1. BACKGROUND

2. PROBLEM STATEMENT

• Landslide is a natural disaster which is caused by

 Lost of lives and damage to property mainly due to the lack of emergency alarm system  Existing products are too expensive which use complex and advanced technologies

several factor which can be natural factor or forced factor. • When land slide occur it may lead to lost of lives and the damage to properties.

4. LITERATURE REVIEW

3. OBJECTIVE  To fabricate an alert system to warn the community on possible indication of land slide.  Build an affordable alarm system.

1. Causes of Land Slide  High pore water pressure on soil  Slope movement due to the angle of the slope  Human activities as the forced factor *Graph of slope angle vs landslide frequency that lead instability of soil.

5. METHODOLOGY Research and study on current technology

Problem Identification

Search for possible solution

2. Available Alert Technology  Geographic Information Systems (GIS) and neural network  The fibre optic optical time domain reflectometry (OTDR)  Loughborough’s device - these technologies are complex and expensive.

No yes

No

Complete Product

working

Product design

Fabrication

6. DESIGN CONCEPT AND OPERATION

Open circuit

close circuit

Land slide scenario

sensor

• parallel connection to stabilize the voltage •Self- made sensor from copper cylinder with hanging pendulum • manipulate the change of angle to indicate landslide

Sensor operation

Emergency lamp Copper cylinder

Holder wire

7. COST ANALYSIS

Siren

No. 1

Items Copper Sheet (A4 size)

Quantity

Price (RM)

1 sheet

12.00

battery

pendulum

2

Warning Light (12V)

1

28.00

3

Siren

1

20.00

4

Rechargeable Lead Acid Battery (12V)

1

48.00

5

Bearing

1

2.20

6

Plastic Box with Cover

1

18.80

7

Perspex layer

1

30.00

TOTAL

ETP GROUP 42 MEMBERS: MUHAMMAD FAWWAZ BIN MOHAMAD LAWI MUHAMMAD SYAFIQ BIN SAMSUDDIN MUHAMMAD SAIFUL AMIR BIN FADZIL SANUSI NORHAFIZAH BINTI AHMAD JUNAIDI NURUL WAHIDA BINTI ABDULLAH MOHAMMED ABDULLAH SAEED HAZAEA

158.00

13221 13256 13250 13484 13351 12946

Battery characteristic: •12V-4.5AH •Rechargeable •Life more than 3 years. •Durable With current discharge from circuit 0.9 Amp The battery may withstand T=AmpHour Amp consume T=5hours

8. CONCLUSION • Our team has successfully produced a simple and easily maintained landslide alert that is affordable by community which cost about RM158 • the alert are using emergency red light and siren to indicate land slide. • This device will alert people if there is any change in soil structure about 20˚ to 30˚ so that people around the area can prepare for emergency procedure.

SUPERVISOR: Dr. Hasnah bt Mohd Zaid

1. background 4. literature review 5. methodology 6 ... -

advanced technologies. • parallel connection to stabilize the voltage. •Self- made sensor from copper cylinder with hanging pendulum. • manipulate the change ...

2MB Sizes 0 Downloads 194 Views

Recommend Documents

5 3 5 5 5 5 5 1 1 1 7 3 3 35 1 1 1 2 6 5 6 5 5 1 23 4 ... -
Then. Faith. 54351 1. 5 5321. 1 1671 all on truth hearts is our o'er all with the strength ev - girt love vic - be. 'ry a - a - to -. 1 1653 gainst faith, vat - on - is the they tion's ward the foe like hel - from glor- in a met the ious. 3 3 32 3. 5

Background Data and methodology - egbetokun
Data and methodology. The analysis is based on a pooled cross-sectional dataset from two large surveys carried out in 2007 and. 2011 on entrepreneurial ...

( ) ( 0 1 2 3 4 5 6 7
0 1 2 3 4 5 6 7 8 4 9 7 @ A B 2 C D 2 C E 8 4 1. F 2 G 8 2 4 E 7 4 8 G 4 4 A 7 ..... Ж y Е b R S W c V P Q V U X V Q v V V e b a U X V b i Г V W U Б e c P T U X V W ...

1 Towards a Methodology for Literature Reviews in ...
Two types of reports can be produced: descriptive analysis of all results .... CHECK. • Descriptive (process and overall statistical data on final results). • Thematic ...

4 Review of selected material, Lectures 1-5
i=1 is a partition of [0, 1], and the h(ti)'s are square-integrable, F(ti)-adapted random variables. H is thus an F(r)-adapted process, with left-continuous sample paths. H is termed a simple process; let S denote the collection of all such processes

ndd 4 5 6.pdf
ad-lovers watching are the sure-fire winners. Jogging remains a popular choice for those intending. to give up a new exercise routine after 1-4 attempts. Hockey, despite broadcast silence, remains mighty. MOVIE AND TELEVISION REVIEWS! Chicken Run: (A

1 Introduction and Literature Review
based software package (PEPS2007) and comparisons with known results are made. ... Buchholtz (1999) proposed the structured analysis technique to.

1 Introduction and Literature Review
Modeling Exponential Reliable Production Lines using Kronecker Descriptors ... Under non restrictive assumptions, many systems such as computer, commu- nication ... is associated with a highly efficient computer memory storage process in.

