727,589.00

3,727,589.00

3,727,589.00

0.00

4,677,589.00

4,677,589.00

4,599,789.00

4,599,789.00

0.00

COMPONENT COMPONENT NEW CONSTRUCTION

143,668.42 801,439.00 16,439,103.00 17,384,210.42

143,668.42 801,439.00 16,439,103.00 17,384,210.42

143,668.42 801,439.00 16,425,752.33 17,370,859.75

143,668.42 801,439.00 15,869,397.97 16,814,505.39

0.00 0.00 556,354.36 556,354.36

SHE02 FUTURE ES BUILDING SHE02 SHERIDAN HS

FUTURE ES BUILDING SITE SHERIDAN HS SECURITY VESTIBULE REPAIR WATER DISTRIBUTION SYSTEM AT SHERIDAN  HS BOILER BLDG BOILER PLANT REPLACEMENT SHERIDAN MS EMERGENCY FUNDING TO PROVIDE A  LONG‐TERM SOLUTION FOR A SLOPE FAILURE STORY ES RENOVATION NEW COFFEEN ES

NEW CONSTRUCTION COMPONENT

808,373.43 800,000.00

808,373.43 800,000.00

808,373.43 800,000.00

808,373.43 800,000.00

0.00 0.00

404,458.00 1,442,675.00

404,458.00 1,442,675.00

203,528.00 0.00

203,528.00 0.00

0.00 0.00

COMPONENT NEW CONST/RENO NEW CONSTRUCTION

429,614.00 1,343,882.86 14,754,867.31 19,983,870.60

429,614.00 1,343,882.86 14,754,867.31 19,983,870.60

429,614.00 1,343,882.86 14,375,976.61 17,961,374.90

429,614.00 1,343,882.86 13,936,733.31 17,522,131.60

0.00 0.00 439,243.30 439,243.30

SUB09 BIG PINEY ES

BIG PINEY ES SPECIAL ED MODULAR BIG PINEY HS ROOF REPLACEMENT BIG PINEY MS RENOVATION ADDITION BIG PINEY MS RENOVATION SPED ADDITION NEW BIG PINEY ES

MODULAR COMPONENT NEW CONST/RENO NEW CONST/RENO NEW CONSTRUCTION

72,833.69 2,748,399.09 1,870,635.00 318,484.00 12,963,928.79 17,974,280.57

72,833.69 2,748,399.09 1,870,635.00 318,484.00 12,963,928.79 17,974,280.57

72,833.69 2,748,399.09 720,606.21 318,484.00 12,963,928.79 16,824,251.78

72,833.69 2,748,399.09 692,557.71 300,544.45 12,963,928.79 16,778,263.73

0.00 0.00 28,048.50 17,939.55 0.00 45,988.05

SWE01 FUTURE ES BUILDING (K‐4) SWE01 FUTURE SATELLITE HS

FUTURE ES BUILDING SITE NEW SATELLITE HS

NEW CONSTRUCTION NEW CONSTRUCTION

4,000.00 4,405,159.00

4,000.00 4,405,159.00

4,000.00 3,901,024.00

2,500.00 2,533,549.71

1,500.00 1,367,474.29

SWE01 BLACK BUTTE HS SWE01 EASTSIDE ES SWE01 FARSON‐EDEN ES/MS/HS SWE01 STAGECOACH ES

NEW INDEPENDENCE ALTERNATIVE HS (BLACK BUTTE) NEW EASTSIDE ES NEW FARSEN‐EDEN K‐12 STAGECOACH ES K‐4 (ON BLM LAND) DESERT ES/MS RENOVATION FUNDING FROM MAJOR  MAINTENANCE

NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION NEW CONSTRUCTION

6,558,879.00 13,739,185.64 27,665,465.00 18,139,340.87

6,558,879.00 13,739,185.64 27,665,465.00 18,139,340.87

6,508,879.00 13,739,185.64 22,991,683.48 18,139,340.87

6,437,933.50 13,739,185.64 14,066,109.56 18,027,456.81

70,945.50 0.00 8,925,573.92 111,884.06

0.00

0.00

0.00

0.00

0.00

70,512,029.51

70,512,029.51

65,284,112.99

54,806,735.22

10,477,377.77

495,937.00

495,937.00

495,937.00

489,420.26

6,516.74

COMPONENT COMPONENT

SHERIDAN 2 Total SUB09 BIG PINEY ES SPECIAL ED MODULAR  (DISPOSED) SUB09 BIG PINEY HS SUB09 BIG PINEY MS

SUBLETTE 9 Total

SWE01 DESERT ES/MS

RENOVATION

SWEETWATER 1  Total

SWEETWATER 2

Unspent Contracts ($)

TONGUE RIVER ES BUS LOOP RECONSTRUCTION TONGUE RIVER MS BOILER REPLACEMENT NEW TONGUE RIVER ES

SHE02 SHERIDAN JHS SHE02 STORY ES SHE02 HENRY A. COFFEEN ES

SWEETWATER 1

Expensed ($)

SHE01 OLD TONGUE RIVER ES SHE01 TONGUE RIVER MS SHE01 TONGUE RIVER ES

SHE02 SHERIDAN HS ‐ BOILER BLDG

SUBLETTE 9

Awarded Contracts ($)

950,000.00

SHERIDAN 1 Total SHERIDAN 2

Current Budget ($)

STUDY

SFC_PLANNING  Total SHERIDAN 1

Appropriation ($)

SWE02 MONROE INTERMEDIATE SCHOOL ‐  TRANSPORTATION SHOP

MONROE INTERMEDIATE SCHOOL TRANSPORTATION  SHOP FUEL TANK RELOCATION COMPONENT

Page 30 of 91  

District Facility SWEETWATER 2 SWE02 THOMAN RANCH ES/MS SWE02 EXPEDITION ACADEMY HS SWE02 WILSON BUILDING (FUTURE ADMIN) SWE02 GRANGER ES SWE02 LINCOLN MS SWE02 MONROE INTERMEDIATE SCHOOL SWE02 HARRISON ES

Description THOMAN RANCH ES/MS MODULAR

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type MODULAR

NEW EXPEDITION ACADEMY (CHURCH RENOVATION) OLD WILSON ES RENOVATION ADDITION NEW GRANGER ES LINCOLN MS RENOVATION MONROE INTERMEDIATE SCHOOL RENOVATION HARRISON ES ROOF REPLACEMENT

NEW CONST/RENO NEW CONST/RENO NEW CONSTRUCTION RENOVATION RENOVATION COMPONENT

SWEETWATER 2  Total TETON 1

WASHAKIE 2 Total

2,106,278.58 3,343,001.50 1,373,867.24 2,719,984.50 10,322,313.00 240,215.00

2,106,278.58 3,343,001.50 1,373,867.24 2,719,984.50 10,322,313.00 240,215.00

2,106,278.58 3,256,723.00 1,365,122.75 2,479,401.00 10,199,254.12 0.00

2,106,225.73 2,199,891.80 1,310,253.38 299,423.28 10,197,812.47 0.00

52.85 1,056,831.20 54,869.37 2,179,977.72 1,441.65 0.00

20,767,306.82

20,767,306.82

20,050,524.24

16,746,780.47

3,303,743.77

468,600.00 34,973,819.00 230,000.00 230,000.00 35,902,419.00

0.00 30,728,851.39 230,000.00 230,000.00 31,188,851.39

0.00 4,866,411.91 230,000.00 230,000.00 5,326,411.91

0.00 25,862,439.48 0.00 0.00 25,862,439.48

UIN01 ASPEN ES UIN01 EVANSTON MS

ROOF REPLACEMENT AT ASPEN ES K‐5 EVANSTON MS RENOVATION ADDITION

COMPONENT NEW CONST/RENO

610,500.00 22,005,370.27 22,615,870.27

610,500.00 22,005,370.27 22,615,870.27

610,500.00 21,893,123.65 22,503,623.65

610,500.00 20,730,695.81 21,341,195.81

0.00 1,162,427.84 1,162,427.84

UIN04 MOUNTAIN VIEW MS LEASE MODULAR 1  (DISPOSED) UIN04 MOUNTAIN VIEW ES/MS

MOUNTAIN VIEW MS MODULAR #1 NEW MOUNTAIN VIEW K‐8

MODULAR NEW CONSTRUCTION

66,738.52 28,772,410.97 28,839,149.49

66,738.52 28,772,410.97 28,839,149.49

66,738.52 28,772,410.97 28,839,149.49

66,738.52 28,524,637.85 28,591,376.37

0.00 247,773.12 247,773.12

UIN06 LYMAN HS

LYMAN ADMINISTRATION BUILDING RENOVATION URIE ES ADDITION URIE ES PLANNING STUDY FOR CAPACITY REMEDY URIE ES HEATERS LYMAN HS ROOF REPLACEMENT

NEW CONSTRUCTION NEW CONST/RENO NEW CONST/RENO COMPONENT COMPONENT

2,421,700.12 316,158.00 0.00 300,000.00 1,250,000.00 4,287,858.12

2,421,700.12 316,158.00 0.00 300,000.00 1,250,000.00 4,287,858.12

2,421,700.12 162,429.00 0.00 0.00 1,130,120.00 3,714,249.12

2,421,700.12 110,326.94 0.00 0.00 0.00 2,532,027.06

0.00 52,102.06 0.00 0.00 1,130,120.00 1,182,222.06

WAS01 WORLAND HS (9‐12) AQUATIC CENTER  (DEMOLISHED) WAS01 EASTSIDE ES

WORLAND HS AQUATIC CENTER DEMOLITION EASTSIDE ES ADDITION

DEMOLITION NEW CONST/RENO

181,261.47 50,000.00

181,261.47 50,000.00

181,261.47 0.00

181,261.47 0.00

0.00 0.00

231,261.47

231,261.47

181,261.47

181,261.47

0.00

745,593.00 101,600.00

745,593.00 101,600.00

714,976.00 101,600.00

714,939.66 101,100.00

36.34 500.00

847,193.00

847,193.00

816,576.00

816,039.66

536.34

UIN06 LYMAN ADMINISTRATION BUILDING  (DEMOLISHED) UIN06 URIE ES

WASHAKIE 1 Total WASHAKIE 2

Unspent Contracts ($) 4,054.24

468,600.00 34,973,819.00 230,000.00 230,000.00 35,902,419.00

UINTA 6 Total

WASHAKIE 1

Expensed ($) 143,753.55

NEW CONSTRUCTION NEW CONSTRUCTION MODULAR MODULAR

UINTA 4 Total

UINTA 6

Awarded Contracts ($) 147,807.79

NEW TRANSPORTATION BUILDING MUNGER MOUNTAIN ES DAVY JACKSON ES MODULAR #4 DAVY JACKSON ES MODULAR #5

UINTA 1 Total

UINTA 4

Current Budget ($) 165,710.00

TET01 FUTURE TRANSPORTATION BUILDING TET01 MUNGER MOUNTAIN ES (NEW) TET01 DAVY JACKSON ES ‐ MODULAR #4 TET01 DAVY JACKSON ES ‐ MODULAR #5

TETON 1 Total UINTA 1

Appropriation ($) 165,710.00

WAS02 FUTURE K‐12 SCHOOL WAS02 TEN SLEEP ES/MS/HS

FUTURE K‐12 SCHOOL TEN SLEEP ES/MS/HS REMEDY

NEW CONSTRUCTION NEW CONSTRUCTION

Page 31 of 91  

District WESTON 1

Facility WES01 NEWCASTLE ES SFC MODULAR #3  (DISPOSED)

Description

SCHOOL FACILITIES DEPARTMENT LSO REPORT 06/30/2017 Type

WES01 TRANSPORTATION BUS BARN

NEW CASTLE ES MODULAR #3 REPLACE EXTERNAL SIDING FOR SAFETY AND HEALTH  AT NEWCASTLE HS NEWCASTLE ES ADDITION NEWCASTLE ES INSTALL PRIVATE  SHOWER/RESTROOM BUS BARN FUELING STATION REPLACEMENT

WES07 UPTON ES/MS

UPTON ES/MS PARKING LOT RECONFIG/PARENT  DROP‐OFF/DELIVERY AREA/CREATION OF BUS LOOP

SHE03 CLEARMONT ES BUS BARN SITE  (PROPOSED NEW) (REPLACE BUS BARN  DESTROYED IN FIRE)

PLANNING STUDY FOR NEW BUS FACILITY (POSSIBLE  COST RE‐IMB. FROM INSURANCE) STUDY

SHE03 ARVADA‐CLEARMONT JHS/HS

CLEARMONT ARVADA JR/SR HS BOILER CONVERSION COMPONENT

STATEWIDE SECURITY PROJECTS

STATEWIDE SECURITY PROJECTS

WES01 NEWCASTLE HS WES01 NEWCASTLE ES

MODULAR

SHERIDAN 3

Grand Total

FRE06 WIND RIVER JHS/HS

WIND RIVER MS/HS HEATING & COOLING SYSTEM

Expensed ($)

Unspent Contracts ($)

0.00

0.00

0.00

COMPONENT NEW CONST/RENO

550,000.00 2,716,072.00

550,000.00 2,716,072.00

475,475.56 2,716,072.00

437,602.61 2,716,072.00

37,872.95 0.00

NEW CONST/RENO NEW CONSTRUCTION

77,564.76 482,252.46 3,825,889.22

77,564.76 482,252.46 3,825,889.22

77,564.76 482,252.46 3,751,364.78

77,564.76 482,252.46 3,713,491.83

0.00 0.00 37,872.95

COMPONENT

1,292,658.25 1,292,658.25

1,292,658.25 1,292,658.25

1,292,658.25 1,292,658.25

1,292,658.25 1,292,658.25

0.00 0.00

0.00

0.00

0.00

0.00

0.00

727,670.00 727,670.00

727,670.00 727,670.00

722,692.00 722,692.00

649,871.20 649,871.20

72,820.80 72,820.80

8,059,586.58

8,059,586.58

2,107,895.47

1,709,016.55

398,878.92

8,059,586.58

8,059,586.58

2,107,895.47

1,709,016.55

398,878.92

2,011,958.00 2,011,958.00

2,011,958.00 2,011,958.00

0.00 0.00

0.00 0.00

0.00 0.00

1,380,610,460.98

1,380,610,460.98

1,279,549,103.85

1,160,143,520.76

119,405,583.09

SECURITY

SCHOOL FACILITIES  DEPARTMENT Total FREMONT 6 FREMONT 6 Total

Awarded Contracts ($)

