CERTIFICATE OF PERMANENT LOCATION FOR A MANUFACTURED HOME SUBJECT TO A LONG-TERM LAND LEASE Effective July 1, 2009, the owner(s) of a manufactured home that is permanently affixed to the ground so that it is no longer capable of being drawn over the public highways and is subject to a long-term land lease of at least 10 years shall record a Certificate of Permanent Location for a Manufactured Home Subject to a Long-Term Land Lease (Certificate of Permanent Location, LTL) in the office of the county clerk and recorder. For a manufactured home that is titled, the Certificate of Permanent Location, LTL must include an application to purge the Certificate of Title. For a new manufactured home, the Certificate of Permanent Location, LTL must include a copy of the Bill of Sale and the Manufacturer’s Certificate or Statement of Origin,§ 38-29-202, C.R.S. Please print or type. __________________________________________________________________________________________________________ 1. Recorded Certificate of Permanent Location, LTL should be returned to: (Name and mailing address) __________________________________________________________________________________________________________ 2. Name(s) and mailing address(es) of owner(s)/debtor(s) of the manufactured home: __________________________________________________________________________________________________________ 3. Name(s) and mailing address(es) of security interest/lien holder(s) of the manufactured home: __________________________________________________________________________________________________________ 4. Name(s) and mailing address(es) of owner(s)/debtor(s) of the real property: __________________________________________________________________________________________________________ 5. This Certificate of Permanent Location, LTL pertains to the manufactured home identified below: Serial No.: _____________________________________

Certificate of Title/Origin No.:__________________________

Manufacturer/Make: _____________________________

Length/Width: _____________________________________

Year: _________________________________________ HUD No.: _________________________________________ _________________________________________________________________________________________________ _ ____ 6. Legal description of land subject to a long-term lease to which the manufactured home identified in section 5 will be permanently affixed (include county name): Property Address: Parcel/Schedule No.: ___________________________________________________________________________________________________ ___ 7. Tax authentication: Attach to this form a Certificate of Taxes Due or a manufactured home Authentication of Paid Ad Valorem Taxes (Authentication) issued by the county treasurer of the county in which the manufactured home is located. (It is not necessary to record the Certificate of Taxes Due or the Authentication form.) _____________________________________________________________________________________________________ __ 8. Verification that the manufactured home is on a permanent foundation in accordance with any applicable city and/or county codes or requirements. Authorized Signature and Title ___________________________________________Date_______________________________ _____________________________________________________________________________________________________ __ 9. The titled manufactured home identified herein was “Purged Ad Valorem” as indicated on the attached letter from the State Division of Motor Vehicle dated: _______________________________ _____________________________________________________________________________________________________ __ 10. Consent and lien release: The undersigned security interest/lien holder(s) consent to permanent location of the manufactured home on the land subject to a long-term lease as identified above and hereby release any lien on the manufactured home. (Attach additional sheets if necessary):

Authorized agent of real property security interest/ lien holder Signature

Title

Date

Authorized agent of manufactured home security interest/lien holder Signature

Title

Date

State of Colorado County of ________________________________________

State of Colorado County of ________________________________________

The foregoing was acknowledged before me this _____ day of _____________, 2_____, by the authorized agent of the security interest/lien holder named above.

The foregoing was acknowledged before me this ______day of ____________, 2_____ , by the authorized agent of the security interest/lien holder named above.

Witness my hand and official seal: My commission expires: ______________________ ___

Witness my hand and official seal: My commission expires: ________________________

_____________________________________________ Notary Public

____________________________________________ Notary Public

11. Acknowledgement and Reversion: Under penalty of perjury in the second degree, § 18-8-503, C.R.S., the undersigned owner(s)/debtor(s) hereby certify that all security interest/lien holder(s) are identified on this Certificate of Permanent Location, LTL or any attachments hereto. All owners/debtors of the real property and the manufactured home consent to the affixation of the manufactured home to the real property described herein and acknowledge that the home becomes part of the real property after it is affixed to the ground and the Certificate of Permanent Location, LTL is recorded. The owners of the real property and the manufactured home also acknowledge that, upon termination of the long-term land lease, the ownership of the manufactured home reverts back to the homeowner(s). § 38-29-202(2)(l.5), C.R.S. _________________________________________________ Signature of real property owner/debtor Date

_________________________________________________ Signature of manufactured home owner/debtor Date

Print name __________________________________

Print name __________________________________

Address ____________________________________

Address _____________________________________

State of Colorado County of _________________________________________

State of Colorado County of _________________________________________

The foregoing was acknowledged before me this _____ day of ____________, 2______, by the owner/debtor named above.

The foregoing was acknowledged before me this _____day of ____________, 2______, by the owner/debtor named above.