2. Background 5. Conclusion 1. Introduction 3 ...
1. Introduction. With the advent of the photonic crystal a new concept in fiber optics called photonic crystal fiber. (PCF) has come to forefront in fiber research.

Holiday Preparation Isaiah 40:1-5 Background of Isaiah. Some ...
Israel of coming judgment for their sin because God is holy. o The 27 NT books focus on the good news of Christ's reconciliation. Isaiah's last 27 chapters speak.

Holiday Preparation Isaiah 40:1-5 Background of Isaiah. Some ...
Dec 9, 2012 - Make sure you have a support group. Be prepared to feel different, odd and (at times) alone. Make time for him in your BUSY schedule through ...

Page 1 Noon 4 pm - 5pm 4:30 pm 5 pm - 6:30 6 pm 6 pm 8 pm 3-5 pm ...
Greased Pig - Events Center (Entry Fee $5–Prizes–Five Age Divisions- 6-7, 8-10, 11-14, 15-18, 19 & UP. 2016 San Miguel Basin Fair Kick Off BBQ – Events ...

Holiday Preparation Isaiah 40:1-5 Background of Isaiah. Some ...
Dec 9, 2012 - Background of Isaiah. Some intriguing parallels between the book of Isaiah and the Bible as a whole. o The Bible has 66 books / Isaiah has 66 chapters. o The 39 OT books emphasize God's holiness and warn of judgment. Isaiah chapters 1-3

1 Background 2 Goals 3 Approach 4 Challenges - GitHub
code for the feed forward network required major modifications at every level in order to accomadate. The existing application of NEAT to Flappy Bird was not ...

Page 1 !"#$% " &'(#!#) $ %*('+*,- ./)0+$( 1 2/'(3%+4,#) 5#6*7%$8' 9 ...
¡lВ. klmW hYС мС hВX. ¡lВ. klmW hYС мС hВX. ¡lВ. klmW hYС мС hВX. 1N@J. @NN NNN sL. 1N19. GA J@G sL. 1NO@ u@ Ou1 sL. 1N@D. 9J @Ou sL. 1NuN. G1 DA9 sL. 1NO1. 1D AJA sL. 1N@9. 9O 1DG sL. 1Nu@. GN NN1 sL. 1NOu. 1A J@D sL. 1N1N. 9@ O19

"$ # % ' &) ( &0 1 2 3 4 5 &) (" !1"7 6 ¦8§ ¦8©"@ 9
Oct 27, 2004 - Global Motion Trajectory from Sequence Foreman. Fig. 3. Temporal Subshot Segmentation Result from Sequence. Foreman Using 57698@§ACBD@ =0.8/sec, E9FACG =3H /fr; Last IQP R9 SQ TV U. 4. EXPERIMENTAL RESULTS AND DISCUSSIONS. The experim

5-6 NonAcademicGrievancePolicy (1).pdf
Dec 1, 2015 - to the allegations. Any action or practice can be complained at the informal. level, that is, through direct discussion with the relevant employee.

1 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. DISE 11.
Downloaded From:prashantgavaniya.blogspot.in. Downloaded From:prashantgavaniya.blogspot.in. Page 2.. 12. 13. 14. 15. 16. 17. 18. 19. 1. 2. 3. 4. 5. 20.. 1. 2. 3. 4. 5. Downloaded From:prashantgavaniya.blogspot.in. Page 3... Downloaded From:prashantga

Page 1 01 1 234567895 8 6 59590 0 6 5 !""! # $% &' (')* +', -'. + ' /0(1 ...
"#"$%&'()*#+,%%-.$/01"(*'/2(*2*(/*%(3+%4/'/'+'//.(. '/5(%#("3*"/.(*(.6*/,78+6,*'3+*"(%*.(,9/,')2*%12'61#. (%,+'//'+'/9*",:*$':*7%('/9*),+$':*7%**'(9*%;*+$':*7%+$,+*. */'$9,"#':'(),*1;*:+3(.4/'*./'*2.5:*7%,+*1/8((/$,&

7 3 2 × 6 1 3 7 6 × 3 4 2 1 1 × 8 9 7 8 6 × 5 7 6 6 7 × 4 ...
Free Math Worksheets @ www.mathworksheets4kids.com. 1). 7 3 2. × 6 1. 2). 3 7 6. × 3 4. 3). 2 1 1. × 8 9. 4). 7 8 6. × 5 7. 5). 6 6 7. × 4 5. 6). 9 7 8. × 2 8. 7). 2 6 8. × 1 6. 8). 9 3 2. × 7 5. 9). 5 2 6. × 8 4. 10). 6 9 7. × 3 1. 11). 9

Work Book 4-5-6.pdf
A ;OHUR`V\*HU0[HRLHU`VM[OLIVVRZV\[& ... What's the matter?/Is something wrong? I wish I had helped my .... Displaying Work Book 4-5-6.pdf. Page 1 of 12.

SOA NOTES UNIT 4 5 6.pdf
Page 3 of 117. SERVICE ORIENTED ARCHITECTURE Notes By Professional Cipher ref Thomas Erl - www.professionalcipher.com. www.professsionalcipher.com Page 1. Content. UNIT - 4. BUILDING SOA. SOA Delivery Strategies- SOA delivery lifecycle phases. Servic

cartes images 3 4 5 6.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. cartes images 3 ...