0.00

SHERIDAN 3 Total SCHOOL  FACILITIES  DEPARTMENT

Current Budget ($)

0.00

WESTON 1 Total

WESTON 7 WESTON 7 Total

Appropriation ($)

COMPONENT

Page 32 of 91  

2017 Major Maintenance Report

District (A) Albany #1 Big Horn #1 Big Horn #2 Big Horn #3 Big Horn #4 Campbell #1 Carbon #1 Carbon #2 Converse #1 Converse #2 Crook #1 Fremont #1 Fremont #2 Fremont #6* Fremont #14 Fremont #21 Fremont #24 Fremont #25 Fremont #38 Goshen #1 Hot Springs #1 Johnson #1 Laramie #1 Laramie #2 Lincoln #1 Lincoln #2 Natrona #1 Niobrara #1 Park #1 Park #6 Park #16 Platte #1 Platte #2 Sheridan #1 Sheridan #2 Sheridan #3 Sublette #1 Sublette #9 Sweetwater #1 Sweetwater #2 Teton #1 Uinta #1 Uinta #4 Uinta #6 Washakie #1 Washakie #2 Weston #1 Weston #7

Expenditures Reported by Districts for FY17 (B) $1,881,719.49 $416,010.10 $522,945.53 $472,581.02 $89,802.25 $1,574,353.96 $2,045,960.24 $752,390.34 $1,751,129.56 $520,395.71 $1,585,949.69 $622,510.41 $269,388.55 $506,691.90 $239,393.70 $31,723.00 $196,287.74 $971,066.41 $423,122.19 $453,553.15 $341,029.71 $1,067,363.97 $6,171,251.00 $581,132.42 $199,121.92 $1,988,417.49 $3,689,197.09 $277,602.11 $1,877,837.96 $1,319,489.11 $144,843.84 $756,740.37 $251,471.22 $927,300.93 $315,257.35 $51,456.48 $238,906.24 $94,712.46 $4,933,173.02 $1,817,232.09 $208,643.10 $1,301,622.61 $1,641,565.29 $140,274.60 $1,644,914.54 $109,523.55 $385,549.16 $234,238.61 $48,036,843.18

Total Interest Earned for Year (C) $4,514.17 $15,849.19 $2,070.33 $162.04 $5,763.45 $48,012.54 $5,241.01 $6,595.69 $2,856.76 $2,016.76 $12,280.35 $4,272.67 $3,641.57 ($4,410.64) $932.37 $724.93 $1,858.66 $5,516.01 $2,185.11 $18,273.27 $2,364.67 $605.34 $53,845.73 $1,906.31 $1,344.09 $4,782.67 $7,680.88 $2,330.48 $12,881.23 $3,092.12 $0.00 $97.14 $872.15 $0.00 $8,152.78 $192.40 $3,435.62 $10,261.12 $13,426.35 $16,815.60 $286.21 $12,087.62 $9,152.15 $3,348.25 $5,648.32 $387.24 $827.15 $1,613.69 $315,793.55

Ending Bank Balances as Reported by districts for period ending 6-30-17 (D) $1,701,624.87 $2,908,583.67 $242,593.24 $8,559.52 $1,626,355.13 $9,677,144.61 $1,985,195.47 $1,169,100.70 $213,737.30 $321,735.99 $1,768,525.68 $1,364,738.96 $524,290.88 $823,106.63 $1,380,199.64 $714,972.40 $1,462,901.75 $3,418,534.25 $25,544.32 $2,142,226.26 $463,177.97 $268,038.19 $9,209,843.01 $731,433.74 $2,071,621.74 $882,685.48 $7,818,024.89 $446,587.88 $1,300,179.46 $632,901.89 $90,706.83 $668,949.49 $479,528.62 $151,898.42 $1,797,278.40 $80,765.96 $626,110.52 $2,095,093.56 $3,225,917.65 $2,556,859.50 $3,176,144.12 $1,618,873.38 $1,975,607.37 $994,168.61 $825,286.69 $234,994.18 $652,009.69 $440,190.85 $78,994,549.36

July , 2017 Payment (E) 1,787,342.85 676,001.17 577,413.29 474,623.71 349,355.49 5,196,296.08 918,887.61 766,470.07 1,219,544.43 554,172.28 1,065,253.39 1,256,627.08 230,947.98 362,992.89 569,356.86 326,588.24 18,783.02 1,516,157.25 316,842.56 1,495,883.67 565,536.57 1,050,982.36 7,745,070.87 825,822.42 419,751.37 1,730,935.67 6,569,851.46 498,730.90 1,233,978.41 1,312,812.34 182,503.39 855,297.96 260,703.09 790,334.21 2,030,775.52 155,880.71 783,452.30 687,725.31 3,190,802.45 1,823,239.23 1,581,797.57 1,864,293.62 595,490.18 560,515.15 976,249.87 164,634.37 668,695.17 309,068.43

$59,114,470.82

Total Col. (D) + Col. (E) (F) $3,488,967.72 $3,584,584.84 $820,006.53 $483,183.23 $1,975,710.62 $14,873,440.69 $2,904,083.08 $1,935,570.77 $1,433,281.73 $875,908.27 $2,833,779.07 $2,621,366.04 $755,238.86 $1,186,099.52 $1,949,556.50 $1,041,560.64 $1,481,684.77 $4,934,691.50 $342,386.88 $3,638,109.93 $1,028,714.54 $1,319,020.55 $16,954,913.88 $1,557,256.16 $2,491,373.11 $2,613,621.15 $14,387,876.35 $945,318.78 $2,534,157.87 $1,945,714.23 $273,210.22 $1,524,247.45 $740,231.71 $942,232.63 $3,828,053.92 $236,646.67 $1,409,562.82 $2,782,818.87 $6,416,720.10 $4,380,098.73 $4,757,941.69 $3,483,167.00 $2,571,097.55 $1,554,683.76 $1,801,536.56 $399,628.55 $1,320,704.86 $749,259.28 $138,109,020.18

*Fremont # 6 invests their MM funds into bonds. When the investment is made, the district records the amount less then face value as a loss. This loss is recorded on their ledger as a negative interest earned until the bond matures.

Page 33 of 91

School Facilities Division Emergency Facility Needs July 2016 - June 2017

District

Project EMERGENCY - COMMISSION APPROVED REQUEST TO TRANSFER EMERGENCY FUNDING FROM CP #1203 TO CP #1000 FOR LEASE PAYMENTS AT INDIAN PAINTBRUSH MODULAR

Albany 1 Total

Date Passed by SFC

May 8, 2017 $ $

Funding Amount

50,000.00 50,000.00

Page 34 of 91

School Facilities Division B-11 Report July 2016 - June 2017 District Project Natrona 1 1107

Description Moved from Design to Construction

Date Approved Funding Amount Transferred 11/9/2016 $ 834,776.00

Page 35 of 91

School Facilities Division Closed / Demolished / Disposed Buildings July 1, 2016 Through June 30, 2017 Description Property District 0101-013-0100 ALB01 ALB01 SYBILLE ES (COMMUNITY CTR) (CLOSED) 0101-021-0100 ALB01 ALB01 OLD LARAMIE HS (DEMOLISHED)

Status CLOSED DEMOLISHED

Gross sq ft 1,150 205,422

0101-021-0102 ALB01

DEMOLISHED

3,584

0101-028-0100 0101-030-0100 0204-008-0100

DISPOSED DISPOSED DEMOLISHED

15,673 924 7,023

0301-023-0114

ALB01 OLD LARAMIE HS - PORTABLE NO. 1 (DEMOLISHED) ALB01 MONTESSORI CHARTER SCHOOL BUILDING K-6 ALB01 (LINCOLN COMMUNITY CENTER) ALB01 ALB01 NOTCH PEAK SCHOOL (DISPOSED) BIG04 BIG04 4TH STREET BUS BARN (DEMOLISHED) CAM01 CAMPBELL COUNTY HS - NORTH HOUSE B CAM01 (DISPOSED)

DISPOSED

1,686

0301-023-0116 CAM01 CAM01 CAMPBELL COUNTY HS - HOUSE A (DISPOSED)

DISPOSED

2,796

0301-024-0100 CAM01 CAM01 WESTWOOD HS (9-12) MAIN BLDG (DISPOSED)

DISPOSED

21,375

DEMOLISHED

15,279

DEMOLISHED DEMOLISHED

6,308 220,961

0401-013-0101 CAR01 0401-007-0100 CAR01 0401-008-0100 CAR01

CAR01 RAWLINS STADIUM BUS BARN (DEMOLISHED) CAR01 RAWLINS STADIUM EAST BUS STORAGE (DEMOLISHED) CAR01 RAWLINS HS (DEMOLISHED) CAR01 RAWLINS HS - OCCUPATIONAL BLDG (DEMOLISHED) CAR01 BAIROIL ES (K-5) (DISPOSED) CAR01 MOUNTAIN VIEW ES (DEMOLISHED)

DEMOLISHED DISPOSED DEMOLISHED

9,364 3,917 30,436

0401-008-0101 CAR01 0401-009-0100 CAR01

CAR01 MOUNTAIN VIEW ES MODULAR # 1 (DISPOSED) CAR01 PERSHING ES MAIN BLDG (DISPOSED)

DISPOSED DISPOSED

1,440 31,281

0401-009-0101 CAR01 0401-009-0102 CAR01

CAR01 PERSHING ES SPANISH/COMPUTER LAB (DISPOSED) DISPOSED CAR01 PERSHING ES MODULAR 2 (DISPOSED) DISPOSED

1,799 1,440

0402-004-0100 CAR02 0402-004-0101 CAR02 0402-012-0100 CAR02

CAR02 OLD HANNA ES MAIN BLDG K-6 (DEMOLISHED) CAR02 HANNA ES BOILER BLDG (DEMOLISHED) CAR02 MEDICINE BOW K-12 (DISPOSED) CON01 WALKER CREEK PORTABLE MODULAR 5 (DISPOSED) CON01 DRY CREEK ES (K-8) (DISPOSED) CON01 MOSS AGATE ES (K-8) (DISPOSED) CON01 WAGONHOUND ES MAIN BLDG (DISPOSED) CON01 WHITE ES MAIN BLDG K-8 (DISPOSED) CON01 DOUGLAS HS (9-12) ANNEX (DISPOSED) CON02 HOUSE 638 S 3RD ST (DEMOLISHED) CON02 BOXELDER ES - MODULAR #1 TEACHERAGE (DISPOSED) CRO01 OLD SUNDANCE CENTRAL OFFICE/STORAGE (DEMOLISHED) CRO01 MOORCROFT ES MAIN BLDG K-6 (DISPOSED) FRE01 LANDER VALLEY HS (9-12) (DEMOLISHED) FRE01 PATHFINDER HS (DISPOSED)

0401-001-0103 CAR01 0401-001-0104 CAR01 0401-013-0100 CAR01

0501-003-0100 0501-004-0100 0501-006-0100 0501-009-0100 0501-011-0100 0501-014-0101 0502-006-0102

CON01 CON01 CON01 CON01 CON01 CON01 CON02

0502-004-0100 CON02 0601-001-0100 0601-004-0100 0701-009-0100 0701-010-0100

CRO01 CRO01 FRE01 FRE01

DEMOLISHED DEMOLISHED DISPOSED

48,512 925 77,701

DISPOSED DISPOSED DISPOSED DISPOSED DISPOSED DISPOSED DEMOLISHED

1,680 1,713 1,713 600 1,713 1,469 1,287

DISPOSED DEMOLISHED DISPOSED DEMOLISHED DISPOSED

504 33,017 64,925 176,936 15,857

Page 36 of 91

School Facilities Division Closed / Demolished / Disposed Buildings July 1, 2016 Through June 30, 2017 Description Property District 0714-001-0100 FRE14 FRE14 WYOMING INDIAN ES K-5 (DEMOLISHED) 0714-001-0101 FRE14 FRE14 WYOMING INDIAN ES - GYM (DEMOLISHED) 0724-002-0101 FRE24 FRE24 OLD SHOSHONI ES/MS HS (DEMOLISHED) FRE24 OLD SHOSHONI ES/MS/HS - INDUSTRIAL ARTS/AG 0724-002-0102 FRE24 (DEMOLISHED) FRE24 OLD SHOSHONI ES/MS/HS - AG/HORTICULTURE 0724-002-0103 FRE24 CLASSROOM (DEMOLISHED) FRE24 OLD SHOSHONI ES/MS/HS - DISTRICT 0724-002-0100 FRE24 ADMINISTRATION (DISPOSED) FRE24 OLD SHOSHONI ES/MS/HS - PRE-K/HOSPITALITY 0724-002-0107 FRE24 CLASSROOM (DISPOSED) 0725-006-0109 FRE25 FRE25 RENDEZVOUS ES - MODULAR #1 (DISPOSED) 0725-006-0110 FRE25 FRE25 RENDEZVOUS ES - MODULAR #2 (DISPOSED) 0725-006-0111 FRE25 FRE25 RENDEZVOUS ES - MODULAR #3 (DISPOSED)

Status DEMOLISHED DEMOLISHED DEMOLISHED

Gross sq ft 55,515 22,665 98,750

DEMOLISHED

8,593

DEMOLISHED

1,800

DISPOSED

5,677

DISPOSED DISPOSED DISPOSED DISPOSED

1,937 1,536 1,536 1,536

0738-001-0100 FRE38

FRE38 ARAPAHOE ES/MS (K-8) PRIMARY (DEMOLISHED)

DEMOLISHED

56,794

0801-012-0106 GOS01

GOS01 LINGLE-FORT LARAMIE ES K-5 (DEMOLISHED) GOS01 LAGRANGE SCHOOL GYM, AUDITORIUM & OLD HS (DISPOSED) GOS01 LINCOLN ES (OLD) (DISPOSED)