Witness my hand and official seal: My commission expires: __________________________

Witness my hand and official seal: My commission expires: _________________________

______________________________________________ Notary Public

_____________________________________________ Notary Public

15-DPT-AR MH 306-09/09

Instructions for Completing Certificate of Permanent Location for a Manufactured Home Subject to a Long-Term Land Lease Effective July 1, 2009, the owner(s) of a manufactured home that is permanently affixed to the ground so that it is no longer capable of being drawn over the public highways and is subject to a long-term land lease of at least 10 years, shall record a Certificate of Permanent Location for a Manufactured Home Subject to a Long-Term Land Lease (Certificate of Permanent Location, LTL) in the office of the county clerk and recorder, § 38-29-202, C.R.S. For a manufactured home that is titled, the Certificate of Permanent Location, LTL must include an application to purge the Certificate of Title. For a new manufactured home, the Certificate of Permanent Location, LTL must include a copy of the Bill of Sale and the Manufacturer’s Certificate or Statement of Origin, § 38-29-202, C.R.S. The Certificate of Permanent Location, LTL must include a copy of the land lease, an application to purge the Certificate of Title (if the manufactured home is titled) or a copy of the Bill of Sale and the Manufacturer’s Certificate or Statement of Origin (if the manufactured home is new). Section 1: Insert the name and address of the person to whom the county clerk and recorder should return the Certificate of Permanent Location, LTL. Section 2: Insert the full legal name and mailing address of each owner/debtor of the manufactured home. Each owner/debtor must be listed separately. Attach additional sheets as necessary. Section 3: Insert the full legal name and mailing address of each security interest/lien holder of an unsatisfied security interest or lien against the home to which the manufactured home has been affixed. Each security interest/lien holder must be listed separately. Attach additional sheets as necessary. If no security interest/lien holder exists, insert N/A. Section 4: Insert the full legal name and mailing address of each owner/debtor of the real property. Each owner/debtor must be listed separately. Attach additional sheets as necessary. Section 5: The manufactured home’s serial number, manufacturer/make, and year of construction must be completed. Include the Certificate of Origin or Certificate of Title number, length and width, and, if available, the HUD number. Section 6: Insert the legal description of the land to which the home is affixed, including the county name. address and the parcel or schedule number assigned by the county assessor.

List the property

Section 7: Either the Certificate of Taxes Due or a manufactured home Authentication of Paid Ad Valorem Taxes issued by the county treasurer must be attached. Property taxes on the manufactured home must be paid prior to permanently affixing the manufactured home to the land unless the home is directly coming from the manufacturer, a dealer’s display lot, or another state. It is not necessary to record the Certificate of Taxes due or the Authentication form; however, the document must be attached for verification purposes. Section 8: If required by the county in which the manufactured home will be permanently affixed, the signature of an authorized person designated by the governing entity is required to verify that the home is situated on a permanent foundation in accordance with any applicable city and/or county codes or requirements. If no applicable city and/or county codes or requirements exist, the signature of the owner/debtor affirms, under penalty of perjury, that the manufactured home is situated on a permanent foundation. Section 9: The owner of a titled manufactured home which will be permanently affixed to the land must file an application to purge the Certificate of Title. The State Division of Motor Vehicle must issue a “Purged Ad Valorem” letter to the property owner. The “Purged Ad Valorem” letter must be attached to the Certificate of Permanent Location, LTL before the certificate can be recorded. If the manufactured home is new and a Certificate of Title was never issued, the Certificate of Permanent Location, LTL must include a copy of the Bill of Sale and the Manufacturer’s Certificate or Statement of Origin. Section 10: Each owner/debtor and security interest/lien holder(s) of the manufactured home and real property must sign and date the Certificate of Permanent Location, LTL. The signature(s) of the security interest/lien holder(s) verify relinquishment and release of all rights in the manufactured home by security interest/lien holder(s). Attach additional sheets as necessary. Section 11: The owner(s) of the manufactured home and the owner(s) of the real property subject to the long-term lease must consent to the affixation of the manufactured home to the real property. The owner(s) of the real property and the owner(s) of the manufactured home must acknowledge that the home becomes part of the real property after it is permanently affixed and the Certificate of Permanent Location, LTL is recorded. The owners of both the real property and the manufactured home acknowledge that, upon termination of the long-term land lease, the ownership of the manufactured home reverts back to the homeowner(s). Notes: Once the manufactured home has become part of the real property, it is unlawful to remove the home from the real property without the express consent of the land owner(s) and all security interest/lien holders. If the manufactured home is moved from the location identified in section 6 of the Certificate of Permanent Location, LTL, the owner(s) of the manufactured home must complete a Certificate of Removal for a Manufactured Home, § 38-29-203, C.R.S. and apply for a new Certificate of Title.

2015 Cert of Perm Location Long Term Lease.pdf

Page 1 of 50. UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS. International General Certificate of Secondary Education. MARK SCHEME for the May/June 2011 question paper. for the guidance of teachers. 0620 CHEMISTRY. 0620/12 Paper 1 (Multiple Choice), maximum raw mark 40. Mark schemes ...