DEMOLISHED

26,229

DISPOSED DISPOSED

34,600 39,400

GOS01 FORT LARAMIE GARAGE AND SHOP (DISPOSED) GOS01 FORT LARAMIE MS (6-8) (DISPOSED) GOS01 FORT LARAMIE MS (6-8) INDUSTRIAL ARTS BLDG (DISPOSED)

DISPOSED DISPOSED

800 23,500

DISPOSED

3,520

GOS01 FORT LARAMIE MS (6-8) BUS GARAGE (DISPOSED) GOS01 FORT LARAMIE MS (6-8) GARAGE (DISPOSED) GOS01 SOUTHEAST ES/MS/HS (K-12) RED BRICK SCHOOL (DISPOSED) GOS01 SOUTHEAST ES/MS/HS (K-12) BUS GARAGE (DISPOSED) GOS01 SOUTHEAST ES/MS/HS (K-12) YODER MECHANICS SHOP (DISPOSED) GOS01 SOUTHEAST ES/MS/HS (K-12) NORTH BUS GARAGE (DISPOSED)

DISPOSED DISPOSED

780 318

DISPOSED

9,180

DISPOSED

556

DISPOSED

2,696

DISPOSED

556 720

0801-014-0102 GOS01

GOS01 YODER MECHANICS SHOP & BUS BARN (DISPOSED) DISPOSED GOS01 YODER MECHANICS SHOP & BUS BARN NORTH BUS GARAGE (DISPOSED) DISPOSED GOS01 YODER MECHANICS SHOP & BUS BARN SOUTH BUS GARAGE (DISPOSED) DISPOSED

0801-015-0100 GOS01

GOS01 SOUTHEAST JR/SR HIGH CONCESSIONS (DISPOSED)

DISPOSED

400

0801-016-0100 GOS01

GOS01 LAGRANGE MAINTENANCE & STORAGE (DISPOSED) DISPOSED

700

0801-017-0100 GOS01

GOS01 LINGLE-FORT LARAMIE BUS BARN #1 (DISPOSED)

DISPOSED

2,800

0801-017-0101 GOS01

GOS01 LINGLE-FORT LARAMIE BUS BARN #2 (DISPOSED)

DISPOSED

20,300

0801-004-0101 GOS01 0801-006-0100 GOS01 0801-008-0100 GOS01 0801-009-0100 GOS01 0801-009-0101 GOS01 0801-009-0102 GOS01 0801-009-0103 GOS01 0801-011-0102 GOS01 0801-011-0105 GOS01 0801-011-0109 GOS01 0801-011-0110 GOS01 0801-014-0100 GOS01 0801-014-0101 GOS01

720 3,084

Page 37 of 91

School Facilities Division Closed / Demolished / Disposed Buildings July 1, 2016 Through June 30, 2017 Property 1001-008-0100 1101-005-0100 1101-025-0100 1101-006-0106

District JOH01 LAR01 LAR01 LAR01

1101-021-0107 LAR01 1101-022-0101 LAR01 1101-027-0101 LAR01 1101-032-0107 LAR01 1101-032-0108 1101-033-0109 1101-033-0110 1101-033-0111 1101-033-0112

LAR01 LAR01 LAR01 LAR01 LAR01

1101-048-0100 LAR01 1102-003-0100 LAR02 1102-003-0111 1202-003-0100 1301-008-0100 1301-008-0105 1301-008-0106 1301-008-0107 1301-013-0100 1301-013-0101 1301-013-0103 1301-013-0104 1301-015-0100 1301-027-0100

LAR02 LIN02 NAT01 NAT01 NAT01 NAT01 NAT01 NAT01 NAT01 NAT01 NAT01 NAT01

1301-027-0101 NAT01 1301-021-0100 NAT01 1301-022-0100 1301-025-0105 1301-025-0106 1301-025-0107 1301-025-0108 1301-030-0102

NAT01 NAT01 NAT01 NAT01 NAT01 NAT01

1301-030-0103 1301-030-0104 1301-030-1020 1301-032-0100

NAT01 NAT01 NAT01 NAT01

1301-032-0104 NAT01

Description JOH01 BUFFALO HS (9-12) MAIN BLDG (DISPOSED) LAR01 BAGGS ES MAIN BLDG (DEMOLISHED) LAR01 ROSSMAN ES MAIN BLDG (DEMOLISHED) LAR01 BAIN ES MODULAR NO. 6 (DISPOSED) LAR01 JESSUP ES MODULAR 201 (MOVED TO SADDLERIDGE ES 1101-046-0102) LAR01 LEBHART ES MODULAR NO. 1 (DISPOSED) LAR01 ANDERSON ES MODULAR 101 (MOVED TO SADDLERIDGE ES 1101-046-0103)

Status DISPOSED DEMOLISHED DEMOLISHED DISPOSED

Gross sq ft 93,903 30,525 21,925 1,645

DISPOSED DISPOSED

1,536 1,645

DISPOSED

1,536

LAR01 MODULAR - SATELLITE CENTRAL HS (DISPOSED) LAR01 MODULAR SATELLITE CENTRAL HIGH SCHOOL (DISPOSED) LAR01 MODULAR - SATELLITE EAST HS (DISPOSED) LAR01 MODULAR - SATELLITE EAST HS (DISPOSED) LAR01 MODULAR SATELLITE EAST HS (DISPOSED) LAR01 MODULAR SATELLITE - EAST HS (DISPOSED) LAR01 INDEPENDENT LIVING SKILLS CLASS (ILSC) APARTMENT (DISPOSED) LAR02 PINE BLUFFS K-6 ES NORTH & SOUTH (1961) (DEMOLISHED)

DISPOSED

N/A

DISPOSED DISPOSED DISPOSED DISPOSED DISPOSED

N/A N/A N/A N/A N/A

DISPOSED

N/A

DEMOLISHED

35,583

LAR02 PINE BLUFFS ES OUTSIDE FREEZER (DISPOSED) LIN02 OLD SWIFT CREEK HS (DEMOLISHED) NAT01 GRANT ES (CLOSED) NAT01 GRANT ES - STORAGE SHED #29 (CLOSED NAT01 GRANT ES - STORAGE SHED #30 (CLOSED) NAT01 GRANT ES - STORAGE SHED #30 (CLOSED) NAT01 MILLS ES (CLOSED) NAT01 MILLS ES - MODULAR #3 (CLOSED) NAT01 MILLS ES - MODULAR #2 (CLOSED) NAT01 MILLS ES - STORAGE SHED #48 (CLOSED) NAT01 NORTH CASPER ES MAIN BLDG K-5 (CLOSED) NAT01 WILLOW CREEK ES/RESIDENCE K-6 (CLOSED) NAT01 WILLOW CREEK ES/RESIDENCE STORAGE SHED #59(CLOSED) NAT01 RED CREEK ES MAIN BLDG K-6

DISPOSED DEMOLISHED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

96 49,246 29,296 96 96 96 30,268 864 864 120 34,075 2,807

CLOSED DEMOLISHED

96 1,449

NAT01 SOUTHRIDGE ES (OLD) MAIN BLDG (DEMOLISHED) NAT01 WESTWOOD ES #R-11 (DEMOLISHED) NAT01 WESTWOOD ES #R-12 (DEMOLISHED) NAT01 WESTWOOD ES #R-13 (DEMOLISHED) NAT01 WESTWOOD ES #R-14 (DEMOLISHED) NAT01 PORTABLE BUILDING (DEMOLISHED) NAT01 BAR NUNN PORTABLE BUILDING K-6 (DEMOLISHED) NAT01 BAR NUNN ES PORTABLE 1 (IDEMOLISHED) NAT01 BAR NUNN ES - PORTABLE (DEMOLISHED) NAT01 CY JR HIGH MAIN BLDG 6-9 (DEMOLISHED)

DEMOLISHED DEMOLISHED DEMOLISHED DEMOLISHED DEMOLISHED DEMOLISHED

29,086 1,440 1,440 1,440 1,440 768

DEMOLISHED DEMOLISHED DEMOLISHED DEMOLISHED

576 720 720 117,500

NAT01 CY JR. HIGH PORTABLE 4 (#R-7) (DEMOLISHED)

DEMOLISHED

1,440 Page 38 of 91

School Facilities Division Closed / Demolished / Disposed Buildings July 1, 2016 Through June 30, 2017 Property

District

Description

Status

Gross sq ft

1301-036-0100 NAT01

NAT01 KELLY WALSH HS MAIN BLDG 9-12 (DEMOLISHED)

DEMOLISHED

342,778

1301-036-0103 NAT01

NAT01 KELLY WALSH HS PORTABLE 300 (DEMOLISHED)

DEMOLISHED

768

1301-036-0104 NAT01

DEMOLISHED

864

1301-036-0105 NAT01

NAT01 KELLY WALSH HS PORTABLE 303 (DEMOLISHED) NAT01 KELLY WALSH HS PORTABLE 250/251 (DEMOLISHED)

DEMOLISHED

1,440

1301-036-0106 NAT01

NAT01 KELLY WALSH HS PORTABLE 301 (DEMOLISHED)

DEMOLISHED

576

1301-036-0107 NAT01

DEMOLISHED

576

DEMOLISHED

1,440

DEMOLISHED

80

DEMOLISHED DEMOLISHED DISPOSED DISPOSED DISPOSED

864 1,440 22,015 1,440 96

1301-039-0100 NAT01

NAT01 KELLY WALSH HS PORTABLE 302 (DEMOLISHED) NAT01 KELLY WALSH HS PORTABLE 252/253 (DEMOLISHED) NAT01 KELLY WALSH HS SHOP STORAGE BLDG (SHED)(DEMOLISHED) NAT01 KELLY WALSH HS MASONRY CLASS 9-12 (DEMOLISHED) NAT01 PORTABLE BUILDING (DEMOLISHED) NAT01 FAIRGROUNDS CENTER NAT01 UNIVERSITY PARK ES - MODULAR #2 NAT01 CY JHS - STORAGE SHED #43 (DISPOSED) NAT01 DEAN MORGAN JR. HIGH PORTABLE 2 (#R-6) (DISPOSED) NAT01 ROOSEVELT HS MAIN BLDG 7-12 (ALT. SCHOOL)(DISPOSED)

1301-039-0106 NAT01

1301-036-0108 NAT01 1301-036-0109 NAT01 1301-036-0110 1301-036-0112 1301-006-0100 1301-023-0101 1301-032-0105

NAT01 NAT01 NAT01 NAT01 NAT01

1301-033-0102 NAT01

DISPOSED

1,440

DISPOSED

22,490

NAT01 ROOSEVELT HS PORTABLE BUILDING (DISPOSED)

DISPOSED

1,440

1301-039-0107 NAT01

NAT01 ROOSEVELT HS STORAGE SHED #24 (DISPOSED)

DISPOSED

128

1301-039-0108 NAT01

NAT01 ROOSEVELT HS STORAGE SHED #25 (DISPOSED)

DISPOSED

168

1301-039-0110 NAT01 1501-006-0100 PAR01 1506-003-0100 PAR06

NAT01 ROOSEVELT HS STORAGE SHED #27 (DISPOSED) PAR01 OLD POWELL MS (DEMOLISHED) PAR06 SUNSET ES BLDG (DEMOLISHED) SHE01 TONGUE RIVER ES - ART/MUSIC MODULAR (DISPOSED) SHE01 BIG HORN JR/SR HS BUS BARN (DISPOSED) SHE01 TONGUE RIVER BUS BARN BLDG (DISPOSED) SHE02 COFFEEN ES (K-5) MAIN BLDG (DEMOLISHED) SHE02 FORT MACKENZIE ADMIN/ FORT MACKENZIE SCHOOL (DISPOSED) SHE03 CLEARMONT ES BUS BARN 1 (DEMOLISHED) SHE03 OLD ROCK SCHOOL HOUSE SHE03 ARVADA ES MAIN BLDG (DISTRICT LEASING PART OF BUILDING) SHE03 CLEARMONT ES MAIN BLDG K-6 SUB01 PINEDALE HS (9-12) FREMONT RENTAL HOUSE (DEMOLISHED)

DISPOSED DEMOLISHED DEMOLISHED

200 14,888 49,657

DISPOSED DISPOSED DISPOSED DEMOLISHED

1,650 6,648 3,500 39,799

DISPOSED DEMOLISHED DEMOLISHED

5,238 3,084 1,122

DISPOSED DISPOSED

6,902 4,402

DEMOLISHED

1,027

1701-003-0104 1701-005-0103 1701-007-0100 1702-003-0100

SHE01 SHE01 SHE01 SHE02

1702-012-0100 SHE02 1703-002-0102 SHE03 1703-003-0102 SHE03 1703-001-0100 SHE03 1703-002-0100 SHE03 1801-005-0106 SUB01

Page 39 of 91

School Facilities Division Closed / Demolished / Disposed Buildings July 1, 2016 Through June 30, 2017 Property

District

1901-015-0100 SWE01 1901-005-0101 SWE01 1901-005-0102 SWE01 1901-005-0103 SWE01 1902-005-0100 SWE02 2001-004-0100 TET01 2001-007-0100 TET01 2101-001-0101 2101-007-0102 2101-007-0105 2101-007-0106 2101-010-0100

UIN01 UIN01 UIN01 UIN01 UIN01

2104-004-0100 UIN04 2307-006-0101 WES07

Description

Status

Gross sq ft

SWE01 ROCK SPRINGS EAST JR HS (7-8) (DEMOLISHED) SWE01 INDEPENDENCE HS (9-12) MUSIC AND ARTS (DISPOSED)

DEMOLISHED DISPOSED

1,468

SWE01 INDEPENDENCE HS (9-12) RESOURCE (DISPOSED) SWE01 INDEPENDENCE HS (9-12) RESOURCE/CLASSROOM (DISPOSED) SWE02 THOMAN RANCH ES/MS (K-8) (DISPOSED) TET01 DAVY JACKSON ES MAIN BLDG (OLD) (DEMOLISHED) TET01 DISTRICT OFFICES (DEMOLISHED) UIN01 CENTRAL ADMIN COMPLEX KITCHEN (DEMOLISHED) UIN01 EVANSTON MS - WEIGHT ROOM UIN01 EVANSTON MS - MODULAR UIN01 EVANSTON MS - PORTABLE UIN01 HORIZON HS (DISPOSED) UIN04 ORIGINAL FORT BRIDGER SCHOOL (3-6) MAIN BLDG HISTORICAL SOCIETY (DISPOSED) WES07 UPTON FOOTBALL/TRACK FIELD CROWS NEST (DEMOLISHED)