24KB Sizes 1 Downloads 98 Views

Recommend Documents

Long-Term Load Forecasting of Jordanian - ijeecs.org
May 1, 2013 - natural resources, his imports from energy represent around ... [3] . (ii) Nonlinear models such as Artificial. Neural Networks (ANN) [4], Support Vector ..... Load Forecasting, Renewable Energy, Nuclear Energy, Economic and.

Long-Term Load Forecasting of Jordanian - ijeecs.org
May 1, 2013 - 95% of his consumption [2] , around every ten years has a waves of refugees come in, and with the big fluctuation in energy prices, long-term load forecasting represent really a challenging ... 1; one input layer (source nodes with ....

Parallel Pursuit of Near-Term and Long-Term Mitigation.pdf ...
Page 1 of 2. 526 23 OCTOBER 2009 VOL 326 SCIENCE www.sciencemag.org. POLICYFORUM. It is well accepted that. reduction of carbon diox- ide (CO2. ) emissions is. the lynchpin of any long-term. climate stabilization strat- egy, because of the long life-

3G Long Term Evolution - 3g4g.co.uk
Mar 27, 2007 - FDD preferred if paired spectrum available ... layer transmission, and to enable frequency-domain channel ... time-domain already for HSPA.

3G Long Term Evolution - 3g4g.co.uk
Mar 27, 2007 - EPC: Evolved Packet Core. MME: Mobility Management ..... and unicast on the same carrier as well as dedicated multicast/broadcast carrier ...

Determinants of Short-term Lender Location and ...
Springer Science+Business Media New York 2014 ... that do not limit interest rates or fees on payday and small-dollar loans.1 This reduces the .... A secondary result that we get from our survey responses is an estimate of the size of the ..... The n

2015-05-04 Nota Perm Cons Prince George.pdf
2015-05-04 Nota Perm Cons Prince George.pdf. 2015-05-04 Nota Perm Cons Prince George.pdf. Open. Extract. Open with. Sign In. Main menu.

Social - economic imapacts of long-term unemployement of Slovakia
Anna Burdová. St. Alžbeta University of healthcare and social – work in Bratislava ... The thesis specifies different tools and activities of ..... Publishing, 2013.

Social - economic imapacts of long-term unemployement of Slovakia
backup, because this problem is ..... services by unemployed people. In the .... [online]. Multimediálne centrum OADK, Dolný. Kubín, 2004 [citované 2010-11-10].

Animal models of long-term consequences of early exposure to ...
neonatal intensive care units (NICUs) experience repeated painful events ... There are also emerging data that indicate there may be long-term consequences.

Short-Term Momentum and Long-Term Reversal in ...
finite unions of the sets C(st). The σ-algebras Ft define a filtration F0 ⊂ ... ⊂ Ft ⊂ . ..... good and a price system is given by q ≡ {q1 t , ..., qK t. }∞ t=0 . Agent i faces a state contingent solvency constraint, B ξ i,t(s), that limi

short-term or long-term - European Medicines Agency - Europa EU
Sep 26, 2016 - Stage 1 Online registration . ..... In the case of specialist or further training, candidates must specify whether the course was full-time or part-time ...

Exploiting the Short-Term and Long-Term Channel Properties in ...
Sep 18, 2002 - approach is the best single-user linear detector1 in terms of bit-error-ratio (BER). ..... structure of the mobile radio channel, short-term process-.

Animal models of long-term consequences of early exposure to ...
issues related to animal studies of the long-term consequences of early exposure to repetitive pain so that the studies are comprehensible and can be critiqued for relevance to clinical situations. It is well documented that neonates and infants in n

Housing & Long-Term Care Comparison Chart_BILINGUAL_8.5x11 ...
Housing & Long-Term Care Comparison Chart_BILINGUAL_8.5x11.pdf. Housing & Long-Term Care Comparison Chart_BILINGUAL_8.5x11.pdf. Open. Extract.

Long Term Care Disaster Preparedness Conference Flyer.pdf ...
Page 1 of 1. June 2-3, 2014. Colorado Springs Marriot. 5580 Tech Center Dr, Colorado Springs, CO 80919. Resolve to be. Ready. The conference will focus on ...

UNIDIRECTIONAL LONG SHORT-TERM ... - Research at Google
ABSTRACT. Long short-term memory recurrent neural networks (LSTM-RNNs) ... INTRODUCTION. Statistical parametric speech synthesis (SPSS) [1] offers various ad- .... services; if a user enter a very long text as input for TTS, its latency.

3G Long Term Evolution
Mar 27, 2007 - 3G LTE – Bandwidth flexibility. ▫ LTE physical layer supports any bandwidth from ∼1.25 MHz to well beyond 20 MHz in steps of ∼200 kHz (one ...