DISPOSED

896

DISPOSED DISPOSED

1,468 979

167,144

DEMOLISHED DEMOLISHED

39,000 6,875

DEMOLISHED DEMOLISHED DEMOLISHED DISPOSED DISPOSED

4,315 1,000 14,885 3,400 7,000

DISPOSED DEMOLISHED

1,800 192

Page 40 of 91

School Facilities Division New Schools Opened July 1, 2016 Through June 30, 2017

DISTRICT ALBANY #1 CAMPBELL #1 CARBON #1 CROOK #1 FREMONT #14 FREMONT #24 FREMONT #25 GOSHEN #1 LARAMIE #1 NATRONA #1 NATRONA #1 NATRONA #1 NATRONA #1 PARK #1 SHERIDAN #1

BUILDING DESCRIPTION LARAMIE HS STOCKTRAIL ES RAWLINS HS SUNDANCE ES WYOMING INDIAN ES SHOSHONI ES/MS/HS WILLOW CREEK ES LINGLE - FT. LARAMIE ES MEADOWLARK ES KELLY WALSH HS JOURNEY ES ROOSEVELT HS PATHAWAYS INNOVATION CENTER POWELL MS TONGUE RIVER ES

Page 41 of 91

Page 42 of 91

Page 43 of 91

Page 44 of 91

Capacity, Condition and Component Based on the approved capacity methodology of the School Facilities Commission, the 2017 Prioritized Capacity List shows high, medium and low capacity percentages in the state for specific district configurations. Utilization rates for elementary home rooms are at 100%. Middle / high school rates are at 85% per W.S. 21-15-117. In 2016, the School Facilities Division hired a consultant to perform a statewide district facilities condition assessment and measure district locations/rooms in all educational, transportation and administrative buildings. From this information a facility condition index (FCI) composed of two lists (education & ancillary) has been created. Component requests went through a School Facilities Commission approved methodology. A committee of twelve (12) members made up of district personnel reviewed the scope of work and budget for each component project request and compile a prioritized, statewide component list.

Page 45 of 91

Page 46 of 91

School Facilities Division 2017 Education Facilities Condition Index District SHERIDAN 2 WASHAKIE 2 LARAMIE 1 NIOBRARA 1 SHERIDAN 2 LARAMIE 1 LARAMIE 1 LARAMIE 1 FREMONT 25 LINCOLN 1 LARAMIE 1 LARAMIE 1 CAMPBELL 1 LARAMIE 1 LARAMIE 1 LARAMIE 1 ALBANY 1 LARAMIE 1 CAMPBELL 1 LARAMIE 1 FREMONT 1 WESTON 1 LARAMIE 2 CAMPBELL 1 SWEETWATER 1 PARK 6 CAMPBELL 1 CAMPBELL 1 LARAMIE 1 ALBANY 1 PARK 6 LARAMIE 1 CARBON 2 PARK 16 SWEETWATER 2 GOSHEN 1 GOSHEN 1 BIG HORN 3 PLATTE 1 PLATTE 1 LARAMIE 1 CONVERSE 1 ALBANY 1 NATRONA 1 LARAMIE 1 LARAMIE 1 SWEETWATER 1 CAMPBELL 1 GOSHEN 1 LINCOLN 1 SHERIDAN 2 SWEETWATER 1 CAMPBELL 1 WESTON 1 WESTON 7 WESTON 1 CAMPBELL 1 BIG HORN 2 TETON 1 FREMONT 25 PLATTE 1 SUBLETTE 1 LARAMIE 1 CAMPBELL 1 SWEETWATER 1 FREMONT 25 CARBON 1 PLATTE 1 PARK 6 WESTON 7 LARAMIE 1

Building Name FORT MACKENZIE HS / THE WRIGHT PLACE MS TEN SLEEP ES/MS/HS - MASONIC TEMPLE LODGE BUILDING CLAWSON ES LANCE CREEK ES SAGEBRUSH ES HOBBS ES FAIRVIEW ES BAIN ES FRONTIER ACADEMY (TAC) KEMMERER ES LEBHART ES HEBARD ES TWIN SPRUCE JHS - PARISH HALL DEMING ES DILDINE ES BUFFALO RIDGE ES SLADE ES CAREY JHS COTTONWOOD ES JESSUP ES JEFFERY CITY ES NEWCASTLE HS - FITNESS CENTER ALBIN ES - SIXTIES ADDITION LITTLE POWDER ES/MS LINCOLN ES CODY MS - OBSERVATORY CAMPBELL COUNTY HS CAMPBELL COUNTY HS - "G" BLDG HENDERSON ES BEITEL ES CODY HS - STOCK ACTIVITIES CENTER ARP ES HEM JHS/HS MEETEETSE ES/MS/HS - VOCATIONAL BLDG LINCOLN MS SOUTHEAST ES/MS/HS TORRINGTON HS - TECHNOLOGY BLDG GREYBULL HS - QUIGG BLDG WEST ES WHEATLAND HS - WEIGHT ROOM MILLER ES SHAWNEE ES LARAMIE JHS GRANT ES COLE ES JOHNSON JHS ROCK SPRINGS HS MEADOWLARK ES SOUTHEAST ES/MS/HS - INDUSTRIAL ARTS NEW FRONTIER HS SHERIDAN JHS - EARLY BLDG DESERT VIEW ES TWIN SPRUCE JHS NEWCASTLE HS UPTON HS - RAINBOLT BLDG NEWCASTLE HS - VO TECH BLDG CONESTOGA ES LOVELL ES MORAN ES ASHGROVE ES CHUGWATER ES PINEDALE HS - ART/AG BLDG ALTA VISTA ES SUNFLOWER ES OVERLAND ES RENDEZVOUS ES RAWLINS ES K - 1 CAMPUS GLENDO ES CODY HS - AUTO SHOP/STORAGE UPTON ES/MS WILLADSEN ES

2016 FCI 0.7125 0.5191 0.5019 0.4843 0.4790 0.4707 0.4567 0.4439 0.4406 0.4229 0.4214 0.4160 0.4137 0.4043 0.4032 0.3930 0.3842 0.3781 0.3778 0.3743 0.3676 0.3546 0.3487 0.3478 0.3450 0.3438 0.3336 0.3320 0.3311 0.3265 0.3260 0.3228 0.3168 0.3055 0.3034 0.3003 0.2992 0.2932 0.2931 0.2893 0.2878 0.2876 0.2865 0.2830 0.2781 0.2777 0.2705 0.2687 0.2687 0.2682 0.2680 0.2662 0.2660 0.2650 0.2622 0.2616 0.2611 0.2592 0.2575 0.2556 0.2537 0.2536 0.2534 0.2527 0.2519 0.2473 0.2461 0.2441 0.2437 0.2437 0.2436

2012 FCI* 0.5987 N/A 0.2033 0.2733 0.3191 0.3406 0.3248 0.3156 0.4657 0.2962 0.2767 0.3458 0.3716 0.3817 0.2822 0.2488 0.4161 0.3368 0.2884 0.3693 0.4242 0.0883 0.3190 0.3340 0.3272 0.0783 0.3114 0.2132 0.2013 0.3087 0.0834 0.2799 0.2671 N/A 0.2786 0.2201 0.1982 0.1460 0.2084 0.2494 0.2877 0.1835 0.3179 0.1837 0.2485 0.1943 0.2262 0.2675 0.1428 0.1755 0.1780 0.2047 0.3135 0.1570 0.2169 0.2364 0.2957 0.1457 0.2616 0.1877 0.1661 0.2411 0.1044 0.2348 0.2546 0.1997 0.2277 0.1757 0.0606 0.1963 0.2229

Year Built 1953 1927 1939 1984 1986 1959 1956 1961 1949 1972 1959 1945 1965 1945 1956 1959 1955 1953 1979 1961 1958 1990 1960 1976 1950 1996 1972 1977 1950 1952 1966 1961 1978 1937 1975 1980 1964 1965 1977 1959 1965 1986 1978 1950 1949 1983 1971 1975 1984 1980 1977 1979 1925 2002 1975 1978 1982 1942 1960 1953 1949 1980 1987 1983 1976 1959 1982 1981 1976 1992 1959

Bldg. Sq. Ft 39,714 3,630 2,774 1,460 54,120 41,708 26,028 33,053 64,825 39,249 25,807 32,161 10,554 18,099 50,339 32,845 42,080 178,394 58,206 31,710 8,447 5,078 19,177 14,229 44,425 874 301,662 28,320 36,918 32,242 15,399 31,239 79,240 9,450 145,190 46,457 3,154 10,535 60,208 3,429 12,777 1,440 105,911 29,296 32,558 133,620 317,169 37,728 9,332 3,536 66,483 49,303 181,869 76,982 3,042 12,656 56,149 57,936 8,765 34,630 22,863 9,748 54,490 56,743 48,625 82,191 36,879 15,702 13,275 55,363 4,764

Page 47 of 91

Page 48 of 91

Page 49 of 91

Page 50 of 91

Page 51 of 91

Page 52 of 91

Page 53 of 91

Page 54 of 91

Page 55 of 91

District Component Request 2017 District Building Other Request Name Documents attached to AiM Work Order

Instructions

Purpose

Exclusions

Priority 1 2 3 4 5 6 7 8 9 10

Select District SELECT ONE

FCI Score

Request No.

0

Select # Major Maintenance Available Balance Unobligated balance Anticipated July 1 MM payment $0.00 Minus prioritized MM projects Minus MM reserve Available Balance: $0

Scope and cost estimate prepared by a professional service provider SFD Component Budget Worksheet Photos (recommend up to 5 that show nature of request)

1) District fills out white sections 2) SFD / prioritization committee score requests The purpose of component requests is to supplement major maintenance when district funds are inadequate to remedy low scoring systems Requests must qualify under the Wyoming state statute definition for major building and facility repair and replacement: " the repair or replacement of complete or major portions of school building and facility systems at irregular intervals which is required to continue the use of the building or facility at its original capacity for its original intended use " What doesn't qualify: 1) adding new square footage, 2) "repairing or replacing" a component that does not exist, 3) multi-system renovations that do not have direct correlation to the main system request, 4) requests for security elements 1 - 20 (listed below)

Category Locking Systems / Hardware Locking Systems / Hardware Communication Systems Access Control Access Control Access Control Communication Systems Locking Systems / Hardware Video Surveillance Video Surveillance

Security Element D7103 Exterior Door Locks D7101 Classroom Door Locks D7301 Two-way Communications D7201 Point of Entry D7204 Visitor Management Systems D7202 Secured Vestibule D7302 Mass Notification Systems D7105 Door Keying Systems D7501 Main entry D7505 Video Surveillance Recording

Priority 11 12 13 14 15 16 17 18 19 20

Category Access Control Site and Perimeter Site and Perimeter Video Surveillance Video Surveillance Site and Perimeter Egress and Refuge Egress and Refuge Locking Systems / Hardware Site and Perimeter

Security Element D7203 Main Entry Control Systems D7410 Site Lighting D7401 Site Landscaping D7503 Key Interior Areas D7502 Key Exterior Areas D7402 Site Vehicle Barricades D7701 Classroom Door Construction D7702 Lockdown of Special Areas D7102 Classroom Door Inside Locks D7408 Security Signage

Main System Request

Building Class

Project Purpose

AiM Work Order #

System Description

AiM Component Score

Project Cost

District MM Portion

Totals

$0

$0

AiM Component Score

Project Cost

District MM Portion

Totals

$0

$0

Requested Component Amount $0 $0

Additional Affected Systems

Building Class

Project Purpose

AiM Work Order #

System Description

Total Component Request

$0

Percent of MM Payment

Requested Component Amount $0 $0 $0 $0 $0 $0

0%

Additional Scope Details

How do additional affected systems relate to main system request? Potential effects on school operations, including possible closure of building? 2016 component list ranking? Project Manager Select PM

Evaluator No. Select #

Prioritization Committee Scoring: Criteria Scope, Estimate & Budget Sheet Main System Score MM Payment % of Request Previous Component Ranking Building FCI Overall SFD Responsibility

Scorer SFD SFD SFD SFD SFD

Criteria Scorer Health & Safety Committee Additional Affected Systems Committee Urgency Committee Committee MM Funds Prioritization Overall Committee Responsibility Overall Totals

Weight 10% 10% 10% 5% 5% 40%

Scoring

Weight 25% 5% 10% 20% 60%

Scoring

100%

Rating

Score

Score:

0

Rating

Score

Score:

0

Overall Score:

0

Page 56 of 91

Page 57 of 91

District Component Project Prioritized Requests 2019-20 Biennial Budget Ranking

District

1 2 3 4 5 6 7 8 9 10

Fremont #6 Platte #1 Fremont #25 Hot Springs #1 Fremont #25 Fremont #25 Sublette #9 Sheridan #2 Fremont #25 Big Horn #2

11

Laramie #1

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Laramie #2 Fremont #25 Laramie #2 Laramie #1 Platte #1 Laramie #2 Laramie #2 Big Horn #3 Fremont #25 Sweetwater #2 Laramie #2 Laramie #2 Laramie #1 Laramie #2 Laramie #2 Uinta #6 Sweetwater #2 Sweetwater #2 Platte #1

31 32 33 34 35 36 37

Big Horn #2 Sweetwater #2 Campbell #1 Big Horn #2 Natrona #1 Natrona #1 Natrona #1

Project Name Wind River JHS/HS Roof Replacement West ES Roof and Heater Repair Riverton MS Roof Replacement Thermopolis MS Roof Replacement Riverton HS Electrical Distribution Upgrade Riverton HS Career Center - Sanitary Lines Replacement Big Piney MS Roof & Cooling Tower Sheridan HS Science Room Plumbing Riverton HS Air Handling Unit Replacement Lovell HS Roof Replacement 1

2

Bain ES ALC DDC Controls Upgrade 3

Albin ES HVAC Controls Upgrade Riverton HS Skylight Re-Installation Albin ES - 60's Addition HVAC Controls Upgrade Cole ES ALC DDC Controls Upgrade Libbey ES Fittings, Sanitary Waste, Bathroom Fixtures Burns JHS/HS HVAC Controls Upgrade Pine Bluffs JHS/HS Voc ED HVAC Controls Upgrade Greybull Bus Barn Heat Install Riverton HS Parking Lot Rehabilitation Lincoln MS Elevator Upgrade Burns JHS/HS - Voc ED HVAC Controls Upgrade Transportation Facility HVAC Controls Upgrade Freedom ES ALC DDC Controls Upgrade Admin HVAC Controls Upgrade Pine Bluffs JHS/HS HVAC Controls Upgrade Lyman HS Boiler Replacement Lincoln MS Exterior Door & Window Replacement Lincoln MS Interior Finishes Wheatland Bus Garage Parking Lot and Electrical Outlets Lovell ES Intercom, FM4 and Bell System Replacement Lincoln MS Casework Replacement Wagonwheel ES Parking Lot Lovell MS Intercom, FM and Bell System Replacement Manor Heights ES Elevator Replacement Manor Heights ES Swamp Cooler Replacement Midwest School Roof Replacement

Requested Amount Cumulative Amount $1,135,889 $663,825 $2,772,992 $859,478 $701,971 $699,566 $753,346 $565,925 $719,031 $648,388

$1,135,889 $1,799,714 $4,572,706 $5,432,184 $6,134,155 $6,833,721 $7,587,067 $8,152,992 $8,872,023 $9,520,411

$66,492

$9,586,903

$99,225 $477,584 $68,152 $87,205 $116,408 $227,950 $53,635 $203,763 $1,559,205 $81,100 $24,136 $12,068 $214,942 $18,772 $122,159 $260,057 $643,100 $947,800 $250,107

$9,686,128 $10,163,712 $10,231,864 $10,319,069 $10,435,477 $10,663,427 $10,717,062 $10,920,825 $12,480,030 $12,561,130 $12,585,266 $12,597,334 $12,812,276 $12,831,048 $12,953,207 $13,213,264 $13,856,364 $14,804,164 $15,054,271

$143,817 $449,800 $1,017,078 $106,112 $901,208 $1,265,440 $1,075,624

$15,198,088 $15,647,888 $16,664,966 $16,771,078 $17,672,286 $18,937,726 $20,013,350

1 - ALC (automated logic controls) 2 - DDC (direct digital controls) 3 - HVAC (heating, ventilation and air conditioning) 4 - FM (personal frequency modulation systems use radio waves to send speech to students)

Page 58 of 91

Page 59 of 91

Page 60 of 91

Project Cost Budgeting Preliminary planning at both the school district and state levels; and subsequently within the state budget process involves thorough and timely efforts. Most project budgets are developed years in advance of the actual bidding and construction of a project. Step One: Calculating Allowable Square Footage Needed The first variable that must be established when calculating a budget for a new school is the intended design capacity that the new school should accommodate. The design capacity (number of students) is calculated by analysis of the particular district’s student population history and projecting the number of students that the district may have five years after the projected construction completion date. Wyoming uses a cohort projection methodology as approved by the School Facilities Commission (SFC). The design capacity is a primary variable used in the allowable square footage calculator formula, which yields the total allowable square footage that the school building may contain. Step Two: Establishing the Projected Direct Construction Cost per Square Foot Budget The square foot cost has been developed by extrapolating actual construction costs of past projects from a statewide capital construction database maintained by the State Construction Department (SCD). The base cost per square foot used in preparing the capital construction budget varies between elementary schools, middle schools and high schools. Budget adjustments may also be made for exceptionally small or large schools; and geographic and remote locations. In the case of a Construction Manager at Risk (CMAR) delivery method, the construction budget includes the preconstruction service fees, and the construction management fees. Step Three: Calculating Land, Planning, Design and Construction Costs Budgets are prepared in a collaborative effort between the SCD, school districts and consultants. The team first outlines the summary and schedule to assist in developing costs associated with the project. The team then goes through each of the phases (Land, Planning, Design, and Construction) and identifies costs associated with each phase. Land budgets are prepared when a need for a new site is identified through the project planning process, subsequently in accordance with statute, a district can then “fix” the site. During the fixing of the site process, a district shall obtain three appraisals to determine the value of the land as required by SFC rule. If this information is obtained prior to the budget session then an appraised value will be used to construct the budget request. If the final appraisal is not available then the best known value of the land is used. This is sometimes provided by the school district in the form of a “market analysis” done by a realtor that the district has selected. Project planning budgets are prepared by identifying which planning activities are needed for a particular project such as educational programming, feasibility study, most cost effective remedy (MCER) analysis, capacity analysis or condition. Each project planning activity has a cost associated with it and the sum of the numbers generates the planning budget.

Page 61 of 91

To calculate the construction budget, a methodology adopted by the SFC is utilized. That methodology takes into account the student design capacity as determined from the enrollment projection, grade configuration, building utilization rate, and square footage allocations to derive the maximum allowable square footage of the building. Next, the direct cost of construction per square foot is established. For any particular project, the base cost of construction per square foot is inflated by a factor to account for anticipated inflation. This has typically been 4% annually or .33% per month as advised by the State of Wyoming Department of Economic Analysis. Estimated bid dates are established for projects after consultation with the district. The time needed for design, construction, and the project completion date is identified. The SCD also uses this information to develop the “Project and Timeline Forecast,” a report of all projects to estimate schedules and long term quarterly cash expenditures. The maximum allowable square footage is multiplied by the projected construction cost per square foot, which provides the project direct construction costs. In addition to the construction costs, there are other associated costs that make up the project budget. Many of these costs, with the exception of the project planning, are budgeted as a percentage of the direct construction costs that are anticipated to be incurred. Examples of these costs are architectural and engineering fees; owner’s overhead; site and topographic surveys; environmental assessments; geotechnical investigations; special inspections; furniture, fixtures and equipment; commissioning agents; owner’s representatives; Tribal Employment Rights Office (TERO) fees, if applicable; and a project contingency. A percentage can be used to budget for these costs by tracking the historical cost of these expenses related to the direct construction cost of similar past projects. Often a school district may choose to demolish an existing school prior to building a new school. When this scenario is known, the cost of the demolition is identified in the construction budget. Demolition and asbestos abatement costs are budgeted as a cost per square foot of the building area to be demolished. Sometimes there are “other” expenses incurred which do not reasonably correlate as a percentage of the total direct construction cost, or fall outside the normal cost of a project. Examples of these costs include, but are not limited to, offsite infrastructure, onsite waste water treatment plant, etc. These costs are estimated using the professional judgment of consultants and an understanding of the total scope of the project. In some instances, planning and design consultants may be utilized to assess optional remedies, identify the most cost effective remedy, and provide cost data. In other instances, the project may include the construction of new facilities as well as renovation of existing facilities. Establishing a project budget is more complex in this case as it may require the use of a combination of historic square foot cost data and unit cost estimates. In both instances, a consultant may provide cost estimates which may be used as the project budget (See Attached Example Budget Worksheet). Project budgeting is by no means an exact science due to the numerous variables that affect the demand and cost of labor and materials and schedule. (See Attached Capital Construction Square Foot Cost Summary).

Page 62 of 91

Capital Project - SFD Budget Worksheet Example School District Example Project - New Elementary School This project cost budgeting sheet is for planning purposes only and does not imply a guarantee or entitlement to funding. Project Scope

Project Information Planned Work Order Example Work Order 1234 Or Index Rank & Date SFD Project Number Example 101 Commission Approved SFC Approved Commission Approval Date 3/15/2015 Construction Region North East Design Capacity 407 Configuration Elementary Target Bid Season Spring 2017

Dates

SFC Allowable

54,498

SF

Original Budget

Commission Approved Additional

2,500

SF

Revision 1

Total Allowable New Construction Renovation Total

56,998 56,998 0 56,998

SF SF SF SF

57,212

SF

Revision 2 Revision 3 Revision 4 Revision 5 Revision 6 Revision 7

Demolition

1. Land Acquisition Planning Services 1.1. 1.2.

Purchase of Land (All costs outlined on Settlement Statement - appraisal land purchase closing costs Check here if land acquisition is complete or is not required for this project

realtor fees title etc.)

2. Planning 2.1. 2.2.

Owner's Overhead (advertising

Quantity Unit 1 LS $ 1 LS $

Unit Budget 25,000 $ 500,000 $

Budget Total 25,000 $ 500,000 $ Total Land $

Subtotal 25,000 500,000 525,000

Quantity Unit

Unit Budget

Budget Total

Subtotal

land surveys geotechnical investigation special studies phase one environmental assessment traffic studies hazardous material identification etc.)

Planning Services (Capacity Study and or Most Cost Effective Remedy - Perform building condition evaluations

perform activity relationship studies outline room design schedules conduct a charrette develop educational programming and specifications compile all data into a final program plan for the project)

1

LS

$

5,000

$

5,000

$

5,000

1

LS

$

50,000

$

50,000

$

50,000

Total Planning

$

55,000

Check here if planning is complete or is not required for this project 3. Design 3.1.

3.2. 3.3. 3.4. 3.5. 3.6. 3.7. 3.8. 3.9

Owner's Overhead (advertising (Percentage of Total Construcion)

Planning Services (Capacity Study and or Most Cost Effective Remedy - Perform building condition evaluations

perform activity relationship studies outline room design schedules conduct a charrette develop educational programming and specifications compile all data into a final program plan for the project)

4.8)

(insert description here if used) Other Services Check here if design is complete or is not required for this project

City Plan Reviews, Utilities, Tap Fees, Permits, Gas and Electric - (Percentage of 4.2 (insert description here Hazardous Materials Abatement Construction Contract (Anticipated Hard Bid)

Demolition New Construction Renovation Off Site Infrastructure Size Adjustment

(insert description here if used) (insert description here if used) Install road water sewer and power to new site

Commission exception to additional SF for production kitchen($257.14 x 2 500 sf) = Other Construction Services (insert description here if used) Other Construction Services (insert description here if used) Other Construction Services (insert description here if used) Other Construction Services (insert description here if used) Other Construction Services Furniture, Fixtures, and Equipment Contract

FF&E - Rules and Regulations Chapter 3 paragraph (t) - New School - (Percentage of 4.3.2 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10) FF&E - Rules and Regulations Chapter 3 paragraph (t) - Replacement School - (Percentage of 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3 8 Construction Contingency

4.3.9 4.3.10)

4.8)

(insert description here if used) Swing Space (insert description here if used) Other Services Check here if construction is complete or is not required for this project

Funding Summary Example Project

Schedule Assumptions: Land Investigation & Purchase: July 2016 - December 31, 2016 (6 Months) Planning Procurement: January 2017 - Feburary 2017 (2 Months) Planning: March 2017 - June 2017 (4 Months) Design Procurement: July 2017 - September 2017 (3 Months) Design: October 2017 - December 2018 (14 Months) Bidding: January 2019 - February 2019 (2 Months) Construction: March 2019 - August 2020 (17 Months) Note: Existing school will be demolished. New land is needed as existing site does not meet guidelines. Off Site Infrastructure needed to get infrastructure to new piece of property.

$

1

LS

$

% % % % % % LS

$ $ $ $ $ $ $

Type (from above) 1. Land Acquisition 1. Land Acquisition 1. Land Acquisition 2. Planning 2. Planning 2. Planning 3. Design 3. Design 3. Design 4. Construction 4. Construction 4. Construction

378,530

1,415,775 85,818 160,875 130,955 144,926 185,554 -

Budget Total $

$ $ $ $ $ $ $ $ $ $

12 257.14 750,000 25 -

0.0% 4.2%

% %

$ $

647,070

5% 10% 1 1

% % LS LS

$ $ $ $

802,675 154,475 -

$ $ $ $ $ $ $ $

1,415,775 85,818 160,875 130,955 144,926 185,554 Total Design

-

378,530

$

1,415,775 85,818 160,875 130,955 144,926 185,554 2,502,432

Budget Total 371,107 $ 858,180 $ $ $ 686,544 $ 14,656,403 $ $ 750,000 $ $ 25 $ $ $ $ $ $ $ 647,070 $ $ 802,675 $ 154,475 $ $ $ $ Total Construction $

Subtotal 371,107 858,180 16,092,972

Amount $ $ $ $ $ $ $ $ $ $ $ $ $

-

Subtotal $

$ $ $ $ $ $ $ $

Previous Appropriation Source

378,530

Unit Budget 371,107 $ 15 $

SF SF LS LS SF LS LS LS LS LS

57,212 56,998 1 1 0 1 1 1 1 1

(insert description here if used)

Project Budget Special Notes

%

Quantity Unit 2% % $ 57,212 SF $

4.3 4.5 4.6 4.7 4.8)

if used)

New Construction - (Percentage of 4.3.2 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.8 4.3.9 4.3.10 4.5 Renovation - (Percentage of 4.2 4.3.1 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.7 4.8)

2%

8% 10% 0.85% 0.85% 0.85% 1.00% 1

4. Construction 4.1. 4.2. 4.3. 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.5 4.5.1 4.5.2 4.6 4.6.1 4.6.2 4.7. 4.8.

Unit Budget

Quantity Unit land surveys geotechnical investigation special studies phase one environmental assessment traffic studies hazardous material identification etc.) -

A&E Design and Construction Administration - (Percentage of 4.3 4.5 4.6 4.7 4.8) Abatement Design, Testing and Verification, Oversight - (Percentage of 4.2) Owner's Representative - (Percentage of Total Construcion) Commissioning Agent - (Percentage of 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 Special Inspections and Materials Testing - (Percentage of 4.3 4.6 4.8) Design Contingency - (Percentage of 4.2 4.3 4.5 4.6 4.7 4.8)

6/21/2015

647,070

957,150

18,926,479

Budget

Additional Funds

(from above)

Needed

$

525,000

$

525,000

$

55,000

$

55,000

$

2,502,432

$

2,502,432

$

18,926,479

$

18,926,479

$

22,008,911

$

22,008,911

Budget Total 189,265 $

Subtotal 189,265

SFD INTERNAL USE ONLY 1.Series 900 Funding Requirements Quantity Unit 21-15-118 Building & Facility Construction & Renovation Projects (B) - Conduct a value engineering analysis of the project 1.1. 1% % $ 21-15-123 State Construction Department; Creation; Control; Director; Duties & Authority (J) - Require a contract compliance audit by independent auditing 1.2. 0.13% % $ expertise of project budgets and expenditures prior to completing the project or pro ects.

Check here if Series 900 Funding Requirements are complete or is not required for this project

Unit Budget 189,264.79 $ 24,604.42

$

24,604

Total 900 Funding Request $

$

24,604

213,869

Page 63 of 91

Page 64 of 91

WYOMING STATE CONSTRUCTION DEPARTMENT

School Facilities Commission

2019-20 Biennial Budget Recommendation

September 1, 2017

Page 65 of 91

SFD Capital Projects by  Priority Totals Priority 01‐OPERATIONS 02‐ENGINEERING & TECHNICAL 03‐MAJOR MAINTENANCE 04‐CHARTER SCHOOL LEASES 05 ‐LAND LEASES 05.1 ‐MODULAR LEASE 06‐MODULAR LEASE DEMOLITION 07‐EMERGENCY 08‐CAPACITY 09‐CONDITION 10‐CONDITION/COMMISSION DIRECTED COMPONENT FUNDING 11‐DISTRICT COMPONENT REQUEST 12‐PLANNING 13‐SECURITY 14‐DEMOLITION 15‐TRACKS 16 ‐ LAND OPPORTUNITY 17 ‐ UNANTICIPATED

9/1/2017 12:22:47 PM Priority Total $6,754,541.00 $2,050,000.00 $141,315,000.00 $1,002,004.00 $4,600.00 $157,470.00 $56,100.00 $5,000,000.00 $0.00 $1,605,505.00 $26,481,780.00 $9,957,893.00 $300,000.00 $0.00 $3,136,048.00 $194,979.00 $750,000.00 $2,503,938.00 $201,269,858.00

Page 66 of 91

9/1/2017

SFD Capital Projects by Priority

3:05:01 PM

Priority 01‐OPERATIONS ID #

Sub‐Priority

Needs Index

Condition/Capacity

Project Description

0184

01

SFC

NA

NA

SALARIES CLASSIFIED

‐ OBJECT ‐ 0103 ‐ Standard Positions

0185

02

SFC

NA

NA

SALARIES OTHER

‐ Object ‐ 0104 ‐ AWEC Positions

0186

03

SFC

NA

NA

EMPLOYER PAID BENEFITS

‐ OBJECT ‐ 0105 ‐ Employee Burdens

0187

04

SFC

NA

NA

EQUIPMENT REPAIR &  MAINTENANCE

‐ OBJECT ‐ 0202 ‐ Vehical Repairs

$5,000

0188

05

SFC

NA

NA

UTILITIES

‐ OBJECT ‐ 0203 ‐ Water, Sewer & Garbage

$4,000

0189

06

SFC

NA

NA

COMMUNICATION

‐ OBJECT ‐ 0204 ‐ Mail

$20,000

0190

07

SFC

NA

NA

DUES ‐ LICENSES ‐  REGISTRATIONS

‐ OBJECT ‐ 0207 ‐ Subscriptions / Memberships /  Training

$40,000

0231

08

SFC

NA

NA

ADVERTISING PROMOTION

‐ Object ‐ 0208 ‐ Legal Advertising

$18,000

0191

09

SFC

NA

NA

MISCELLANEOUS

‐ OBJECT ‐ 0210 ‐ Website / Marketing

$30,000

District

Project Narrative

Budget Amount

AiM Property

$2,793,156

$598,876

$1,340,596

Page 67 of 91

0192

10

SFC

NA

NA

TRAVEL IN STATE

‐ Object ‐ 0221 ‐ Project Management Travel ‐ Legislative Committee Meetings

$157,509

0193

11

SFC

NA

NA

TRAVEL OUT OF STATE

‐ Object ‐ 0222 ‐ Continuing Education

0195

12

SFC

NA

NA

PERMANENTLY ASSIGNED  VEHICLES

‐ Object ‐ 0223 ‐ Agency Vehicles

0234

13

SFC

NA

NA

IN‐STATE BD/COMM  TRAVEL REIMBURSEMENTS

‐ Object ‐ 0228 ‐ SFC Travel

$50,000

0196

14

SFC

NA

NA

SUPPLIES

‐ Object ‐ 0230 ‐ Office Supplies

$60,000

0197

15

SFC

NA

NA

OFFICE SUPPLIES PRINTING

‐ Object ‐ 0231 ‐ Professional Printing

$30,000

0232

16

SFC

NA

NA

MOTOR VEHICLE/AIRPLANE

‐ Object ‐ 0233 ‐ Airplane

0199

17

SFC

NA

NA

OTHER REPAIRS  MAINTENANCE SUPPLIES

‐ Object ‐ 0239 ‐ Repair and Maintenance Parts  and Supplies

$0

0198

18

SFC

NA

NA

INTANGIBLE ASSETS

‐ Object ‐ 0240 ‐ Software/Uber/GoToM/Docus

$5,000

0201

19

SFC

NA

NA

OFFICE EQUIPMENT AND  FURNISHINGS

‐ Object ‐241 ‐ Department FF&E

$2,500

0202

20

SFC

NA

NA

DOCUMENT REPRODUCT  OTHER EQUIPMENT

‐ Object ‐ 0242 ‐ Computers

$0

0254

21

SFC

NA

NA

REAL PROPERTY RENTAL

‐ OBJECT ‐ 0251 ‐ Office Lease

$0

$38,000

$193,000

$5,200

Page 68 of 91

0203

22

SFC

NA

NA

EQUIPMENT RENTAL

‐ Object 0252 ‐ Leased Printers

0233

23

SFC

NA

NA

AIM SOFTWARE

‐ Object ‐ 0292 ‐ AiM

$266,500

0206

24

SFC

NA

NA

COST ALLOCATION

‐ Object ‐ 0301 ‐ A&I Cost Allocation

$665,206

0207

25

SFC

NA

NA

CENTRAL SERVER DATA  SERVER

‐Object ‐ 0410 ‐ ETS Cost Allocation

$5,811

0208

26

SFC

NA

NA

TELECOMMUNICATIONS

‐ Object ‐ 0420 ‐ ETS Cost Allocation ‐ Agency Phones

$41,487

0209

27

SFC

NA

NA

SPACE RENTAL

‐ Object ‐ 0520 ‐ A&I Leasing Division  ‐ Evanston $8,700 ‐ Casper Offices ($10,636.92)  ‐ Terminate Casper Lease

0265

29

SFC

PROFESSIONAL FEES

‐ Professional Fees ‐ Consultants 01‐OPERATIONS SUB‐TOTAL

$26,000

$8,700

$350,000

$6,754,541

Priority 02‐ENGINEERING & TECHNICAL ID #

Sub‐Priority

0168

01

0211

02

Project Narrative

Needs Index

Condition/Capacity

Project Description

SFC

NA

NA

PROFESSIONAL FEES

‐ Object ‐ 0901 ‐ Value Engineering

SFC

NA

NA

AUDITING

‐ Object ‐ 0901 ‐ Project Auditing

District

Budget Amount

AiM Property

$453,131

$58,907 Page 69 of 91

0210

03

SFC

NA

NA

CONSULTING SERVICES

‐ Object 0901 ‐ Consultants For Agency

0230

04

SFC

NA

NA

MAINTENANCE TRAINING

‐ Object ‐ 0901 ‐ Facilities training for state and  district employees

$95,000

0235

05

SFC

NA

NA

HUMAN RESOURCES ‐ A&I

‐ Object ‐ 0901 ‐ HR MOU

$20,000

02‐ENGINEERING & TECHNICAL SUB‐TOTAL

$1,422,962

$2,050,000

Priority 03‐MAJOR MAINTENANCE ID #

Sub‐Priority

0171

01

0212

02

District

Project Description

Project Narrative

Needs Index

Condition/Capacity

SFC

NA

NA

MAJOR MAINTENANCE

Preliminary Number  Based On Current RS Means Data

SFC

NA

NA

COMPUTERIZED  MAINTENANCE  MANAGEMENT SOFTWARE  (CMMS)

‐ Object ‐ 0292 ‐ Asset Preservation Software ‐ Track Routine Maintenance ‐ Track Major Maintenance ‐ Forcast Component Liabilities ‐ Reporting To Legislature

Budget Amount

AiM Property

$140,000,000

$1,315,000

03‐MAJOR MAINTENANCE SUB‐TOTAL

$141,315,000

Project Narrative

Budget Amount

Priority 04‐CHARTER SCHOOL LEASES ID #

Sub‐Priority

District

Needs Index

Condition/Capacity

Project Description

AiM Property

Page 70 of 91

0172

01

LARAMIE 1

NA

NA

PODER ACADEMY K‐5

Charter School Lease: 21‐3‐ 110(a)(x)(A) ‐ Existing Contract Expires July  31, 2019 = $346,666.45 ‐August 1, 2019 through June 30,  2020 = $485,932.70

$832,599

0173

01

ALBANY 1

NA

NA

MONTESSORI CHARTER  SCHOOL K‐6

Charter School Lease: 21‐3‐ 110(a)(x)(A) July 1, 2018 – June 30, 2019    Year 3 of contract ($79,850 x  1.04 = $83,041) July 1, 2019 – June 30, 2020    Year 4 of contract ($83,041 x  1.04 = $86,363) Total biennium request $169,405

$169,405

04‐CHARTER SCHOOL LEASES SUB‐TOTAL

$1,002,004

Priority 05 ‐LAND LEASES ID #

Sub‐Priority

0148

01

District

LARAMIE 1

Needs Index

Condition/Capacity

NA

NA

Project Description

PRAIRIE WIND LAND LEASE

Project Narrative

Previous funding: lease  payments; reason: district  entered into a 50 year lease  from 2011 to 2061 with State  Lands & Investments to lease  land that Prairie Wind ES is built  on. The payment is $2,300 per  year. The total amount needed  to fulfill this lease is $98,900. 05 ‐LAND LEASES SUB‐TOTAL

Budget Amount

AiM Property

$4,600

$4,600

Page 71 of 91

Priority 05.1 ‐MODULAR LEASE ID #

Sub‐Priority

0164

01

0165

02

District

Project Description

Project Narrative

Budget Amount

Needs Index

Condition/Capacity

LARAMIE 1

NA

91.52%

SADDLE RIDGE ES ‐  MODULAR # 1

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity.  District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$29,900

LARAMIE 1

NA

91.52%

SADDLE RIDGE ES ‐  MODULAR # 2

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity.  District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$18,070

AiM Property

Page 72 of 91

0166

03

LARAMIE 1

NA

91.52%

SADDLE RIDGE ES ‐  MODULAR # 3

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity.  District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$18,070

0157

04

LARAMIE 1

NA

91.52%

ARP ES ‐ MODULAR # 1

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity. District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$14,950

Page 73 of 91

0158

05

LARAMIE 1

NA

91.52%

ARP ES ‐ MODULAR # 2

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity.  District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$29,900

0163

06

LARAMIE 1

NA

91.52%

HOBBS ES ‐ MODULAR # 1

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity.  District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$29,900

Page 74 of 91

0167

07

LARAMIE 1

NA

91.52%

SUNRISE ES ‐ MODULAR # 1

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  District has  expressed an interest in  retaining modular to address  individual and triad (boundary)  school capacity. District is  currently transitioning through a  boundary change and  reconfiguration plan. Funding  the leased modular will allow the  district to see the outcomes of  their plan prior to the removal of  the leased modular.

$16,680

05.1 ‐MODULAR LEASE SUB‐TOTAL

$157,470

Priority 06‐MODULAR LEASE DEMOLITION ID #

Sub‐Priority

0169

01

0170

02

District

Project Description

Project Narrative

Budget Amount

Needs Index

Condition/Capacity

BIG HORN 3

NA

82.19%

GREYBULL ES ‐ MODULAR #  1

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  Modular  being returned due to reduction  in capacity.

$28,050

BIG HORN 3

NA

82.19%

GREYBULL ES ‐ MODULAR #  2

Percentage based on 50 sf per  student in grades K‐1, 40 sf per  student grades 2‐6.  Modular  being returned due to reduction  in capacity.

$28,050

06‐MODULAR LEASE DEMOLITION SUB‐TOTAL

AiM Property

$56,100

Page 75 of 91

Priority 07‐EMERGENCY ID #

Sub‐Priority

0149

01

District

SFC

Needs Index

Condition/Capacity

NA

NA

Project Description

EMERGENCY

Project Narrative

Emergency funding account to  be used by the commission in  accordance with W.S. 21‐15‐120  and SFC rules / regulations  chapter 5 07‐EMERGENCY SUB‐TOTAL

Budget Amount

AiM Property

$5,000,000

$5,000,000

Priority 08‐CAPACITY ID #

Sub‐Priority

0236

01

District

SWEETWATER 1

Needs Index

Condition/Capacity

NA

101.61

Project Description

"PLANNING STUDY"  SATELLITE HIGH SCHOOL ‐  UPDATE MOST COST  EFFECTIVE REMEDY

Project Narrative

Budget Amount

Previous funding: planning &  design; reason: district has a  capacity issue in the 9‐12  configuration. The number of  seats needed based on October  3, 2016 enrollment is 22. Design  has been fully funded and is at  95%.  Planning study is underway  to explore medium term  strategies that are in the best  financial interest of the state and  are the most cost effective in  order to deliver quality  educational services. ‐ Budget for this project is  $46,334,298

$0

08‐CAPACITY SUB‐TOTAL

$0

AiM Property

Page 76 of 91

Priority 09‐CONDITION ID #

Sub‐Priority

0061

01

0087

02

District

Project Description

Project Narrative

Budget Amount

Needs Index

Condition/Capacity

SHERIDAN 2

1

0.7125

"DESIGN" ‐ JOHN SCHIFFER  ALTERNATIVE SCHOOL

Previous funding: planning;  reason: number 1 on the facility  condition index (FCI).  Commission approved as the  most cost effective remedy to  build a new facility on Sheridan  College campus and demo the  existing facility that has a FCI  score of 0.7125

NIOBRARA 1

4

 0.4843

LANCE CREEK ES MODULAR

Previous funding: none; reason:  number 4 on the facility  condition index (FCI) with a score  of 0.4843

$315,742

09‐CONDITION SUB‐TOTAL

$1,605,505

AiM Property

$1,289,763

Priority 10‐CONDITION/COMMISSION DIRECTED COMPONENT FUNDING ID #

Sub‐Priority

0082

01

District

WASHAKIE 2

Needs Index

Condition/Capacity

2

0.5191

Project Description

Project Narrative

MASONIC TEMPLE BUILDING No funding requested. This 

Budget Amount

AiM Property

$0

property (with the old Masonic  Lodge) was purchased to right  size the school site in  preparation for remedying the K‐ 12 Ten Sleep School.  When  design and construction funds  are realized in the future, the old  Masonic Lodge is to be  demolished. Page 77 of 91

0085

02

LARAMIE 1

3

0.5019

CLAWSON ES

Commission Directed  Component Funding  ‐FCI Score 0.5019 ‐Target FCI 0.1173

$383,006

0089

03

SHERIDAN 2

5

0.4790

SAGEBRUSH ES

Commission Directed  Component Funding ‐FCI Score 0.4790 ‐Target FCI 0.1311

$6,147,215

0091

04

LARAMIE 1

6

0.4707

HOBBS ES

Commission Directed  Component Funding ‐FCI Score 0.4707 ‐Target FCI 0.1243

$3,247,777

0093

05

LARAMIE 1

7

 0.4567

FAIRVIEW ES

District plans on closing this  school and moving student to  Lebhart Elementary ‐FCI Score 0.4567

0095

06

LARAMIE 1

8

 0.4439

BAIN ES

Commission Directed  Component Funding ‐FCI Score 0.4439 ‐Target FCI 0.0902

$0

$3,071,304

Page 78 of 91

0097

07

FREMONT 25

9

0.4406

FRONTIER ACADEMY (TAC)

District requested during its  2017 facility plan meeting with  SFD a planning study to analyze  its excess square footage  (250,073).  This building is an old  high school that was replaced  years ago and is used for various  entities such as: alternative  school, WDE, BOCES and houses  the facilities director's office.   There are 1,282 available seats  in the other education buildings  the district has.  The study is  being requested to be funded  from the planning funds already  approriated in House Enrolled  Act 124.  The intent is to explore  reducing "building and facility  needs in the most efficient and  cost effective manner in order to  deliver quality educational  services" (W.S. 21‐15‐116(a)(ii)). ‐2016 FCI Score 0.4406

$0

0099

08

LINCOLN 1

10

0.4229

KEMMERER ES

Commission Directed  Component Funding ‐FCI Score 0.4229 ‐ Target FCI 0.1384

$3,198,130

0101

09

LARAMIE 1

11

0.4214

LEBHART ES

Commission Directed  Component Funding ‐ FCI Score 0.4214 ‐ Target FCI 0.1440

$2,156,729

0103

10

LARAMIE 1

12

0.4160

 HEBARD ES

Commission Directed  Component Funding ‐FCI Score 0.4160 ‐Target FCI 0.1079

$2,744,321

Page 79 of 91

0107

11

LARAMIE 1

14

0.4043

DEMING ES

Commission Directed  Component Funding ‐ FCI Score 0.4043 ‐ Target FCI 0.1234

$1,936,964

0109

12

LARAMIE 1

15

0.4032

DILDINE ES

Commission Directed  Component Funding ‐FCI Score 0.4032 ‐Target FCI 0.1479

$3,596,334

10‐CONDITION/COMMISSION DIRECTED COMPONENT FUNDING SUB‐TOTAL

$26,481,780

Priority 11‐DISTRICT COMPONENT REQUEST ID #

Sub‐Priority

0111

01

0112

District

Project Description

Project Narrative

Budget Amount

Needs Index

Condition/Capacity

FREMONT 6

NA

NA

WIND RIVER JHS/HS ROOF  REPLACEMENT

District's Component Request  Per Commission's Methodology

$1,135,889

02

PLATTE 1

NA

NA

WEST ES ROOF AND  HEATER REPAIR

District's Component Request  Per Commission's Methodology

$663,825

0113

03

FREMONT 25

NA

NA

RIVERTON MS ROOF  REPLACEMENT

District's Component Request  Per Commission's Methodology

$2,772,992

0114

04

HOT SPRINGS 1

NA

NA

THERMOPOLIS MS ROOF  REPLACEMENT

District's Component Request  Per Commission's Methodology

$859,478

0115

05

FREMONT 25

NA

NA

RIVERTON HS ELECTRICAL  DISTRIBUTION UPGRADE

District's Component Request  Per Commission's Methodology

$701,971

0116

06

FREMONT 25

NA

NA

RIVERTON HS CAREER  CENTER ‐ SANITARY LINES  REPLACEMENT

District's Component Request  Per Commission's Methodology

$699,566

0117

07

SUBLETTE 9

NA

NA

BIG PINEY MS ROOF &  COOLING TOWER

District's Component Request  Per Commission's Methodology

$753,346

AiM Property

Page 80 of 91

0118

08

SHERIDAN 2

NA

NA

SHERIDAN HS SCIENCE  ROOM PLUMBING

District's Component Request  Per Commission's Methodology

$565,925

0119

09

FREMONT 25

NA

NA

RIVERTON HS AIR  HANDLING UNIT  REPLACEMENT

District's Component Request  Per Commission's Methodology

$719,031

0120

10

BIG HORN 2

NA

NA

LOVELL HS ROOF  REPLACEMENT

District's Component Request  Per Commission's Methodology

$648,388

0121

11

LARAMIE 1

NA

NA

BAIN ES ALC DCC CONTROLS  District's Component Request  UPGRADE Per Commission's Methodology

$66,492

0122

12

LARAMIE 2

NA

NA

ALBIN ES HVAC CONTROLS  UPGRADE

District's Component Request  Per Commission's Methodology

$99,225

0123

13

FREMONT 25

NA

NA

RIVERTON HS SKYLIGHT RE‐ INSTALLATION

District's Component Request  Per Commission's Methodology.   This is on the previous 2016  component request list as #21.   Projects 1‐19 on that list have  already been funded.  Actual  bids have been received on  several of those projects. This  request is being proposed by SFD  to be funded on the previous list  with unencumbered monies. ‐ Budget for this project is  $477,584

0124

14

LARAMIE 2

NA

NA

ALBIN ES ‐ 60'S ADDITION  HVAC CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology

$68,152

0125

15

LARAMIE 1

NA

NA

COLE ES ALC DDC  CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology

$87,205

0126

16

PLATTE 1

NA

NA

LIBBEY ES FITTINGS,  SANITARY WASTE,  BATHROOM FIXTURES

District's Component Request  Per Commission's Methodology

$116,408

$0

Page 81 of 91

0127

17

LARAMIE 2

NA

NA

BURNS JHS/HS HVAC  CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $227,950

$0

0128

18

LARAMIE 2

NA

NA

PINE BLUFFS JHS/HS VOC  ED HVAC CONTROLS

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $53,635

$0

0129

19

BIG HORN 3

NA

NA

GREYBULL BUS BARN  HEATING INSTALL

District's Component Request  Per Commission's Methodology This is on the previous 2016  component request list as #22.   Projects 1‐19 on that list have  already been funded.  Actual  bids have been received on  several of those projects. This  request will be proposed by SFD  to be funded on the previous list  with unencumbered monies. ‐ Budget for this project is  $203,763

$0

0130

20

FREMONT 25

NA

NA

RIVERTON HS PARKING LOT  REHABILITATION

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $1,559,205

$0

0131

21

SWEETWATER 2

NA

NA

LINCOLN MS ELEVATOR  UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $81,100

$0

0132

22

LARAMIE 2

NA

NA

BURNS JHS/HS ‐ VOC ED  HVAC CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $24,136

$0

Page 82 of 91

0133

23

LARAMIE 2

NA

NA

TRANSPORTATION FACILITY  HVAC CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $12,068

$0

0134

24

LARAMIE 1

NA

NA

FREEDOM ES ALC DDC  CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $214,942

$0

0135

25

LARAMIE 2

NA

NA

ADMIN HVAC CONTROLS  UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $18,772

$0

0136

26

LARAMIE 2

NA

NA

PINE BLUFFS JHS/HS HVAC  CONTROLS UPGRADE

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $122,159

$0

0137

27

UINTA 6

NA

NA

LYMAN HS BOILER  REPLACEMENT

District's Component Request  Per Commission's Methodology.   This is on the previous 2016  component request list as #20.   Projects 1‐19 on that list have  already been funded.  Actual  bids have been received on  several of those projects. This  request is being proposed by SFD  to be funded on the previous list  with unencumbered monies. ‐ Budget for this project is  $260,057

$0

0138

28

SWEETWATER 2

NA

NA

LINCOLN MS EXTERIOR  DOOR & WINDOW  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $643,100

$0

Page 83 of 91

0139

29

SWEETWATER 2

NA

NA

LINCOLN MS INTERIOR  FINISHES

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $947,800

$0

0140

30

PLATTE 1

NA

NA

WHEATLAND BUS GARAGE  PARKING LOT AND  ELECTICAL OUTLETS

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $250,107

$0

0141

31

BIG HORN 2

NA

NA

LOVELL ES INTERCOM, FM  & BELL SYSTEM  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $143,817

$0

0142

32

SWEETWATER 2

NA

NA

LINCOLN MS CASEWORK  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $449,800

$0

0143

33

CAMPBELL 1

NA

NA

WAGONWHEEL ES PARKING  District's Component Request  LOT Per Commission's Methodology

$0

‐ Budget for this project is  $1,017,078 0144

34

BIG HORN 2

NA

NA

LOVELL MS INTERCOM, FM  & BELL SYSTEM  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $106,112

$0

0145

35

NATRONA 1

NA

NA

MANOR HEIGHTS ES  ELEVATOR REPLACEMENT

Districts Component Request Per  Commission's Methodology ‐ Budget for this project is  $901,208

$0

0146

36

NATRONA 1

NA

NA

MANOR HEIGHTS ES  SWAMP COOLER  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $1,265,440

$0

Page 84 of 91

0147

37

NATRONA 1

NA

NA

MIDWEST SCHOOL ROOF  REPLACEMENT

District's Component Request  Per Commission's Methodology ‐ Budget for this project is  $1,075,624

11‐DISTRICT COMPONENT REQUEST SUB‐TOTAL

$0

$9,957,893

Priority 12‐PLANNING ID #

Sub‐Priority

0238

01

District

SFC

Needs Index

Condition/Capacity

NA

NA

Project Description

PLANNING FUNDS

Project Narrative

Planning studies to determine  the most cost effective remedy 12‐PLANNING SUB‐TOTAL

Budget Amount

AiM Property

$300,000

$300,000

Priority 13‐SECURITY ID #

Sub‐Priority

0064

01

District

SFC

Needs Index

Condition/Capacity

NA

NA

Project Description

Project Narrative

SECURITY ELEMENT # 7 ‐  Security Element # 7 D7302 MASS NOTIFICATION  Communication Systems SYSTEMS D7302 Mass Notification Systems

Budget Amount

AiM Property

$0

‐ Budget for this security  element  is $18,785,281 0065

02

SFC

NA

NA

SECURITY ELEMENT # 9 ‐  D7501 MAIN ENTRY

Security Element # 9 Video Surveillance D7501 Main entry ‐ Budget for this security  element  is $2,256,255

$0

Page 85 of 91

0066

03

SFC

NA

NA

SECURITY ELEMENT # 10 ‐  D7505 VIDEO  SURVEILLANCE RECORDING

Security Element # 10 Video Surveillance D7505 Video Surveillance  Recording ‐ Budget for this security  element  is $2,404,441

$0

0067

04

SFC

NA

NA

SECURITY ELEMENT  # 12 ‐  D7410 SITE LIGHTING

Security Element # 12 Site and Perimeter D7410 Site Lighting ‐ Budget for this security  element  is $6,841,832

$0

0068

05

SFC

NA

NA

SECURITY ELEMENT  # 13 ‐  D7401 SITE LANDSCAPING

Security Element # 13 Site and Perimeter D7401 Site Landscaping ‐ Budget for this security  element  is $230,792

$0

0071

06

SFC

NA

NA

SECURITY ELEMENT  # 14 ‐  D7503 KEY INTERIOR AREAS

Security Element # 14 Video Surveillance D7503 Key Interior Areas ‐ Budget for this security  element  is $6,058,010

$0

0069

07

SFC

NA

NA

SECURITY ELEMENT  # 15 ‐  D7502 KEY EXTERIOR AREAS

Security Element # 15 Video Surveillance D7502 Key Exterior Areas ‐ Budget for this security  element  is $10,743,039

$0

0072

08

SFC

NA

NA

SECURITY ELEMENT  # 16 ‐  D7402 SITE VEHICLE  BARRICADES

Security Element # 16 Site and Perimeter D7402 Site Vehicle Barricades ‐ Budget for this security  element  is $8,899,496

$0

Page 86 of 91

0073

09

SFC

NA

NA

SECURITY ELEMENT  # 17 ‐  D7701 CLASSROOM DOOR  CONSTRUCTION

Security Element # 17 Egress and Refuge D7701 Classroom Door  Construction ‐ Budget for this security  element  is $108,323

$0

0074

10

SFC

NA

NA

SECURITY ELEMENT  # 18 ‐  D7702 LOCKDOWN OF  SPECIAL AREAS

Security Element # 18 Egress and Refuge D7702 Lockdown of Special Areas ‐ Budget for this security  element  is $679,260

$0

0075

11

SFC

NA

NA

SECURITY ELEMENT  # 19 ‐  D7102 CLASSROOM DOOR  INSIDE LOCKS

Security Element # 19 Locking Systems / Hardware D7102 Classroom Door Inside  Locks ‐ Budget for this security  element  is $8,614,328

$0

0076

12

SFC

NA

NA

SECURITY ELEMENT  # 20 ‐  D7408 SECURITY SIGNAGE

Security Element # 20 Site and Perimeter D7408 Security Signage ‐ Budget for this security  element  is $715,719

$0

13‐SECURITY SUB‐TOTAL

$0

Priority 14‐DEMOLITION ID #

Sub‐Priority

District

Needs Index

Condition/Capacity

Project Description

Project Narrative

Budget Amount

AiM Property

Page 87 of 91

0080

01

FREMONT 1

1

NOT ASSESSED

"DESIGN" ‐ JEFFREY CITY ES

Unoccupied portion ‐ complete  failure of systems Occupied portion number 4 ‐  2012 Condition List,  21 ‐ 2017 Condition List Commission approved MCER  study May 2017 to demolish  abandoned portion of building.

$388,984

0081

02

FREMONT 1

1

NOT ASSESSED

"CONSTRUCTION" ‐ JEFFREY  Unoccupied portion ‐ complete  CITY ES failure of systems

$1,947,468

Occupied portion number 4 ‐  2012 Condition List,  21 ‐ 2017 Condition List Commission approved MCER  study May 2017 to demolish  abandoned portion of building. 0105

03

CAMPBELL 1

13

0.4137

"DESIGN" ‐ TWIN SPRUCE  JHS ‐ PARISH HALL

Number 13 ‐ 2017 Condition List

$82,981

0106

04

CAMPBELL 1

13

0.4137

"CONSTRUCTION" ‐ TWIN  SPRUCE JHS ‐ PARISH HALL

Number 13 ‐ 2017 Condition List

$398,782

0152

05

CAMPBELL 1

NA

NOT ASSESSED

SAGE VALLEY MODULARS  1  AND 3

Final phase of district's  reconfiguration, 9th graders  moving out of JHS and into HS,  eliminating need for modulars  with regard to capacity.

$39,831

0154

06

CAMPBELL 1

NA

NOT ASSESSED

TWIN SPRUCE MODULARS  1, 2, AND 3

Final phase of district's  reconfiguration, 9th graders  moving out of JHS and into HS,  eliminating need for modulars  with regard to capacity.

$78,119

Page 88 of 91

0151

07

CAMPBELL 1

NA

NOT ASSESSED

CAMPBELL COUNTY HS  MODULARS 1 AND 2

Thunder Basin HS complete this  summer.  9‐12 students to  attend two high schools instead  of one.  North campus modulars  no longer needed for capacity.

$38,081

0150

08

CAMPBELL 1

NA

NOT ASSESSED

MEADOWLARK MODULAR

Elementary capacity has  decreased to 78% in Gillette.   This is a good time to dispose of  uneeded modulars.

$85,962

0155

09

CAMPBELL 1

NA

NOT ASSESSED

WAGON WHEEL MODULAR

Elementary capacity has  decreased to 78% in Gillette.   This is a good time to dispose of  uneeded modulars.

$27,770

0153

10

CAMPBELL 1

NA

NOT ASSESSED

SUNFLOWER MODULAR

Elementary capacity has  decreased to 78% in Gillette.   This is a good time to dispose of  uneeded modulars.

$48,070

14‐DEMOLITION SUB‐TOTAL

$3,136,048

Priority 15‐TRACKS ID #

Sub‐Priority

District

Needs Index

Condition/Capacity

Project Description

Project Narrative

Budget Amount

AiM Property

Page 89 of 91

0181

01

SHERIDAN 3

NA

NA

ATHLETIC FIELD

‐‐ Field Area = 1.3 acres ‐‐ Purpose: PE teaching station  and track facility  ‐‐Components will include: grass  field, 4 track lane with a SFC  standard assembly (3" of asphalt  base and 2 part polly surface).  This track will not include a curb  composed of concrete. Edge  could be thickened with asphalt.  ‐‐ Due to limited space, field  events (shot, discus, long and  triple jump) will be designed to  meet SFC standards if possible.

$40,905

0182

02

SHERIDAN 3

NA

NA

ATHLETIC FIELD

‐‐ Field Area = 1.3 acres ‐‐ Purpose: PE teaching station  and track facility  ‐‐Components will include: grass  field, 4 track lane with a SFC  standard assembly (3" of asphalt  base and 2 part polly surface).  This track will not include a curb  composed of concrete. Edge  could be thickened with asphalt.  ‐‐ Due to limited space, field  events (shot, discus, long and  triple jump) will be designed to  meet SFC standards if possible.

$154,074

15‐TRACKS SUB‐TOTAL

$194,979

Priority 16 ‐ LAND OPPORTUNITY ID #

Sub‐Priority

District

Needs Index

Condition/Capacity

Project Description

Project Narrative

Budget Amount

AiM Property

Page 90 of 91

0237

01

SFC

NA

NA

LAND OPPORTUNITY FUND

Funds to allow districts to aquire  land when and if it becomes  available to address site  requirements in accordance with  SFC standards.

$750,000

16 ‐ LAND OPPORTUNITY SUB‐TOTAL

$750,000

Priority 17 ‐ UNANTICIPATED ID #

Sub‐Priority

0183

01

District

SFC

Needs Index

Condition/Capacity

NA

NA

Project Description

UNANTICIPATED

Project Narrative

SFC unanticipated funds allow  the Commission to account for  unforseen expenses or cost  overruns on projects. 17 ‐ UNANTICIPATED SUB‐TOTAL

BUDGET GRAND TOTAL

Budget Amount

AiM Property

$2,503,938

$2,503,938

$201,269,858

Page 91 of 91

School Facilities Commission Amendment to Budget Recommendations Amendment # 1: Sublette County School District No. 9 – Big Piney Middle School o The school district is requesting that the remaining Big Piney Middle School Design funding ($1,196,016.84) be re-appropriated to renovate existing MS space to provide ADA compliant restrooms, replace the locker rooms and renovate the existing (boy’s) locker room to serve as special education classroom and renovate an existing special education classroom to a computer lab. o During the July 2017 Commission meeting, the Commission acknowledged the district’s request and directed SFD to work with the Select Committee and the Legislative Services Office (LSO) to allow for design funds to be re-appropriated to renovate existing MS space to provide ADA compliant restrooms, replace the locker rooms and renovate the existing (boy’s) locker room to serve as special education classroom and renovate an existing SPED classroom to a computer lab. Amendment # 2: Crook County School District No. 1 – Moorcroft K-8 o The school district received an appropriation to construct a new K-8. Due to limited availability of land, the district chose to construct the school on a constrained site, placing the facility in the existing parking lot for the High School (HS) which limited parking. The school is complete and occupied. In October of 2016, one of the adjacent land owners presented to the district that they were willing to sell property. The district pursued land opportunity funds from the SFC and acquired the land in March 2017. The district would like to utilize remaining funds that were appropriated for the New Moorcroft K-8 building to construct a parking lot and track/field facility on the newly purchased land. o During the July 2017 Commission meeting, the Commission acknowledged the district’s request and directed SFD to work with the Select Committee and the Legislative Services Office (LSO) to allow for budgeted not contracted funds in the amount of ($1,938,460.16) remaining in the construction budget to be re-appropriated to design and construction of a parking lot and track/field facility.

School District Request District Request # 1: Sheridan County School District No. 3 – Bus Barn The district’s bus barn burned down January 1, 2016. The fire was started by an electrical short in one of the bus camera systems. The facility was a total loss and the district lost 3 of its 5 buses. The school district has been working with its insurance company, Travelers, for over 14 months to get the facility replaced. The project went to bid in March of 2017 and was awarded to Fletcher Construction. Due to the close proximity of these structures, the fire code requires that all 3 buildings have a sprinkler fire suppression system. The State Fire Marshall will allow a 1–2 year grace period for the sprinkler system to be installed in all 3 buildings. Buildings #1 will be paid for by the insurance company and building # 2 paid for with major maintenance. The district is requesting building # 3 be funded by the State of Wyoming in the amount of $90,000.00.

Other Budget Considerations – Tab 8 – Page 1 of 1

2017 Annual Report and 2019-20 Biennial Budget ...

2017 Annual Report and 2019-20 Biennial Budget Request_September.pdf. 2017 Annual Report and 2019-20 Biennial Budget Request_September.pdf. Open.

7MB Sizes 7 Downloads 386 Views

Recommend Documents

Maine's Biennial Budget - Beacon Hill Institute
The additional spending would add to private .... extent of government programs is a recurring theme promoted by supporters of activist government, particularly ...

Maine's Biennial Budget - Beacon Hill Institute
government in two respects: on the state depreciation schedule for business ... The estate tax changes would increase investment insofar as it applied to small family-owned .... BHI utilized its STAMP (State Tax Analysis Modeling Program) model. ...

2017-2018 Annual Budget Proposal.pdf
Page 1 of 8. 1. 2017-2018 Annual Budget Proposal. Along with Treasurer Harrison Sattley and the Budget Committee, I am proud to present the 2017-2018 Annual Budget. Proposal. Per the Budget Committee Bylaws of the Pitzer College Student Senate, the S

SVP Annual Report 2017.pdf
Page 1 of 8. Solar Village Project has made substantial. progress on multiple fronts in the past year. This report summarizes the projects we. have implemented and describes plans for. extending our work to include solar water. pumps and enhancing ou

PFBC 2017 Annual Report-Senate-GameFisheriesCmte-Final.pdf ...
agency has undertaken for the benefit of the Commonwealth's anglers and boaters – from. hatcheries and fisheries management to law enforcement and public outreach. However, fiscal year 2017 will be a pivotal year for the agency, a time when expendi

Annual Report 2016-2017.pdf
Page 3 of 9. Annual Report 4 5 2016-17. A WORD FROM. THE CHAIRPERSON. As the Centre for School Leadership (CSL) completes the second year of. its work, 2016-2017, all those associated with it can reflect with joy and. satisfaction on its continuing p

Annual Report 2017.pdf
Friends of Indian River http://friendsofindianriver.org Page 3 of 5. PO Box 13772, Chesapeake, VA 23325. Walkable and Bikeable Community. The Indian River-Oaklette Bridge is the bridge. that ties together the northern halfs of our. community. And if

Annual Report 2016-2017.pdf
Page 3 of 29. ONYVA – Annual Report 2016/2017 3. 1. ABOUT ONYVA. ONYVA is a not-for-profit organisation, created in 2009, which aims to provide support and. opportunities to children in need of care and protection in India. ▻ Vision. ONYVA envisi

Annual Security Report 2017.pdf
police officer) employed in NYS to principally perform one or more of the following duties, and the person is not. performing the functions of a private investigator as defined in Section 71 of Article 7 of the General Business Law: Whoops! There was

Annual Report 2017.pdf
A strong public school is the backbone of the community. The Yarmouth Schools continue to be. recognized as high performing, more efficient schools; a result ...

VFN Annual Report 2017.pdf
Page 1 of 2. In June of 2017, Executive Director Meghan Sheradin left the Vermont. Fresh Network to lead the Vermont Grass Farmers Association. Helen. Labun joined the team as the new Executive Director. The 21st Annual Forum Dinner at Shelburne Farm

Annual report 2016 2017.pdf
presentations, PTA Discos, the Year 5 show of 'Singin' in the Rain', choir and musical performances. The Centre. is also very well utilised as part of our PE/sport ...

Climate Action Team Biennial Report, Draft Report - California Energy ...
Feb 27, 2006 - 2 Economic Impacts of Climate Change on California . ...... precipitation, and solar radiation—drive the simulation. The model uses ..... California's water and hydropower energy resources are also vulnerable to climate change ...

HRF Annual Report 2017.pdf
OSLO FREEDOM FORUM 34. 2017 Oslo Freedom Forum. Oslo Freedom Forum in New York. 36. 42. Vaclav Havel International Prize For. Creative Dissent 52.

JGIA Annual Report 2017.pdf
Page 2 of 20. Table of Contents. Joint Chair/CEO Statement 2. A Letter from Jane 3. Our History 4. Our Purpose 4. Our Strategic Plan 6. Our Operations 7. Our Global Commitments 7. Our Family 9. Jane's 2017 Australian Tour 10. Our Impact 12. Roots & S

Quaboag Annual Report 2017 final.pdf
Page 1 of 52. Page 1 of 52. Page 2 of 52. Page 2 of 52. Page 3 of 52. Page 3 of 52. Quaboag Annual Report 2017 final.pdf. Quaboag Annual Report 2017 final.pdf. Open. Extract. Open with. Sign In. Details. Comments. General Info. Type. Dimensions. Size

LIVELYHOODS ANNUAL REPORT 2017 web.pdf
if you go around the mountain's vast national park. Kitui. County population: 1 million. Cookstoves sold in 2017: 214. A small town in Eastern Kenya, with a hot, ...

Annual Gender and Development Accomplishment Report 2017.pdf ...
GAD MOBILIZATION FUND. Capacity development on GAD ... Irrigation Network Services. (improved/constructed) .... malnutrition Nutrition Program. Provision of ...

Climate Action Team Biennial Report, Draft Report - California Energy ...
Feb 27, 2006 - 2 Economic Impacts of Climate Change on California . ..... Resources, Ocean Protection Council, Department of Forestry and Fire Protection, ..... North Pacific storms, which elevate sea level due to wind and barometric effects,.

2016 and 2017 annual report on independence - European Medicines ...
Apr 11, 2018 - The European Commission requested in January 2015 that “the independence policy and its state of implementation” should be put on the agenda of the Management Board annually. EMA policies on independence have been discussed at a nu

2016 and 2017 annual report on independence - European Medicines ...
Apr 11, 2018 - The graph below shows the distribution of staff's interest levels for all EMA .... products, e.g. rapporteurships for signal assessment and periodic.

Annual Budget - City of Mobile
The accounts of the General Fund reflect the major share of the city's fiscal transactions. It ... meticulous management of head-count and overtime. ... The city is also upgrading to a modern and efficient, citywide software system, ... becoming the

annual report 2015 - PDFKUL.COM
The African Institute for Mathematical Sciences (AIMS) is a pan-African ..... For the first time humanity is up against an environmental change of .... in science and engineering at leading universities worldwide. ..... of Quantum Chemistry. 115(1) .

2014 ANNUAL REPORT
growth in nearly every important measure of technology transfer success, and 2014 was no exception. .... Award for driving business growth, jobs and economic ...